- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Electrical Engineering Resume Samples
Electrical Engineer Resume Samples
No results found
6-10 years of experience
Designed and maintained standard product line of temperature, vacuum, and pressure controllers utilizing my experience with OEM devices, engineering knowledge and design skills.
- Completely updated and resigned the product line of temperature, pressure and vacuum controllers improving manufacturing cost and reducing manufacturing time by as much as 50%.
- Employed my knowledge of IEC 61010; IPC 600; IPC2221 to redesign the control circuitry.
- Established standard assembly, test and inspection procedures, introducing production travelers, inspection reports and test reports for all units. This reduced our warranty returns to zero within a year.
- Developed new technical information and specifications for advertising.
- Attending trade shows quarterly to provide technical applications knowledge.
- Designed and developed the company’s first interactive website in 2000 increasing sales 35 % while reducing overhead for order entry.
10+ years of experience
Developed the film lamination and optical bonding solutions, over 30 projects for 2in. to 55in. LCD panel optical enhancement in higher brightness and contrast ratio to meet customers’ special requirements, from the measurement and qualification of the products to its specifications; Created mass-production procedures
- Experimented and chose the optical gel to reduce the cost by 80 percent and still kept the optical performance.
- Created the optical bonding fixtures and processing technique with the lowest cost.
- Designed the integration solutions for LCD and touch panel to improve the optical performance and performed I/O AD board firmware test and interface improvement.
0-5 years of experience
- Improved a prototype validation tool by fabricating custom PCBs, connectors, and cables.
- Constructed PCB layouts on Eagle CAD and manufactured them using LPKF milling machine.
- Designed circuitry to improve noise protection in temperature and humidity sensing of a system.
- Performed data acquisition, optimization, GUI development with GUIDE, and debugging using MATLAB.
- Manufactured custom SolidWorks-designed parts using MakerBot Replicator 2X 3D Printer.
0-5 years of experience
United Infrastructure Projects/UIP (USACE/US Government Contractor), with around 130 staff
- Worked on 35 Design Build Construction projects up to $ 38M as a US Army corps of engineering contractor
- Assistant design manager, Performed detailed design plans, drawings, diagrams, load analysis, and specifications
- Planned and scheduled design phases, attended design and client meetings, created RFIs,
- Review and revise As-Build drawings, monitored project production and quality, created redlines
0-5 years of experience
Responsible for cost, schedule, design, development, validation, fabrication, test and integration of flight wire harness assemblies
- Provided technical expertise and recommendation to government agencies, NASA Wallops Flight Facility, related to cable and harness
- Reviewed test results and identified root cause for hardware failures through design review and performed nonconformance dispositions
- Performed analyses to evaluate power needs for various systems
- Implemented several process improvements and streamline most wire/cable harness procurement, manufacturing changes and Quality Assurance (QA) inspection points
- Compliant to various internal and external specification including NASA-STD-8739.4, JPL D-8208, MIL-HDBK-83575, and IPC/WHMA-A-620 per program requirements
10+ years of experience
Developed Automated Test Equipment (ATE), Test Program Sets (TPS), generated associated documentation, resolved production issues, and supported all aspects of the Mast-Mounted Sight (MMS) program (company’s largest revenue program) traveling as needed.
- Upgraded a 1980’s era test system to a PXI based system running C++ and Fortran 77.
- Designed and implemented automated test sets for the MMS system processor, power supply LRU’s, and associated analog/digital CCA’s.
- Established, implemented, and maintained production test equipment to a baseline and defined test methods to meet functional specifications and assure product integrity.
- Troubleshot test stations and CCA’s to the component level to resolve production test issues.
- Optimized test performance via data collection and statistical analysis.
- Developed Test Requirement Documents (TRD), Automated Test Procedures (ATP), Assembly Drawings, Assembly Procedures, etc.
0-5 years of experience
Design and development of optical medical device to detect esophageal cancer in the Barrets region.
- Designed and adapted diagnostic optical solution for cervical cancer detection to detecting
- Composed and co-wrote most of the primary documents in accordance with
- Produced three clinical instruments and participated in clinical trials.
- Extensive testing, test plans, post processing data analysis
0-5 years of experience
NanoConversion Technologies designed and developed the C-TEC, an efficient, low-cost thermoelectric device.
- Designed and developed an automated data acquisition system for C-TEC test stations
- Wrote Python libraries to control: Keithley multimeters, Eurotherm temperature
- Designed and developed a DUT protection module with filters, digital logic, and analog
- Designed a current ramping algorithm for VI tests
- Composed detailed documentation of the automated data acquisitions system’s hardware and software: schematics, layouts, revision history, reports, and guides
- Designed the power supply, amplifier, current source, and switch circuits of a 4-wire
0-5 years of experience
- Strategically planned, coordinated and steered electrical installation projects to maximize productivity and quality of major fertilizer plant operations.
- Adhered to strict safety rules and regulations in performing wiring of different types of lights, power plugs and smoke detectors throughout five large buildings.
- Accurately interpreted complex blueprints, installed wiring into steel and PVC conduit, and completed installations of three-phase motors.
- Brought on board as member of major international project in collaboration with a Canadian electrical engineering company, Vilholth & Jensen Associates Ltd.
0-5 years of experience
Responsible for designing and documenting electrical hardware projects related to GPS satellite test systems
- Project lead for developing and testing analog and digital circuits for satellite test applications
- Designed and implemented system AC and DC power distribution.
- Managed internal and external sub-contractors for system design, development, and testing
- Programmed C language software for processing analog signals using microcontrollers and Graphic LCDs
- Successfully delivered and tested the system at customer site
0-5 years of experience
Developed procedures, methods for test and verification
- Designed and created test cases to verify existing and upcoming software
- Validated testing activities and results of C130J equipment
- Participated in design verification of C130J equipment
- Participated in troubleshooting and Route Cause Analysis for defect identification and resolution. Documented and tracked
- Developed project budgets, purchased and monitored expenses. Interacted with vendors regarding procurement and delivery issues
- Reviewed and provided input using AutoCAD to C130J schematic diagrams and related documentation of electrical
- Performed design, installation and testing of C130J electrical components
0-5 years of experience
Experience with high efficiency switch mode power supplies of Buck and Buck-Boost topologies.
- Developed EMC plans and protocols, managed EMC testing and reports.
- Provided proof of concept for microprocessor controlled fly-back charger circuit to reduce analog circuitry.
- Developed software in C to control the fly-back converter and built a working prototype.
- Evaluated prototype performance over temperature and component tolerances.
- Tested prototype for stability and reliability through fault tree analysis, step load test and short circuit test.
- Performed cross-product FPGA analysis for time domain crossings; utilized RTL schematic properties in Synplify Pro.
0-5 years of experience
- Directed 5-person team supporting comprehensive electrical engineering design projects for residential buildings.
- Increased 1st-pass project approvals by 5% in only 5 months by ensuring consistency and eliminating redundancies.
- Supported 5% increase in customer inquiries since joining the organization by building repeat and referral business with reduced permitting timelines.
0-5 years of experience
- Designed and managed a variety of buildings: Schools, Hospitals, Chicago High Rises
- Designed 12.47KV distribution for Northwestern University sporting facilities
- Value engineered projects to provide a code compliant design within budget
- Assisted other engineers with interpretation of building, electrical and energy codes
- Wrote specifications and reviewed shop drawings
10+ years of experience
Test Engineer: Remedied months of stagnation by repairing Specialized Test Equipment
- Developed new test methods working side by side with customer
- Secret level DOD security clearance
- Qualification testing: conducted extreme temperature environmental testing on high level systems hardware
- Conducted systems integration testing on radar system
- Responsible Engineering Authority: Directed two high value projects; high voltage regulator and waveform generator, through design, manufacturing, and acceptance testing
- Increased testing through-put of numerous systems and products including: Antenna Power Conditioning Units, Radar Power Supplies, Beamformer Digital Module, Receiver RF Modules, Radar Jammers, by writing effect test procedures.
- Quality Assurance: Streamlined acceptance test procedures for Front End Optics Using Six Sigma process improvement; and created an internal vibrations lab, reducing test time and overall cost to the program.
- Management: production lab through government inspection as Lab Manager of a level 4 hardware
0-5 years of experience
Power system study in existing facility as well as new design of low voltage and medium voltage electrical distribution system within the standards and codes including but not limited to NEC, NFPA 70E, IEEE.
- Designed and developed Single line diagram and entered related information in SKM
- Consolidated manufacturer submittals and utility information
- Performed short circuit study, protective device coordination, load flow analysis and arc flash hazard analysis
- Provided protective device settings for good phase selectivity and equipment protection including generator, motor and transformer
- Prepared power system study reports and recommended system improvements
- Involved in updating SKM software and libraries
- Updated electrical schematics using AutoCAD for record keeping and power system modeling
- Balanced the demands of customers, field service engineers, salesmen, and management
0-5 years of experience
Supported the Senior Electrical Engineer with analog board front end design work through simulations, prototyping, and bench testing.
- Designed the company’s first multi laser driver PCBA increasing flexibility.
- Assisted with product releases of the following products – LX100, XYP, SD, 100E, 100IS, LH, HTS
- Provided key assistance in obtaining UL and CE marks and CB certificate for LX100, XYP, SD, 100E, 100IS, LH, and HTS products. Worked with IEC 61010-1 for laboratory equipment. Guided UL personnel during factory inspection.
10+ years of experience
Trained Iridium satellite ground station operators to install, maintain and operate equipment.
- Developed and programmed HPVEE special test equipment for production testing of an interface module used on the Iridium satellite module.
- Incorporated JTAG boundary scan technology into the production test process.
- Coordinated the PWB layout of the Iridium satellite Kband modem 16 layer board with high speed digital and RF.
- On-site support for digital simulation results, digital simulation tools, database development in HDL/VHDL.
- Developed digital simulation models and programming standards for the corporate database.
0-5 years of experience
- Lead Electrical Engineer on the MSAM project.
- Lead Electrical Engineer on the newly acquired Flight Termination System.
- Designed a Radio Frequency Controller circuit card for a RF drawer.
- Worked with PMO to provide schedule & material procurement updates.
- Supported various projects by designing test cables, test boxes, writing test procedures and supported environmental testing.
0-5 years of experience
AMSC was a manufacturer of sheet metal machinery – hand and electrical brakes, hydraulic brakes and stamping presses
- Provided technical service, quality testing, integration and installation of various machinery in the fabrication and business sector. The company is currently out of business.
- Conducted technical presentations for new machine installations.
- Designed valves that required hydraulic motion.
- Revamped manual operating machines for automation resulting in an increase in productivity.
- Developed and implementing PLC application programs for various industries.
- Provided cost estimate for new and existing customers.
- Supervised a staff of four field service engineers.
0-5 years of experience
- Inherited ore crusher, conveyor project requiring verification of loads, equipment sizes, temperature derating of cable and equipment for 120 deg F ambient. Designed grounding, lighting and instrument / equipment plans.
- Created PLC I/O and instrument list to reflect P&IDs
- Coordinated with mechanical and structural for location of modular electrical equipment and control rooms
- Developed details of control stations, updated schematics and one lines. Confirmed transformer capacity.
- Reviewed vendor submittals for conformance with project requirements.
- Completed operation manual, load list, and drawings for coal conveying system.
0-5 years of experience
Assisted with layout, design, and monitoring of solar photovoltaic (PV) systems
- Assisted with renewable energy feasibility studies and energy modeling
- Performed site assessments for solar photovoltaic systems
- Created and updated drawings of PV systems and metering components
- Installed inverters and troubleshot solar PV systems
6-10 years of experience
Designed microcontroller circuit board for different drilling fluid sensors
- Designed a Remote Terminal Unit based on a Multicore 32bit ARM processor
- Developed embedded microcontroller system for Dual-Channel Gas Chromatograph
- Designed temperature sensing circuit using TI’s MSC1211
- Developed embedded software to time electric and pneumatic actuators
- Provided technical support to clients around the world resolving [company name]’s mobile lab’s purge systems and single channel gas chromatograph
- Designed Total Hydrocarbon Analyzer (THA) incorporating 32 bit Freescale microprocessor
0-5 years of experience
Electrical Designer responsible for electrical design, completion and administration of contract drawings for all type of facilities. Job description includes preparing contract drawings, construction documents, code analysis, providing technical review of construction documents, and on-site inspections.
- NYS Thruway Authority I-84/I-87 Interchange, the Headquarters for the Facilities Maintenance and Division Bridge Units was LEED certified.
- East Orange Police Headquarters, converted a bank building into the Headquarters for the City of East Orange.
- Health and Safety Projects, provided life safety improvements and MEP upgrades for Newark Public Schools, Orange School District, Passaic Public Schools, and the Paterson Public School systems.
- Newark Public School Student Media Center at 230 Broadway
- Rehabilitation of the Jay-Lawrence Stations and the Construction of the Jay/Lawrence Transfer Connection, designed communication and fire alarm systems.
0-5 years of experience
- Provided construction management, project management, and engineering assistance for mission critical facilities
- Commissioned over ~26MW of critical load for next generation data centers
- Supervised and inspected equipment installation, assembly, and startup
- Acquired excellent training in various MEP design concepts as well as excellent software skills (Revit, CAD, 3DS Max, Visual, MS Office, COMCheck)
0-5 years of experience
- Sole Electrical Engineer for an award winning optical engineering company.
- Lead the design of industry-leading high power LED power supplies.
- Designed new product prototypes and coordinated manufacturing.
- Evaluated and discovered new markets in the LED industry.
6-10 years of experience
- Certified Principal Engineer delegate for over 20 products on a major system.
- Performed design changes, qualification and validation of hardware to engineering and contractual requirements.
- Ensured quality manufacturing and delivery of hardware to an aggressive schedule.
- Performed HW/SW integration of products into the missile system.
- One of the primary data analysts for missile system data.
- Interfaced with hundreds of colleagues and many customers of various disciplines and expertise. Communicated with, supported, and sometimes led a large team spread across the nation.
0-5 years of experience
Power system short circuit study & Arc-Flash analysis from three-phase 345kV to single phase 120V.
- Performed Coordination protection, load flow analysis, voltage drop & motor start calculations
- Relay programming & provided setting points on medium and voltage gear protection
- MEP electrical drawings review & field consulting services
- Design One-line Diagrams, Three Line Diagrams and close & trip diagrams for low and medium voltage applications on over 400 projects
- Short Circuit and Ground Fault Protection, Arc Flash Analysis, One-line diagram modeling, Harmonic Analysis, Motor Starting Analysis
0-5 years of experience
- Oversaw installation and troubleshooting of conveyor systems, control panels, and Programmable Logic Controllers (PLC).
- Devised and outlined maintenance procedures that maximized service life and efficiency of electrical and controls systems/equipment.
- Implemented corrective of actions while meeting safety rules and overcoming time and budget constraints.
- Provided leadership and coordination to various technical personnel engaged in specified project and maintenance activities.
0-5 years of experience
- Responsible for installation, repair, and maintenance of radiology equipment in hospitals and private clinics.
- PLCs software designer and troubleshooting repairs.
- Review scopes of work and estimate quantities and prices for electrical
- Tested electrical systems and continuity of circuits in electrical wiring,
- Developed, implemented and managed safety systems.
- Ensured optimum operation of facility, minimized expenses, and maximized customer satisfaction.