- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Construction Resume Samples
Cement Mason Resume Samples
No results found
10+ years of experience
Highly successful construction plan development and operations management; handle client coordination and contract administration, oversee projects and production. Effectively support by providing hands-on knowledge of several high priority projects for major retailers such as Walmart and Target.
- Managed every aspect of concrete – stamp work, site work, job layout, structural, form setting, etc
- Member of Union cement Mason since 1994 and certified in operating Somero S240 Laser Screed and I am also a ACI Flatwork Finisher and Technician
- Training includes 3D Profiler system, Trowel machines, running pans, polishing, blading and much more
- Excellent sense of mathematical precision and proportion
- Comprehensive knowledge of masonry safety practices
- Excellent expertise in handling and working with masonry equipment and tools
- Skilled at preparing accurate reports of performed work
10+ years of experience
- Prepared, poured and finished industrial floors, curb, curb and gutter, monolithic curb and sidewalk, footings, monolithic slabs, road sections, bridge decks, basement floors, garage floors, driveways and sidewalks.
- Prepared and graded base for metropolitan brick paver sidewalks.
- Measured, cut, placed and finished brick paver sidewalks.
- Utilized common framing tools and equipment to achieve specific form location and grade.
- Reinforced concrete projects using wire mesh, rebar and tie wire.
0-5 years of experience
- Smoothed out concrete in segments to ensure the concrete poured is level.
- Filled roadways, driveways, sidewalks, bridges, homes, and parking lots.
- Arranged the concrete forms.
- Used machines that vibrate concrete to fill air pockets.
- Used groovers and hand trowels to spread concrete
- Lifted heavy objects and tear out old concrete
0-5 years of experience
- Repairs and finishing of the concrete structure to provide a high quality final product
- Assist with tool box talks
- Maintain a safe environment
- Keep site clean and organized
- Prepare flowable fill mix and grout as well as mortar
- Performs other duties as assigned
0-5 years of experience
- Poured slabs for new buildings and parking areas
- Set forms for the slabs
- Removed concrete with jack hammer and sledge hammers
- Operated a Bobcat with the bucket and forks attached
- Worked with hand and power tools such as floats, brooms, edger’s, trowels, sledge hammers and jack hammers.
- Poured concrete molds such as bird baths, planters and statues
0-5 years of experience
- Poured slabs for new buildings and parking areas
- Set forms for the slabs
- Removed concrete with jack hammer and sledge hammers
- Operated a Bobcat with the bucket and forks attached
- Worked with hand and power tools such as floats, brooms, edgers, trowels, sledge hammers and jack hammers.
- Poured concrete molds such as bird baths, planters and statues
- Appointed by my instructors and Safety Foreman
0-5 years of experience
- Poured slabs for new buildings and parking areas
- Set forms for the slabs
- Removed concrete with jack hammer and sledge hammers
- Operated a Bobcat with the bucket and forks attached
- Worked with hand and power tools such as floats, brooms, edger’s, trowels, sledge hammers and jack hammers.
- Poured concrete molds such as bird baths, planters and statues
- Appointed by my instructors and Safety Foreman
0-5 years of experience
- Assist in attaining new contracts, assure appropriate staffing and maintain job budget
- Supervise day to day operations, mix cement, concrete, and mortar
- Operate, inventory, distribute and inspect power tools and machinery
- Inspect and maintain job site under OSHA safety regulations
0-5 years of experience
- Assist in set up and break down of forms.
- Load and unload materials for job site.
- Wearing of prober protective gear (hard hats, steel toe boots, gloves, and safety, glasses).
- Helped with cleanup of job site from sweeping to shoveling.
- Used electric and gas power tools.
0-5 years of experience
- Concrete Grid Layout (form layout) for sidewalks, driveways, curbs, ramps, stairs, benches, retaining walls, foundations for houses and apartments.
- Familiar with a variety of concrete finishes including, but not limited to Burn, broomed, stained andpolished.
- Experiencetying and bending rebar using an electric and/ormanual rebar bender
- Worked with rebar cages plus post/foundation/light holes digging and filling with concrete
0-5 years of experience
Poured as well a laid cement
- Carpentry
- Form removal
- Bull floats
- Monitored available supplies, materials and products for employees
0-5 years of experience
- Set the forms that hold concrete to the desired pitch and depth, and align them. Position construction forms or molds.
- Check the forms that hold the concrete to see that they are properly constructed
- Inspect completed work to ensure proper installation
- Produce rough concrete surface, using broom
- Finish concrete surfaces
- Mold expansion joints and edges, using edging tools, jointers, and straightedge
- Finish concrete surfaces
- Place concrete using concrete pump truck
0-5 years of experience
- Loaded and unloaded baggage.
- Parked/Dispatched aircraft.
- Operated ground equipment.
- Serviced aircraft, including water/lavatory service.
- Cleaned aircraft cabin.
- Aided Aircraft towing and brake riding.
- Performed F.O.D. checks.
- Provided wheelchair service upon passenger request.
- Performed other functions as assigned by the Ramp Supervisor.
0-5 years of experience
- Remove concrete that is being replaced.
- Perform excavation to assist in the process of concrete removal.
- Pour and finish concrete.
- Clean up on job site.
0-5 years of experience
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface
- Check the forms that hold the concrete to see that they are properly constructed
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine
- Mold expansion joints and edges, using edging tools, jointers, and straightedge
0-5 years of experience
- Mix cement
- Show skill and use of all tools including (drills,scrapers,chisels).
- Gather all materiais for workers.
- Clean work area while working and when work is finished.
- Teach skills needed for job to new employees
0-5 years of experience
- Measured and aligned forms for sidewalks
- Finished and smoothed surfaces of poured concrete
- Patching on unleveled cement floors
- Used tools such as saws to make cuts on finished concrete
0-5 years of experience
- Assist with the construction of retaining walls / parking structure.
- Manual labor
- Coordinate the oncoming traffic for cement trucks
- Ensure the safety of pedestrians near job site.
0-5 years of experience
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface
- Check the forms that hold the concrete to see that they are properly constructed
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine
- Operate pallet jack, push truck, flat cart and dollies
- Monitor oil and gas levels of generators and other gas powered tools
0-5 years of experience
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface
- Check the forms that hold the concrete to see that they are properly constructed
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine
- Mold expansion joints and edges, using edging tools, jointers, and straightedge
0-5 years of experience
- Pre-Apprenticeship specializing in concrete metal forms and wood forming, joint, concrete finishing.
- Experience with a skid-steer and loader
- Study the layout and prepare surfaces before working
- Analyze the width and length of area and design a plan for construction
- Operated angle grinders, wet saws, drillers, gas mixers, drill mixers, electric table saws and other
- Cut bricks and stones in various sizes for use
- Select and mix cement and mortar in adequate proportion depending on the application of masonry
- Use trowels of different shapes and sizes to level and clear away excess concrete
0-5 years of experience
- I would assist in setting forms for pouring concrete. I would ensure that the cement was up to standards such as the slope and percentages were meet and that the heights would work to the plans and preexisting cement if the job called for it.
- I would then grade the area where the forms would sit, making sure that it was compacted to code; using either a vibrator, tamper, or roller. Making sure to meet requirements as to not use to mush material.
- I would help pour the cement, laying it out, working and finishing it. Making sure to provide a high quality job or what was required. Cleaning up up and making sure all the tools and that our working area was left clean and professional looking.
- Driving home equipment or and workers to shop.
0-5 years of experience
- Construct concrete curbs, gutters, steps, sidewalks, driveways, and patios.
- Dig footings and grade and prepare areas for concrete.
- Clean, cut, break, remove, and repair broken concrete.
- Finish concrete structures and facilities using trowels, floats, straight edges, joiners, and screeds to obtain required texture and contour.
- Construct and set forms.
- Order supplies and materials.
- Maintain time and materials records.
- Set and brick in incinerators.
- Operate a gunite nozzle.
- Perform related duties as assigned.
0-5 years of experience
- Built forms for driveways, sidewalks, curbs and ramps
- Worked with hot saws and soft cut saws
- Cut, placed, and tied rebar
- Removed slabs for re-pouring foundations
- Poured sidewalks, benches, table tops, paint shop, and curbs
- Patched walls and sidewalks
- Finished slabs with hand tools including trowels, magnesium float, bull float, edger and finishing broom
- Applied smooth trowel and broom finishes
- Maintained work areas in clean, orderly condition
0-5 years of experience
- Built forms for driveways, sidewalks, curbs and ramps
- Worked with hot saws and soft cut saws
- Cut, placed, and tied rebar
- Removed slabs for re-pouring foundations
- Poured sidewalks, benches, table tops, paint shop, and curbs
- Patched walls and sidewalks
- Finished slabs with hand tools including trowels, magnesium float, bull float, fresno, edger and finishing broom
- Applied smooth trowel and broom finishes
- Maintained work areas in clean, orderly condition
0-5 years of experience
- Smooth and finish surfaces of poured concrete, such as sidewalks, driveways, roads and curbs
- Set forms to prepare for pour
- Cut joints and demolish concrete
0-5 years of experience
- Set forms that hold concrete
- Perform hand mixing to produce concrete including aggregate, water, and cement mix
- Rake, rod, and finish using floats, trowels, edgers, and walking finishing tools
- Use of jack hammers and other demolition tools
- Efficient in using power tools such as Skill-Saw, Sawzall, Grinder, and Concrete Saw
- Produce rough concrete surface using finishing broom
- Stain and stamped concrete
- Patch and mixed patch material