- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Plumbing Resume Samples
Piping Engineer Resume Samples
No results found
0-5 years of experience
Managed pipe stress activities on multiple projects, responsible for development of 5 technical specialists, managed pipe specifications, consulted with clients on special piping studies.
- Prevented rework of main steam line by showing vibration to be within allowable guidelines.
- Successfully fought warranty claim by decisively proving a third party’s inadequate design was the root cause.
- Initiated internal training program for piping engineers.
- Reduced piping model input time by 90% through importing design model to engineering model.
- Saved $30,000 overhead per year by modernizing department’s labor forecasting method.
- Increased engineering capabilities by adapting nuclear piping code welded attachment calculation for use by group on non-nuclear projects.
0-5 years of experience
Evaluated and amended piping/instrumentation diagrams and process flow diagrams on AutoCAD and AutoPlant
- Managed an Access and EASY database which tracked the piping and instrumentation for various clients
- Collaborated with multiple engineering disciplines to rout piping on projects using PDS, Microstation, and AutoPlant 3D Design
- Verified the structural integrity of routed pipe using Caesar II
- Participated in field operations that gathered plant information and designated piping and equipment that was to be replaced (Puerto Rico)
- Participated in field operations that assessed the best route for HP and LP hot water lines to be piped so that sufficient hot water needs were met (Arkansas)
10+ years of experience
Provided mechanical engineering project support for the design and construction of two major nuclear power plants in the area of piping, equipment design and analysis.
- Formulated many piping, valve and equipment specifications for PSNH’s Seabrook Station
- Supervised and managed a group of thirty engineers and designers engaged in piping and support design for WPPSS Projects 1 & 2. This consisted of managing the drawing room, production, manpower and coordination among the various disciplines.
- Functioned as a Stress Analyst with the modeling and analysis of nuclear piping systems for thermal, weight, and seismic conditions for the WPPSS Project.
- Prepared safety evaluations and subsections for the Final Safety Analysis Report for the WPPSS Project.
- Developed many “cookbook” type procedures used in simplifying the installation of piping and instrumentation systems. This encompassed an envelope design for field run small bore piping and instrument tubing. This resulted in substantial savings in engineering and installation costs for the WPPSS Project.
- As a Design Engineer, provided the design and drafting of piping and equipment systems, producing Piping Isometrics, P&ID’s and Arrangement drawings.
0-5 years of experience
Prepared P&ID, piping/valve specs. on all systems for a combined cycle power plant.
- Performed pipe stresses and piping flexibility for high energy piping per ANSI 31.1
- Performed pipe minimum wall thickness calculation per ANSI B31.1.
- Reviewed and recommend bid package evaluations on valves and pipes.
- Supervised and directed Micro-Sta./PDS drafters generates piping drawings.
- Checking of piping and vendor drawings in accordance with the specs. and codes.
- Support construction by field orders and generated DCR for field revision on piping.
0-5 years of experience
Performed as Area Lead Engineer and Quality Checker for project deliverables such as: isometric drawings, 3D models, piping layout, and other engineering documents, for compliance to project specifications and standards.
- Performed as Lead Engineer for Heat Exchanger Integration (Feed) for Shell Philippines Petroleum Corporation.
- Developed conceptual routing, piping layout and piping information of major critical equipment of the project such as towers/columns, heaters, compressors and reactors, in 3D CAD format.
- Planned, organized and executed piping engineering activities and manpower requirements.
- Coordinated with other project area lead engineers and disciplines to ensure piping systems, layout & equipment spacing requirements were within project codes and standards.
- Mentored junior piping engineers and designers.
0-5 years of experience
Created, analyzed, and modified pipe support designs for the expansion of a Valero oil refinery in Louisiana and ensured compliancy with codes, government regulations, and client requirements.
- Completed the full stress analysis of over 20 main systems within a period of four months.
- Performed pipe stress analysis on cooling systems, equipment, vessels, heat exchangers, and compressors.
- Wrote technical guideline standards to review/access vendor specifications.
- Reviewed vendor technical data/requisition forms to make purchase recommendations.
- Prepared data sheets, bid tabs and purchase order sheet
- Lead design reviews and answered RFI’s
- Developed piping specifications and supports
0-5 years of experience
Project Management/ Lead
- Led a team of 2 engineers and designers for study modification projects worth more than $1 million for Statoil.
- Coordinated with Statoil personnel, and process & electrical disciplines to eliminate old piping on existing offshore platforms and select suitable design and materials for the new piping installations.
- Developed prefabrication & installation packages for modification projects providing materials details and installation instructions at offshore platforms sites.
- Evaluated new software to allow for the coordination of entire engineering processes, and creating a central database to ease access and eliminate the waste.
0-5 years of experience
Supervised and trained group 7+ engineers.
- Provided the field with engineering support.
- Issued work plans, managed subcontractors, analyzed operations and budget.
- Updated construction schedule, created productivity reports.
- Purchased, tracked and inspected material deliveries.
- Created RFI’s and estimated man-hours for field change orders.
0-5 years of experience
Drove engineering success by handling Construction Technical Queries (CTQ) for piping department across new and / or existing LNG plant complex, including maintaining valuable communications with field and home office project team members while generating design specs and overseeing implementation of gas piping processes.
- Provide support for piping design, installation and testing of pressure piping systems.
- Created comprehensive construction specs; prepared project plans; and estimated schedules, cost, and reports.
- Delivered resourceful technical support to Piping Superintendent and ensured construction work complied with all engineering standards, codes, specs, and design instruction while continually communicating with clientele.
- Cultivated a progressive work environment by actively participating in project meetings within the field, as well as participating in constructability project reviews on an ongoing basis during the design process.
0-5 years of experience
- Prepared design based standard drawings with required specifications with highest quality.
- Extracted piping isometrics and prepared general arrangement drawings.
- Performed piping studies and prepared single line structure drawings with piping load data.
- Designed all sort of pipe ways and pipe supports and conducted stress analysis on piping systems.
- Updated 3D models of piping, equipment and structural using Bently-Autoplant-3D.
- Audit and remediation, customizing, specifications as per standards using Auto plant Spec generator.
0-5 years of experience
Design and engineering output checking and also reviewing the technical results of the project teams.
- Checking project scope of work and required input data for all engineering activities.
- Consulting and negotiating with client to prepare job specifications and present engineering drawings and documents.
- Coordinating among Engineering, Procurement and Construction departments.
- Participating in concept of design and engineering works and facilitating the critical technical issues.
- Supervised technicians and other engineers and also reviewed designed drawings and calculation documents.
- Supervised and inspected the installation and modifications of mechanical systems at construction sites.
0-5 years of experience
- Prepared and developed Piping and Instrumentation Diagrams for Liquefied Natural Gas system
- Created 3-D models to simulate process and depict relationship of components, using CADWorx
- Calculated efficiency of hardware like compressor and heat exchanger to improve design process
- Performed piping selection research and optimized pipe network to improve distribution system
- Generated isometric drawings with CAD group and reported to project manager, using ISOGEN
0-5 years of experience
- Prepared P&ID, piping/valve specs. on all systems for a combined cycle power plant.
- Performed pipe stresses and piping flexibility for high energy piping per ANSI 31.1
- Performed pipe minimum wall thickness calculation per ANSI B31.1.
- Reviewed and recommend bid package evaluations on valves and pipes.
- Supervised and directed Micro-Sta./PDS drafters generates piping drawings.
- Checking of piping and vendor drawings in accordance with the specs. and codes.
- Support construction by field orders and generated DCR for field revision on piping.
0-5 years of experience
- Designed/ modelled piping, piping supports, equipment and plant layout for new and existing plants.
- Developed piping isometrics and General Arrangement drawings manually and using computer design programs such as AutoCAD, Microstation, PDS, and OrthoGen.
- Solved piping/equipment clash reports using PDS.
- Created Tie-ins details using existing drawings and field verification.
- Prepared and Reviewed Material Take off (MTO).
- Provided field technical support, by specification interpretations and design modifications.
- Participated in Semman gas extraction platform, Al-Khafgy gas extraction platforms and Khursaniyah gas plant.
0-5 years of experience
- Developed various valves/piping specifications and coordinated project piping related activities
- Established field weld location criteria to increase efficiencies and provide adequate clearance for erections
- Designed and evaluated carbon dioxide and compressed air systems
0-5 years of experience
- Estimated piping layout and generated material & installation quotations for customers.
- Assisted in the drafting and designing of cryogenic piping systems.
- Supported the recording and construction of BOMs and sales orders.
- Checked and assisted in the approval of fabrication drawings.
- Calculated and constructed written analyses on flexibility and anticipated cryogenic piping operating
0-5 years of experience
Analyzed piping system of Offshore Supply Vessels to ensure that they meet standards set by American Bureau of Shipping (ABS), ASME, US Coast Guard, MARPOL, and SOLAS
- Calculated mechanical design such as heating, ventilation, air conditioning, plumbing, oil piping, drilling-fluid piping, etc.
- Modified piping system drawings based on Pipe-Flow computer software calculations
- Selected and prepared purchase orders of pumps, pipes, fittings, valves and pneumatic actuators for OSVs
0-5 years of experience
Generated Plot Plan as well as Key Plan
- Designed oil and gas (heavy industrial) piping system using PDMS software
- Reviewed and commented on issued process and instrument documents, based on piping requirements
- Generated Solid parts using Solidworks
- South Pars Gas Field Development Project (Phases 15 & 16)
0-5 years of experience
Direct supervision of a staff of up to 12 professionals in the production of engineering deliverables and services for client projects primarily in the Fossil Power market.
- Responsible for all aspects of mechanical project execution including Equipment Specification and Layout, Piping Engineering and Layout, HVAC, Plumbing, Fire Protection and Material Handling.
- Supported numerous Power Plant projects (SCR, FGD, Ammonia Storage, etc) as a subcontractor for Babcock and Wilcox.
- Performed specialized Main Steam Header Piping Analysis for B&W projects.
- Project Manager on small projects in the Industrial Sector.
- Performed direct marketing and marketing support in effort to generate new business. Was successful in establishing new clients and generation new business from past clients.
0-5 years of experience
Assigned to the Jamalco Expansion Project H330300, responsible for the hydraulics for area 7 ( lime ) and area 9 (oxalate). This involves manual as well as software assisted (AFT Fathom) calculations to size pumps and line sizes for various processes.
- Involved in quantitative material verification for pipes and accessories such as gaskets, valves, bolts, elbows, tees etc. for all areas of EWP ( Early Works section of the Jamalco Project) using Bently Data Manager Software. These quantities are then used by Procurement for purchasing.
- Perfomed stress analysis using Caesar software on highly stressed piping areas.
- Responsible for the piping estimate for an expansion of a Nickel Plant in Guatemala (Fenix / Skye Project). Supervised 6 piping designers and chaired weekly progress meetings. Calculated required pipe wall thicknesses and pipe diameters for the various services.
- Piping Engineer for all inter and intra connecting pipes for a Nickel Furnace in South Korea. (SNNC Project). Supervised designers lay out of flex hoses and monel pipes for the metal as well as the slag tap hole areas.
0-5 years of experience
Performed pressure drop analysis for piping arrangements for few fluid systems.
- Designed and analyzed valves based on pressure drop.
- Performed a pipe sizing calculations based on the system operating pressure and temperature.
- Expertise in pipe material selection based on the system application.
- Determined the hydrostatic pressure testing of pipe based on the system operating pressure.
- Performed torque calculations to connect flanges via bolts.
0-5 years of experience
Responsible for areas were acid gas removal, caustic scrubber, tail gas, sulfur plant, flare piping and flare stack construction.
- Coordinate field construction efforts with client and project engineers.
- Performed routine inspections and material take-offs.
- Initiated design change notices and 3D design sketches to assist the craftsmen.
- Provide underground piping feasibility studies and generate punch list.
0-5 years of experience
Prepare stress calculations in support of various oil and gas projects using Caesar II, AutoPipe, Smart Plant Review, Navisworks, and NozzlePro.
- Qualify nozzle loads on towers, vessels, heat exchangers, pumps and other specialized equipment using all applicable codes.
- Evaluate and document the plant piping layout, stresses, displacements, equipment nozzle loads for compliance with ASME Codes B31.3 and other related Codes.
- Resolve complex pipe stress and support load issues
- Review and verify the work of other engineers
- Locate and select appropriate pipe support types and hangers
6-10 years of experience
Foroozan offshore Project – Expansion of existing oil platforms to add new living quarter and production facility.
- Supervised a team of engineers, project planners and admin staff.
- Worked on FEED & Detail piping documents for this brown-field project.
- Reviewed and finalized piping specifications, layouts and 3D model review.
- Assisted in selection, review and approval of sub-contractors.
- Participated in numerous technical meetings with EPC contractor, client, and engineering consultant regarding basic and detailed documents, model reviews and safety standards.
- Reviewed tie-in documents between new and existing platforms.
- Performed technical review of P&ID documents.
- Supervised production and manufacturing of pipeline and fittings.
- Performed technical reviews of basic and detail pipeline design documents.
- Provided technical supervision during construction of flow lines and production units.
0-5 years of experience
Perform pipe stress analysis utilizing CAESAR II software in nuclear and other non-nuclear power piping in accordance with ASME B31.1 and B31.3 respectively.
- Assess pipe support loads in order to qualify the piping system.
- Analyze equipment loads, such as pumps, in accordance with standards such as API 610.
- Perform hand piping calculations as necessary, such as pipe flow calculation and pipe thickness calculations.
- Perform site walkdown as necessary for field support as well as gathering data and information to perform the design work.
- Maintain project requirements and milestones, and provide support for technical, design, budget, and schedule of projects.
- Interface with client’s stakeholders and management to ensure effective project execution.
0-5 years of experience
General refinery piping work, especially overpressure protection and safety engineering. Responsible for both design and drafting of these systems.
- Extensive on-site and field work, including field studies and a continuous five month presence at customer’s facility
- Frequent quick turn-around projects
- Piping and Instrumentation Diagram (P&ID) and Process Flow Diagram (PFD) creation and modification
- CAD standard creation and implementation
0-5 years of experience
- Over one year of professional experience as a stress and materials engineer working for various clients and projects while receiving positive recognition from coworkers and supervisors.
- Duties include modeling new and existing equipment and piping systems in Caesar II and performing stress analysis on the system under various Loading Conditions. Furthermore, to ensure safe and reliable operation of equipment given the loads applied on such equipment by the piping system as determined through the computer model or hand calculations. Other duties include: creating support and equipment drawings in AutoCAD, working with Piping and Instrumentation diagrams, developing line lists from the provided process conditions and Piping and Instrumentation diagrams, going to the field to obtain missing information and sketching existing piping configurations, develop support data sheets, provide loads to civil/structural amongst many other tasks.
- Two months field experience at the Shell Oil Products refinery in Martinez, CA. working directly on site with the department manager to fulfill the client’s needs.
0-5 years of experience
- Responsible for providing Piping Engineering input for all Piping Line Lists and issuing final documents. Created MS Excel program in order to automatically populate all Piping Engineering data based on corresponding Process Engineering conditions, piping specifications, standards, etc.
- Assisted Sr. Piping Engineers with pipe stress analysis, material takeoff, and SP item datasheets. Key contributions involved using PDMS Pipe Stress Interface to create Caesar II Pipe Stress models directly from PDMS model, modeling segments of multi-kilometer pipeline in Caesar II using cross sectional and topographical planar views, and tracking stress isometrics between Piping Design, Piping Engineering, and Structural departments.
- Provided Field Engineering support for client turnaround activities. Major responsibilities included creating construction work packages, tracking and verifying receipt of materials, and serving as technical representative during critical on-site activities.
- Given responsibility of Lead Piping Engineer reporting to Piping Engineering Manager for a section of a project. Participated in Interactive Planning Session with all other disciplines to effectively plan future project work.
- Used AutoCAD and SmartPlant P&ID for the purpose of assisting P&ID designers with P&ID creation and revision, and modifying pipe support standards.
0-5 years of experience
- Hired as a Piping Engineer assigned in Pre-fabrication Shop, and 6 months later transferred to project job site J-64. Handling almost all the Piping – Erection, and promoted to Site Supt. (night shift) – Mechanical works. Supervised a work force of no less than 50 to 90 men composed of : 3 Engineers (Mechanical, Civil, & Electrical ), 6 to 8 Foremen – piping / welding / equipment / electrical / civil / & scaffolding and all kinds of trade skilled workers / labors as indirect & direct manpower required.
- Checked / reviewed the construction drawings of various job assignments, materials specs, scope & volume of works to be done. Set a goal of daily production & weekly programs with reference to target data schedule of completion, especially to priorities & critical job assignment.
- Prepared & follow – up the weekly advance manpower, materials availability, tools & equipment requirements for various field activities of my staff respective job assignment.
- Conduct a daily site inspection routine if possible to check personally the progress & to facilitate immediate action regarding various problems encountered in the job site.
0-5 years of experience
Preparing piping drawing for fabrication.
- Updated and maintained drawings.
- Prepared flow diagrams (P&ID’s) for electrical wiring and piping.
- 3D models using CADWorx program.
- Details of machined parts.
- Selection of component parts and materials to be used in all drawing types.
- Creating parts lists for procurement.
- Most of the drawings were for a chemical plant in Long Beach for oil and gas.
0-5 years of experience
- Drove industrial forklift to transport materials between loading, unloading, processing, and storage areas
- Alley docking trailers full of materials or products successfully
- Performed routine pre and post inspections on forklift and maintained the machine, equipment, and electrical components.
- Manually loading and unloading materials onto or off pallets, skids, platforms or lifting devices
0-5 years of experience
Sulfur Blocks of Refineries including Sulfur Recovery, Sour Water Stripping, Tall Gas Treatment, and Amine Recovery Units.
- Piping engineer in an EPC team environment for client contracts including: Conoco Phillips, GS Caltex, Reficar, Flint Hills, Marathon Ashland Petroleum, Hyundai Oilbank.
- Model stress systems in CAESAR II, piping code knowledge
- Specified and requisitioned piping components including pipe, fittings, valves, mixers, sample systems, etc.
- Specified and prepared ControTrace, steam trace, and insulation subcontracts.
- Requisitioned proprietary items.
0-5 years of experience
Responsible for detailed piping design and design of equipment and pipeline on the following projects.
- Parachute creek Gas plant, gas custody transfer metering station design & construction.
- Meeker lateral Extension & NGL custody transfer metering station design & construction.
- Twin Basin Pipeline and Compression Gathering Systems (TransColorado-Utah)
- Ryan Gulch Interconnect phase I & II
- Williams Highland Gas Gathering systems.
0-5 years of experience
Guide the team in developing the piping design, plot plans, general arrangement plans, pipe support drawing & other relevant documents, & isometrics consistent with job specifications codes, economics, and safety, maintenance and constructability requirements.
- Interface with the equipment engineers establishing preliminary equipment data requirements and outlines. Review seller’s drawings; where necessary, review “in-house” drawings develop by other design groups.
- Interface with other discipline / Design Engineers to gather pertinent data for the project.
- As a Piping Engineer
- Responsible for the design, review and checking of the module plot plan and piping layout / arrangement done by subcontractor.
- Assist team of piping designers in piping layout & 3d modeling.
- Responsible for the piping deliverables to be issued on time.
- Responsible for checking review and provide solutions to piping design.
- Prepare Design comments, report, weekly task schedule and monitor P.O. issuance.
0-5 years of experience
- Routed 300+ miles of pipe on AUTOCAD with multiple draftsmen.
- Assisted senior engineer in all calculation including angles for directional drilling, pipe stress, hydro pressure test, and centrifugal pump sizing.
- Assisted project manager with proposals for clients.
- Knowledge of ASME, API and Federal Regulation codes.
- Consulted with various vendors about application and uses of products.
6-10 years of experience
Perform piping flexibility calculations per ASME B31.3 / B31.8 and recommend optimal pipe routing
- Analyze scrubber and pulsation bottle nozzles per ASME BPVC Section 8, Div. 2
- Perform dynamic (modal) analyses on reciprocating compressor piping and support structures per API 618
- Perform force response analysis as required per API 618 for significant acoustical shaking forces
- Coordinate with designers and QC pipe support location and detail drawings
- Develop new methods of computer modeling for more accurate stress/dynamic results
- Communicate with customers directly to obtain project information and coordinate deliverable deadlines
- Analyze acoustic systems; calculate pressure drop, pulsations, and shaking forces per API 618
- Provide pulsation bottle recommendations (diameter, length, orifice plates, internal heads & choke tubes)
6-10 years of experience
- Performed stress analysis and stress reports of piping systems under loadings of deadweight, thermal expansion, seismic (spectrum), and fluid transient (time history), for Westinghouse AP1000 Domestic Design Finalization Project by utilizing PipeStress computer software.
- Performed piping support design and prepared calculation reports for Westinghouse AP1000 Domestic Design Finalization Project, using GTStrudl, SmartPlant, Lisega’s LICAD, NozzlePRO, Mathcad templates computer programs.
- Designed the embedded plate and overlapped plate of piping supports for AP1000 Domestic Design Finalization Project (DDF).
- Performed E&DCR, DCP, & CAR reconciliation for Vogtle & V C Summer Nuclear Power Construction Projects.
0-5 years of experience
- Qarn Alam Steam Injection Project for Petroleum Development Oman.
- Headed five (5) senior piping designers and eight (8) junior piping designers specialized in piping flexibility analysis, piping and equipment layout design using Steam Assisted Gravity Drainage (SAGD) technology for high pressure steam distribution system of 150 steam injection wells.
- Supervised piping installation and hydrotest activities for piping systems of instrument air, reverse osmosis, multi- media filters and feed pump facilities in collaboration with pre-commissioning team.
- Ensured that the piping route and equipment layout allow for economical connections both to minimize the length of piping and to facilitate its supporting.
0-5 years of experience
- Worked with industrial customers in steel and aluminum industries in definition of program scope, preparation and monitoring of program budgets and schedules, coordination of engineering and drafting staff, and preparation of business development proposals.
- Supervised successful on-site installation of Patterson and customer designed production equipment and processes coordinating client staff and sub-contract resources as required.
- Completed mechanical design and analysis of piping, hydraulic, mechanical and electrical systems.
0-5 years of experience
Review all relevant procedure, specification and maintaining the standard of safety & quality defined in the company procedures.
- Work with vendors, yard personel, engineering to resolve any fabrication problems so project milestone can be achieve
- To ensure the yard is supplied with the correct material & drawing for fabrication & installation work to meet schedule requirements.
- Monitor daily and weekly progress and productivity correctly and accurate
- Monitor and clear all the piping punchlist
- Closing out all raised Site Query and develop As-built drawings if required.
- To meet and complete Boroscope cleanliness inspection as per sub-system priority requirements.
- Supervise and coordinate preservation team to arrange for the supply and fitting of suitable plastic caps to be installed after bolt tensioning for stud bolts 1″ and above, the cap ends must cover the nut and exposed thread and be filled with suitable grease. (estimated 10700 bolts will be capped).
- Supervise and coordinate pickling and passivation team to do external cleaning all piping system
- Closing out all Piping Preservation Punch List.
- Supervise and coordinate CESCO Sub Contractor to do Boroscope Video Check for Offshore Hook Up Tie In Cut Spools, to prevent and make sure all pipe lines free from debris (refer on Cleanliness Matrix Standard) after cold cutting offshore hook up spool, before hand over to Hook Up Commissioning Team.
0-5 years of experience
- Perform static, thermal, and dynamic analysis of process piping in accordance with various industry codes
- Ensure piping system is adequately supported to reduce vibration levels
- Check nozzle loads to conform to applicable code
- Create technical reports
- Communicate with multiple disciplines and clients to ensure proper design
0-5 years of experience
Senior Field Engineer responsible for developing and walking down Piping Test packages
- Approving piping systems for testing
- Witnessing hydro test process
- Witnessing flushing process
- QA/QC walk downs on piping work packages
- Develop Punch list on Field Work Packages
0-5 years of experience
- Planning and prepare schedule for maintenance and repair Static Equipments (Heat Exchanger, Steam Traps, Boiler, Reactor, Furnace, Distilling Columns and Piping Systems with its Associated Appurtenances).
- Site coordination, supervision work and manpower arrangement to ensure production activities and operation are execute in the highest work quality and within schedule.
- Technical and problem solving for maintenance and repair Static Equipments.
- Monitor and ensure day to day that fabrication pipe spools accordance with correct materials, specification and Welding Procedure Specifications (WPS).
- Prepare as built piping isometric drawing.
- Prepare and reported the daily report to Mechanical Manager and Client.
0-5 years of experience
Oversaw multiple crews and was responsible for the coordination between contractors and plant supervisors and reported in weekly meetings on our progress.
- Traveled to multiple plants, learning how to work efficiently in different plant environments.
- Skilled reader of blueprints and user of SolidWorks and AutoCAD.
- Became familiar with OSHA standards as well as pressure vessel codes and laws.
0-5 years of experience
Responsible for modeling of piping layouts (PDMS/PDS 3D), preparing of GA and Isometrics and Checking of pipe and valve specification, Calculations for hot tap, chain wheel operator, pipe wall thickness, test pressure, pipe bend, steam tracing to meet all pertinent industry code compliance.
- In charge for Preparation of Bill of Quantity/Material Take off for the Projects.
- Review and checking process of different Pipe specifications like CS, SS, Duplex SS, Chrome Alloy, Nickel Alloy for different applications like Low Temperature, Cryogenic, Sour and other Aggressive Services like Hydrogen and Oxygen, Jacketed line, Tubing applications etc.
- Acquired good knowledge and understanding of ASME B 31.1/B31.3/B31.8, FEED, PIP, API, MSS-SP and other industry standards and continuously gaining knowledge through reading day to day functional applications.
0-5 years of experience
Prepared site visit check list and report.
- Interpreted 3D scanned Erha North FPSO facilities using QUANTAPOINT software.
- Generation of Piping 3D MODEL using PDMS.
- Prepared Piping Design Basis, Pipe Support Detail design, Pipe Tie-in list, Critical Line List.
- Prepared and checked piping general arrangement drawing, Equipment layout drawing.
- Prepared Material Handling Philosophy, Material Requisition for Pipe, Specialty Items and Fittings.
- Preparation of Piping Material Class (PMC), Piping Stress Philosophy.
- Extraction and Checking of Isometrics drawings in conformation with MTOs
- Preparation of Pipe Supports Standards.
- Drafting / Generation of Piping General Arrangement, Section / Elevation Drawings.
0-5 years of experience
- Design pipe supports involving steel sizes, load direction, and support type
- Create piping drawings
- Field verify and specify support type and installation
- Perform large scale pipe routing and equipment layout design
- Generate and annotate orthographic drawings
0-5 years of experience
- Field design/layout of new piping systems (process, plumbing, fire protection and utilities)
- Field layout of equipment (new/existing)
- Field demolition of existing process piping
- Bill of material lists
- Check and review all drawings (PFD, P&ID, Plan, Isometric’s, etc.)
- Construction documents
6-10 years of experience
- Utilize sketches, dimensions and plans to create AutoCAD drawings of products
- Create new sketches including details of pipe material and fittings
- Selected by supervisor to train new employees
Piping Engineer Duties and Responsibilities
There are several duties that fall under the responsibility of Piping Engineers. The specific duties vary slightly depending upon industry. With that being said, the following duties are the ones that popped up most frequently in our analysis of Piping Engineer job descriptions.
Survey Installation Sites Piping Engineers are responsible for going to the installation site of a piping system and surveying the land for any irregularities. They then analyze these observations as a part of the process for creating system blueprints.
Draw Blueprints for Piping Systems Piping Engineers are the creators of a system’s blueprints. This requires extensive knowledge of all the parts of the system , and how each part relates to the functionality of the whole. Piping Engineers typically use Computer Assisted Design ( CAD ) software for this process.
Develop Preliminary Project Scope Piping Engineers are responsible for creating the initial project scope for all of the tasks that need to be completed in order to install a piping system. They must take into account cost , resources and the project deadline.
Participate in Cost Management Meetings Most of what Piping Engineers do depends on the budget of a given project. They participate with decision makers in cost management meetings to ensure their designs reflect the parameters of the project’s budget.
Assist in Sourcing Construction Materials for Piping Systems
Piping Engineers know exactly what types of materials are necessary to create a piping system that withstands the elements. They’re responsible for sourcing these materials, and then ensuring these materials are used in the installation process.
Piping Engineer Skills
Piping Engineers rely mostly on technical skills to complete their duties, but there are still a few soft skills they need to do their jobs well. Piping Engineers rarely work alone, so they have to be able to thrive in a collaborative environment. They also need to have keen observational skills in order to successfully survey installation sites. We analyzed several Piping Engineer job descriptions to put together this list of core skills Piping Engineers need to get hired. Observational Skills: Piping Engineers call upon their observational skills when surveying installation sites. They must be able to detect any irregularities that may affect the installation process. Analytical Skills: Piping Engineers use their analytical skills to analyze their observations to design a piping system that will withstand the elements of the installation site. Project Management Skills: Piping Engineers have to wear the hat of a Project Manager when developing the scope of a project. It involves the ability to plan a project start to finish, taking into account time , cost , and resources. Written and Verbal Communication Skills: Piping Engineers work in a collaborative environment. They have to be able to communicate their plans to non-Engineer decision makers, and must also be able to communicate their plans to their team. Drafting Skills: Piping Engineers call upon their drafting skills to physically create the blueprints for piping systems. This involves proficiency with CAD software, as well as expertise in the components of piping blueprints.
Piping Engineer Education Requirements
The role of Piping Engineer is one that involves a highly specialized set of skills. This is why virtually all employers want candidates who have a Bachelor’s degree in Engineering. Piping Engineers typically have degrees in Civil Engineering , but those with Mechanical Engineering degrees could also find employment. It typically takes aspiring Piping Engineers four years to finish their degree program. An education in Civil Engineering focuses on Sciences such as geology, chemistry and physics. It also focuses on Mathematics such as geometry , trigonometry and calculus. They also take classes on the basic principles of Civil Engineering and how to apply these principles in the real world.
Piping Engineer Salary
According to online sources, the national average salary for Piping Engineers is $79,959. Those at the bottom of the scale make $62,000, while those at the top of the scale make $125,000.
Piping Engineer Resources
Are you interested in further exploring the professional life of a Piping Engineer? If so , then check out our list of resources.
American Society of Civil Engineers – The ASCE was founded way back in 1852 , which makes it the oldest professional organization for Civil Engineers. Since then, it has grown to over 155,000 members in 177 countries. Thousands of these members are Piping Engineers. Their website is regularly updated with industry information, and also has a great list of books related to Civil Engineering.
National Society of Professional Engineers – This organization is an umbrella organization for state and local professional organizations that cater to Engineers of all disciplines. This is a great way to find organizations in your area that can connect you with local Piping Engineers.
Civilblog.org – This blog is regularly updated with articles on a wide spectrum of topics related to Civil Engineering. While all topics may not be relatable to Piping Engineers, it is still a good resource for industry trends.
Siswebs.org – Although this blog hasn’t been updated in a while, it is content specifically about the design and installation of water systems. The archived content is worth a look for aspiring Piping Engineers.