- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Engineering Resume Samples
Engineering Technician Resume Samples
No results found
0-5 years of experience
[company name] was contracted by the US Air Force to provide an increase in engineering capabilities to Joint Base San Antonio. As an Engineering Technician, I managed multiple engineering projects consisting of planning and programming, CAD drafting, and project management in support of $2B of construction at Fort Sam Houston.
- Lead CAD Draftsman for multiple design project; completed 50 drawings depicting construction requirements
- Expediently programmed over 2K future design/construction projects into ACES during transition to Air Force tracking system
- Designed cost efficient arrangement of mechanical infrastructure and minimized construction time for Main Chiller Renovation
- Managed engineering projects; generated and maintained design drawings, statements of work, specifications, and cost estimates
0-5 years of experience
As a Work Control Group Engineering Technician, I ensure adequate system isolation, authorization and control of Intermediate Maintenance Facility (IMF) maintenance conducted onboard Trident Submarines at the Bangor Submarine base.
- Hand selected to be USS Pennsylvania boat lead, normally held by civilian GS-11 employees, for emergent dry docking availability.
- Maintained qualification and examination program for over 50 personnel, both military and civilian, covering 5 different shops.
- Insured the safe completion of over 30 maintenance availabilities, both waterborne and in dry dock, on 7 different Trident Submarines.
- Provided training to ships force personnel on JFMM (Joint Fleet Maintenance Manual), TUM (Tagout User’s Manual), and multiple different ships technical manuals to ensure the safety of all personnel performing maintenance.
0-5 years of experience
Enforced the Quality Assurance program ensuring the proper personal protective equipment was being worn and utilized and making sure the proper documentation were being used for every job
- Supervised and managed several groups of personnel in repairs and testing of pumps
- Trained many employees on troubleshooting, repairing, testing, and operating pumps which resulted in an increase in production
- Removed, overhauled, and repaired over 50 pumps saving the US Navy millions of dollars
- Maintained records and reports that contained confidential government information.
0-5 years of experience
Created and controlled standard work documentation and profile charts to aid employee training and manufacturing process development.
- Participated in quarterly Kaizen and 2P events that focus on process improvement as well as increasing throughput.
- Developed Kanban system to solve inventory issues that focus on inventory being at point of use for operations.
- Worked directly with Manufacturing Engineers in a 12 million dollar project that implemented a new window product to meet 2015 Energy Star standards.
- Developed production layouts with an intent of improving fabrication flow and implementing one piece flow where applicable.
- Conducted many cycle time studies and compared against TAKT times to better understand line balancing that help to determine process capabilities.
- Set up and maintained new production lines.
0-5 years of experience
Created software modules to automate task within Esprit, AutoCAD, ProE/Creo, Ms Excel, and the CNC machinery.
- Programmed and proved out 5-axis MillTurn impeller parts on Mazak Integrex.
- Provided programming and machining support for emergent processes.
- Trained other technicians in the engineering department on how to use Esprit, ProE/Creo, AutoCAD, and CNC machines to help support the shop floor.
- Diagnosed processes to eliminate quality issues and reduce cycle times.
- Created and proved out processes for all machines on the shop floor.
0-5 years of experience
Create and implement SOP’s and training manuals on operation, maintenance of equipment and processes.
- Organized and coordinated group of six packaging technicians on the installation of 7 new packaging machines on new high volume bottle filling production line.
- Developed and conducted training for packaging personnel including 36 operators, 8 packaging technicians, and 3 supervisors.
- Executed Factory Acceptance Tests on new packaging equipment, including overseas purchase of high-speed bottle labeler.
- Participate in continuous improvement team to streamline packaging process and documentation needed for Master Batch Record.
- Initiated tracking and storage solutions for change parts and spare parts of new packaging line.
- Work directly with customers, suppliers and contractors to identify process and material problem resolutions.
6-10 years of experience
Engineering Technician, responsible for product disposition, process improvement, yield learning, tool debugging, and process documentation. Worked with Engineers and other Technicians to run experiments and develop processes.
- Capital Process equipment- Expertise in Brooks Automount and Steag HamaTech ASX Clean Tools. Experienced in operating support equipment: Lasertec M1350, Corning Tropel Flatness.
- Received Patent for ‘A Method for Reducing Photo-mask Distortion’.
- Helped develop pellicles for 15nm, 22nm and 32nm technologies.
- Worked with various Lean initiatives.
- Participated in T0 implementation of EUV Mask manufacturing.
- Developed and implemented a Mask Clean Process the improved Mask Yields 4%(perfects).
0-5 years of experience
Performed data analysis and provided recommendations to achieve project deadlines met at or under budget.
- Prepared plans and layouts for equipment or system arrangements and space allocation.
- Interpreted drawing markups and implemented drawing revisions provided by engineers.
- Reverse engineered hardware to facilitate documentation.
- Assisted technical support department in troubleshooting product returns and after-sales support to ensure customer satisfaction.
- Identified and solved electronic design problems, resulting in more efficient and cost effective products.
10+ years of experience
Directed reliability testing and characteristic evaluation as part of the validation of Intel’s Itanium Processor and Xeon Phi(TM) coprocessor.
- Constructed new systems to advance validation and content development as part of mock executions.
- Debugged tools failures through responsive support to engineers tasked with tools releases.
- Ran debug scripts to identify known signatures, summarizing results and saving bandwidth for engineers. Equipped tool owner, debug team, and engineers to identify tools issues 30% faster.
- Introduced and integrated auto-close functions into auto-debug scripts for auto triage, decreasing the number of open failures from tools and averting tool break/cycle break in automation.
- Tested the mechanical and electrical functions of hard drive media, collaborating with engineers to produce correlation samples and establish new test procedures.
- Devised new product testing protocols for use on manufacturing line, consulting with other internal divisions to boost production yield.
- Performed engineering experiments. Trained new technicians. Compiled and evaluated test data.
0-5 years of experience
Manage up to 15 technicians to maintain industrial manufacturing equipment and systems
- Implemented [company name]’s first robotic paint system
- Developed and implemented new preventative maintenance system
- Designed and authored all preventative maintenance procedures
- Specified and integrated equipment and system installs and upgrades
- Provide efficiency analysis to increase productivity, reduce energy, and enhance maintainability
6-10 years of experience
Recognized need in factory for a specialized position to improve production assets and reduce dependency on outside contractors, proposed & created. Responsibilities included modification, improvement, reverse engineering or redesign of food processing equipment & components. Utilized machine shop, CNC, fab equipment & software including Solidworks, SurfCam and CadCam. Coordinated with engineering, management, contractors on projects and installations. Machine “owner” during installation phase of pilot line responsible for installation including setup, fit modifications commissioning. Specialized in identifying equipment deficiencies and implementing improvements. Led waste water testing prog (TSS & BOD), with SOP & PM.
- Created Engineering technician position, annual savings up to $200,000 annually.
- Innovated “Pouch Burst Test Gauge” for product consistency, adopted by other plants.
- Reverse engineered and machined extruder funnel assys saving Nestle $22,000.
- Performed duties as acting supervisor on as needed basis.
10+ years of experience
Lead Engineering Technician for 8 years pertaining to all circuit boards for light-rail trains and people movers. Lead the team for all Bombardier contracts by delegated work flow and ensured correct product was being processed to meet customer needs.
- Work as a liaison between management, planning, manufacturing and our customers to guarantee
- Participate in Failure Analysis on production assemblies to improve yield. Attend MRB meetings as needed to represent Test Department when problems arise.
- Involved in numerous projects pertaining to safety, process engineering, quality control, and test to ensure that products are produced in accordance with design requirements.
- Tested, troubleshot, and repaired a variety of printed circuit boards for light-rail trains, the medical industry, nuclear power plants, the military and multimedia teleconferencing.
- Assisted engineers in the designing of new circuit boards, test equipment, and software.
- Highly involved in setup, production, and test of circuit boards for new contracts.
- Modified, redesigned, and developed new test fixtures and test document procedures to manufacture products for an assortment of customers.
0-5 years of experience
Evaluated paper products as well as printers for functionality according to published specifications. Performed preventative maintenance, calibrated various laboratory equipment and completed upgrades to all laboratory computer hardware and software.
- Supported engineers in meeting requirements of developmental and experimental products, assisting with lab testing for newly designed label products.
- Applied engineering skills and methodologies to support design requirements, using laboratory equipment to test customer requirements.
- Applied knowledge and experience of engineering functions to support designs and experiments in lab environment, independently conducting appropriate testing required.
- Developed processes, streamlining material testing phase for timely completion.
- Conducted trials on press from conception to final product, resulting in receipt of patent.
- Completed lab drawdowns of adhesive and release coatings for proof of concept prior to conducting trials, ensuring reductions in costs while eliminating incompatible materials.
- Managed activities of buffer employees in proficient manner by scheduling personnel, ensuring processes operated effectively and efficiently while meeting target completion dates.
0-5 years of experience
QC for guy wire inspection project completed 15% above target; CenterPoint Energy
- Completed GPS and Transformer inventory project 20% above target; AEP Texas
- Lead damage assessor for winter storm response; Oncor Electric Delivery
- Performed sound and bore project 10% above target; El Paso Electric Cooperative
- Completed RUS and infrared project 10% above target; Mid-South Cooperative
- Completed RUS coding project 20% above target; Bailey Electric Cooperative
- Accumulated 2,200 safe hours
0-5 years of experience
Assisted Vendors in tool installation and start-up of tools. Once the training with the vendors was complete I wrote preventive maintenance and general operation work instructions that were used in the initial training of all employees in different areas throughout the plant
- Trained operators and maintenance personnel on general operation and preventive maintenance procedures. This included overall safety procedures of the tools, process, and different levels of operation of the tool.
- Oversaw training goals, provided coaching and training roadmaps for employees to ensure that they met company goals in a timely fashion. This included keeping track of all training certs acquired from level 1 to level three.
- Assisted in the development and refinement of the process
- Perform various P.M.’s on the INNOLAS scribe tool sets which include but not limited to laser adjustments, needle replacement, tool calibrations. Also performed p.m.’s on CIG’s tools and PVD tools which included but not limited to target and shield replacement.
- Identify required spare parts, procure spares and manage such that proper inventory exists
- Over saw 5s throughout the factory for the maintenance department
- Internal Auditor for ISO 9001