0-5 years of experience
Planned, developed and maintained schedules for a number of IT projects adhering to Project Office standards using Primavera 6.1
- Planned and Managed projects using both Waterfall and Agile/SCRUM methodologies
- Updated Project Dashboard with various reports (Earned Value, Burn rate, Resource allocations, Key Milestones, etc.) on a monthly basis as part of the Project Management Office (PMO) requirement
- Analyzed and maintained all reported project activities emphasizing items such as Scope Variations, Slipped Tasks, Upcoming Tasks, and Actual Hours vs. Planned Hours.
- Educated and advised project teams on various Project Management processes – planning, controlling, executing and closing
- Organized and facilitated planning sessions for new projects and took care of re-planning for on-going projects as and when required
- Collaborated with project teams to ensure schedules are accurate and ensured that all the changes and their impacts are accurately reflected in schedules.
- Monitored projects for adherence to schedule, cost and for achieving milestones
0-5 years of experience
Created and revised schedule templates based on the project type and scope details in order to sequence deliverable prior to the start of the project
- Created Work Breakdown Structure (WBS), input project activities, determined activity durations, and logic relationships.
- Created milestones to identify the start of work including activities that required constraints.
- Loaded resources into the project resource wizard in Primavera P6, maintained and assigned baseline schedules for the project.
- Monitored and updated project progress on a routine basis against established scope, schedules and budgets.
- Identified critical activities and schedule variances that will put key milestone dates at risk and proposed remedial action plans.
- Communicated project status report to Project Management Team (PMT) and client on a
- Printed 3-weeks look ahead with columns to indicate remaining duration and issue standardized performance reports on EV, SPI, CPI and EAC.
0-5 years of experience
Integrated three separate Work Breakdown Structures (WBS) into one rollup module.
- Implemented deliverables and dependencies logic to establish links.
- Maintained several WBS’ for different teams.
- Established various Project Management Plans, i.e. Communication, Risk Register, Action Item Register, etc.
- Provided Status reports to Management and internal teams on a weekly basis.
- Uploaded information onto a Sharepoint.
- Used Agile Methodology to define smaller deliverables in order to meet dates for various phases.
0-5 years of experience
- Worked on a diverse team of 10 to plan and execute 40 corporate service events for over 4000 volunteers
- Managed the relationship between 8 schools and community centers to provide and design beautification service projects
- Managed staff of 45 in planning, preparing and executing service for over 350 volunteers on MLK Day 2011
- Planned and led team builders for 17-24 year-olds to build trust and communication among team
- Designed and presented a training for twenty 17-24 year-olds on basketball’s impact on youth development
0-5 years of experience
Wireless communications program management, facilitated the delivery of new Wireless WAN, LAN and PAN products.
- Managed project schedules for project based inputs and commitments from all groups involved.
- Created localization plans for hardware and documentation, coordinating samples for all teams involved.
- Developed bill of materials, kits, part numbers and all engineering change orders.
- Coordinated documentation and information flow between the different groups involved in product development.
0-5 years of experience
Organized, planned, and executed projects that produced revenue. Maintained EHP’s corporate website. Updated content as needed and formatted all website content.
- Deployed an Online Health Referral System. This platform allowed HCP’s to submit online patient information in real
- Created various planning databases. These databases included various IBM-DB2, Microsoft Access, and Mysql databases
- Developed and assisted with the launch of a Dental Order ID card Database.
0-5 years of experience
- Provided knowledgeable support and backup to sales, resolving materials, manufacturing and/or scheduling issues
- Facilitated development of a more profitable pricing structure for one of the company’s highest volume customers
- Ensured project documentation, scheduling and deliverables mapped precisely to customer requirements
- Acted as liaison between manufacturing, the sales team and external customers, effectively communicating and maintaining milestones throughout project lifecycles
- Organized, prioritized and input time critical projects for high visibility national and international clients
0-5 years of experience
Responsible for all aspects of schedule activities, setup and maintenance of all scheduling tools, processes and procedures, including labor performance tracking tools (55 million GBP)
- Developed, managed, updated, and monitored individual project schedules and integrated overall master program schedule.
- Planned, scheduled and estimated project activity times, sequencing those activities from concept to completion.
- Prepared weekly and monthly project progress
- Developed schedules based on construction team plans, resource load schedules, analyze float paths and assess schedule status
- Prepared and analyzed schedule reports and schedule variance
- Effectively load cost and resources in the project schedules
- Monitored actual progress, compare to baseline and report progress against schedule.
- Effectively managed work order and change management
- Created, maintained Project schedules of over 8450 activity lines items
- Created Work Breakdown Structures (WBS) and development of schedules and budget data (including resource loading) for those WBS elements
0-5 years of experience
Planned, developed and maintained several schedules of identified activities in a logic based schedule program while supervising 3 lower-level Project Controls schedulers using Primavera P6
- Integrated the constraints of the client, schedules and coordinated all the Drawing and Construction packages while establishing the interfaces with all the internal and external contributors using the Critical Path Method
- Determined and analyzed critical path activities for identification of potential delay impacts
- Loaded and monitored various activities Revamps, shutdown, Turnaround (FEED- Detail EPC)
- Informed the Project Manager and the Project Team as soon as possible of any significant drifts or variation in the schedule
- Collected, updated and consolidated the physical progress follow-up for the project.
- Proposed and coordinated the corrective actions for reducing risks of delay, maintaining floats and improving time control
- Provided support in the area to project Sub System Managers and Work Package Owners.
- Established and maintained schedule baselines.
- Created, maintained, monitored & controlled both Work-stream and Program Master Schedule.
6-10 years of experience
- Reviewed and analyzed company, Department of Defense (DOD) and government customer documentation; determined tasks to be performed; developed schedules and completion dates; prepared contractually required reports.
- Compared progress reports with predetermined schedules; identified significant variances for corrective action by project engineers/managers.
- Performed monthly analysis using Cost Scheduling Control System Criteria (C/SCSC) to produce Performance Measurement reports sent to Marshall Space Flight Center.
- Determined status/updates (earned value) procedures and contract baseline changes for Solid Rocket Booster tasks which included material purchasing, travel, and labor financial account validation.
- Coordinated official communication between the company and customer.
0-5 years of experience
Worked directly with the Project manager and team leads to develop (WBS) work breakdown structure and schedules, to ensure that all project requirements are in place, tracking through planning stage to project or
phase closure using Primavera and Microsoft Project.
- Developed a resource loaded Engineering Procurement and Construction schedule. Review sub-contractor
- Create bi-weekly and monthly reports based on analysis of the overall project schedule and tracks against the baseline, specifying areas of variance and recommended remedial action to the Project Manager.
- Prepare and issue progress reports in a clear and easily interpreted format such as S-Curves and Histograms.
- Performed critical path analysis, generated look-ahead and variance reports against project and previous
- Provided accurate, clear and timely status reporting to senior business executives and facilitated all related
0-5 years of experience
Scheduled for Manufacturers of a range of biologically active organic fertilizers and soil conditioners produced using patented technologies.
- Planned and scheduled the expanding production to establish the products as a trusted brand in the rapidly growing ecological agriculture sector in developing African countries.
- Consolidation of its existing partner companies operations and investment in new production facilities to increase annual production six fold.
- Developed a business plan for The Group seeking funding of €35 million including contingency comprising of equity with a four year exit strategy.
- solutions to implement the Natural Resource Management (NRM) programs using locally available resources.
- Coordinated a wide range of business and consulting activities related to resource development, project management and final beneficiation in Climate Change and Green Energy Initiatives includes Clean Development Mechanism (CDM) and Joint Implementation (JI) Projects initiation and implementation. Tracking of NO2 from agricultural practices, biomass degradation and methane capture,
- Guided and advised clients on how to effectively, efficiently and economically create a Work Plan to ensure sustainable Institutional Development Planning, Poverty Reduction Initiatives and the achievement of the set Millennium Development Goals.
- Monitoring and evaluating tools to be developed and integrated into the Work-Plan include detailed methodology, justification, timelines and itemized cost quotations.
0-5 years of experience
- Determined type of trainer required
- Served as Project Leader for trainer design
- Evaluated bids for trainers fabricated by outside organizations
- Supervised and coordinated the design, fabrication, and assembly of trainers
6-10 years of experience
- Responsible for planning, scheduling and control the Engineering, Procurement and Construction phases for multi-projects with a value of $1020M.
- Prepared projects Schedule baseline and Cost baseline then control deviation throughout the project life cycle to finish the projects ahead of schedule and under budget. (applied Primavera P6)
- Provided control and forecast for financial matters relating to assigned projects.
- Effectively sequence and plan to meet budget requirements.
- Responsible for impact analysis and assistance with Engineering Change Orders.
- Produced various management reports including resource histograms, detailed progress, performance index and budget forecast.
- Developed Document Management System using SAP_DMS
- Developed and implement Defects Management System
6-10 years of experience
Monitored cost, schedule and scope of assigned subcontracts to assure best quality
- Updated and maintain records and files as necessary.
- Supply Chain Management duties interviewed suppliers to obtain prices and specifications.
- Ensure compliance with all company policies analysis discrepancies, specifications, and ward contract to bidders.
0-5 years of experience
Performed project planning using Primavera Project Planner and Suretrak Project Manager
- Generated project reports and updated project schedules.
- Prepared project budgets.
- Performed technical BID evaluation and analysis
0-5 years of experience
Planning and coordination support across multiple and varied IT projects running simultaneously ensuring on-time, on-budget completion of assigned projects with heavy utilization of MS Project and Project Central.
- Developed and maintained high-level and detailed conversion/rollout MS Project workplans, detailed performance metrics, burn-rate reports and time/expense reporting templates equipping project managers and teams with tools for visibility and tracking of project timelines, requirements and status.
- Trained and guided project managers and teams on standard methodologies, best practices and use of Project Central helping to ensure seamless, on-track progress of projects.
- Alerted Project Managers to actual and perceived planning and scheduling conflicts/issues on projects, suggested mitigation actions, provided data for project assessments, compiled and tracked data to monitor project progress, facilitated weekly status meetings and tracked issues through to resolution freeing-up managers to direct more of their attention to higher-level project management issues.
- Generated detailed communications to project teams throughout all project phases to gather team input and feedback for work plan development, to coordinate timely kick-off of team member tasks and to document project progress enhancing team cohesiveness and efficiency of team efforts.
- Coordinated the sequential starts of tasks to the strict timelines of project dry-run and go-live phases; collected and disseminated time-critical information during those phases consistently resulting in on-time system restarts and resumptions of normal business activities.
0-5 years of experience
- Responsible for reviewing mill order processing plans to ensure they meet metallurgical and customer standards
- Schedules mill orders to meet negotiated ship dates without violating established lead times and facility loading parameters.
- Developed a supply chain scorecard as a way for management to evaluate performance against department goals.
- Addresses department’s logistical needs by tracking inventory for various types of steel, using a daily stock tool.
- Created a system for tracking order entry errors in order to reduce slow processing times and to help management identify training needs for sales staff.
6-10 years of experience
Responsible for maintaining all aspects of the electrical system throughout [company name].
- Responsible for managing, prioritizing and completing electrical work orders as they are assigned.
- Coordinate other trades when necessary to complete work orders
- Secured and coordinated outside contractors to perform capital improvement projects.
- Member of the [company name]’s Strategic Planning team for the entire district, as well as the Maintenance and Operations department.
0-5 years of experience
- Providing schedule/planning support on project proposals, tools procurement, technologies
- Developed Work Breakdown Structure (WBS) and independently schedule and track
- Participate in developing Integrated CPM schedule, which shows the sequence of events
- Preparing bi-weekly and monthly progress reports, perform progress analysis, schedule
- Prepared various reports including milestone reports, earned value analysis, variance and
- Monitored schedule progress and performing variance analysis in comparison to the
- Recorded and updated weekly activities relating to percentage complete, earned value and
- Assisted project teams in understanding and performing risk assessments and risk
- Assisting business units with tools procurement, technologies transfer, bid packages,
- Developed and maintained resource loaded project schedules for engineering, procurement,
10+ years of experience
Successfully carry out projects from start to completion
- Interface and coordinate with team members and different departments to ensure that the project goals are accomplished within the established project time line
- Manage Component Forecasting; prepare and post scheduled maintenance report for Senior Management
- Perform project progress monitoring duties including identifying critical activities and reviewing forecasts with progress achieved date
- Work directly with Field Support to minimize downtime
- Research and resolve issues that may hinder project completion
- Plan, expedite, coordinate and purchase major components and parts for “on-time” delivery to their requested/required bases
- Coordinate with respective Departments to ensure the products division requests for work are properly routed
- Develop and maintain computer generated spreadsheets, reports and charts on a regular basis and review, approve and allocate expenses to appropriate work orders
0-5 years of experience
Responsible for developing/updating and maintaining the primary Tool Install Project Schedule.
- Coordinate & Schedule Design Reviews, and send out meeting notifications to appropriate Functional Area teams.
- Develop/maintain e-mail distribution lists for each functional area team.
- Assist team in developing improvement strategies.
- Develop various scheduling activity reports associated with a project as requested by the client and management.
- Publish on a daily basis, a two week look ahead for the project teams to use in planning activities.
0-5 years of experience
- Created and set a baseline schedule for EPC schedule detailing the sequence of all work to be performed.
- Ensured that baseline is achieved through the use of approved change order / variance procedures.
- Maintained and updated the Project schedule, identified the impact of work performed and not performed as scheduled.
- Evaluated actual EPC progress and provide regular schedule updates.
- Published monthly project reports such as progress S- Curve, Look ahead, Critical path Analyses and Resource capacity.
- Maintained relationship with project personal, particularly with discipline leads in home office and at site.
- Incorporated resource and/or Man-hour data into schedule as required.
- Interfaced with project team to discuss the impact of work and resolution of problems.
- Assisted the Project Manager in creating short-term schedules, monitor such schedules to determine impact on master schedule, and help in formulating actions to correct scheduling problems.
10+ years of experience
- Scheduled and completed over 3000 major assemblies in production with optics & mechanical assemblies. Reviewed MBOM/drawings for accuracy and requirements to build. Created manufacturer MBOMS and routings and work orders.
- Developed and maintained various data bases to track all work orders for production and repair. Estimated labor & materials. Worked with the machine shop, engineering & purchasing on establishing achievable schedules by advising on delivery schedules from the vendor and shortages.
- Supervised employee’s in a manufacturing environment. Setting priorities, estimating labor hours. Leading lean manufacturing processes and training. Implementing safety methodology. Purchasing required tools, equipment and raw material.
- Reviewed and approved new specifications & drawings created by the engineering design group, making appropriate changes as required in the documentation data base.
- Lead project status meetings to interact with coordinators, buyers, engineers, project & senior managers to review drawing packages and to update work status.
0-5 years of experience
Planned and Schedule Construction of the multi-purpose Airport, Managed the “day-to-day” project plans by creating, managing, maintaining and updating project schedules; performed critical path analysis and developed timelines for completion of tasks; developed WBS and measured the deliverables work packages of the project against the project plan
- Develop and analyze project schedule to align with project scope and deadline, create WBS and allocate resource/ load Integrating subcontract schedules with project master schedule.
- Identify critical Path Activities (CPA) and near critical, and advise project team accordingly.
- Update project schedule weekly with accurate data-entry of data-date reports throughout project cycle.
- Furnished progress reports for meetings using Primavera and Office report tools, presentations with any and all stakeholder when needed, especially team-mates and lead.
- Attended progress meetings with design consultants, construction managers, and contractors to review and approve baseline schedules, and attended other scheduled meetings as necessary to stay current on schedules
- Used knowledge of float to crash couple of projects. Perform other functions assigned by project management Served as the single point of contact for project scheduling and changes.
- Created, maintained Project schedules of over 2450 activity lines items
- Managed administrative, technical, and resource management aspects of a project including planning, resourcing loading, and scheduling, coordinating, communications, monitoring, evaluating, and problem-solving
- Meet the Project team weekly to update, discuss 2 week look-ahead task list and report on a real time project progress
- Supported the project team through the preparation, monitoring and updating of schedules while working with site leaders to formulate action plans to correct scheduling problems using Primavera Project Planner.
0-5 years of experience
Determine the critical paths required to meet the overall project completion date, modify critical paths based on prevailing conditions and consult with Project leadership team to develop workarounds to overcome obstacles.
- Receive and understand client/subcontractor constraints, integrate constraints into the project schedule and evaluate and report schedule impacts.
- Post, publish, and distribute updated project coordination schedules. Discuss the current and upcoming schedule milestones and the critical schedule activities in the Weekly Progress Meeting.
- Develop presentation quality summaries and update production charts as required for standard meetings and/or as requested.
- Attend regular and special scheduling meeting and update the schedule. Notify Site Project Team of modified dates that affect the Contractor’s work operations to allow appropriate notification and resolution.
0-5 years of experience
Facilitate project-planning sections with key stakeholders.
- Create and Build project schedule using project management tools (Primavera P6).
- Produce and interpret weekly reports concerning project health for the PM and project leadership.
- Monitor project risks, issues and dependencies.
- Monitors resource assignments for accurate allocation against staffing plan to ensure proper utilization.
- Monitor the project progress against approved project baseline for activities, milestones and dependencies.
0-5 years of experience
- Led the Project Planning & Control Team
- Project Management experience by taking role as lead in inventory of web sites in an application
- Led and Ensured all contract deliverable were complete, accurate, and submitted on time
- Completed monthly metrics of project scopes
- Revamped the integrated master schedule to be used contract-wide
- Evaluated project procedures and Implemented additions to Integrated Master schedule
- Maintained project schedules using an IMS for contract wide projects using excel and Microsoft Project
- Implemented additions to Integrated Master schedule, (Queue and Rebaseline tabs)
- Captured action items during customer meetings and delegated actions
- Planned, maintained and overall multiple meetings a day using WebEx and Microsoft Outlook
0-5 years of experience
Develop well-defined and properly sequenced work activities for a pharmaceutical project
- Understand the flow and logistics needed for project
- Operate Primavera scheduling software
- Analyze critical path and constraints to determine effect of changes to schedule
- Create and update schedule weekly, working with superintendents and field engineers
0-5 years of experience
Created Project Schedules in Primavera (P6) Per Order Entry Packets (Project Charters) and update on-going Project per approved change order.
- Coordinated regularly with Resource Managers, Process Engineers, Project Managers, and other key stakeholders that contribute to Projects Success.
- Perform “What-If” analysis of Projects that has Customer Scope Changes or Projects that are R&D.
- Monitor project milestones and deliverables of Active Projects in Primavera.
10+ years of experience
Assess load requirements, evaluate environmental constraints and identify project requirements
including permits, easements, aesthetics and fees.
- Perform cost estimates, plan material needs and follow up on progress of distribution projects from inception to completion.
- Perform power system calculations and interpret engineered construction drawings.
- Negotiates design details in conformance with company standards.
- Interface regularly with contractors, engineers, developers and consultants.
- Identify project objectives and work to resolve project conflicts.
6-10 years of experience
Responsible for developing, preparing, managing and monitoring the implementation of Program of Requirements (POR) and Statements of Work
that details and explains critical design elements for new and existing capital
improvement projects to include: academic, healthcare, research facilities,
student housing, dining facilities and athletic facilities.
- Develops and prepares Request for Qualifications (RFQ) documents for the pre-design phase of System Capital improvement projects and assists in the
- Managed key project aspects of scope, budget, schedule and project
- Assists with updating the System Capital Plan by obtaining and reviewing
- Assists in the preparation of System Capital Plan additions and approval for construction, agenda items and presentations for the Board of Regents
- Conducts POR, Capital Planning, Master Planning and Feasibility Study
- Serves as primary contact for System members for POR, Master Plan and
0-5 years of experience
Responsible for the creation, planning and development of the Go-live implementation plan
- Developed project Plan using MS Project and specified Goal strategy
- Identified and scheduled project deliverables, milestones and required tasks
- Worked as liaison between the consulting team and business team to identify the cutover requirements and appropriate resources
- Hands-on contribution to the development and maintenance of Work Breakdown Structures (WBS) and Budgets
- Prepared service requests for financial reporting to PMO
- Prepared written and verbal reports regarding cost and schedule variances
- Developed and Managed the Go-live Plan using SDLC and Project Management rules and Methodologies
- Prepared project status reports and kept Management and Clients informed of the project status and related issues
- Managed multiple (Technical Projects) applications, infrastructure at different Project Phases
0-5 years of experience
Acts as liaison between all parties concerned to address proposed modifications to project scope, schedule, and influence to minimize changes
- Proactively assesses and analyzes any risks and issues that may compromise project team performance and results with Project Management; develops plans to remove or mitigate them.
- Works with functional managers to resolve schedule and resource conflicts
- Under the direct supervision of the Operations Cell Supervisor, the Project Planner plans, leads, and facilitates regular cross-functional project team meetings
- Proactively identifies changes in work scope and ensures appropriate planning measures are taken with internal and external clients to reassess, renegotiate, and amend scope of work responsibilities, proposals, and contracts
- Performs other duties as directed. Created and maintain employee security files in accordance with government and company guidelines with the processing of finger prints.
- Assist in the processing of proper documentation to obtain new security clearance through the electronic questionnaire for investigation processing (e-Qip) SF-85 and SF-86.
- Provide administrative support that includes investigators review of personnel security files (PSF), review of personnel security questionnaires (PSQ) to meet government contract requirements.
- Created and maintain personnel security documents in both hard copy and magnetic media.
- Process request for reinstatement of security clearances and periodic reinvestigation every 2 years and 4 years.
10+ years of experience
Worked as a web and software developer on various projects and applications with various clients.
- Developed various projects primarily in OOP PHP with and without MVC frameworks.
- Developed responsive HTML/CSS/Javascript web sites with and without popular frameworks such as bootstrap.
- Developed MySQL, MSSQL and MongoDB database schemas for sites and applications requiring data storage.
- Setup and installed Linux Server installations, Apache, MySQL, and PHP5
- Developed native JAVA mobile applications as well as Hybrid mobile applications for android and IOS.
- Developed SPA with AngularJS and with JQuery
- Experimented and developed websites with Node.js
- Developed various company and personal websites and applications for people of all walks of life.
- Worked with various teams and contractors while maintaining code via Github and bitbucket repositories.
- Utilized technologies: HTML5, CSS3, Javascript,, Jquery, Ajax, json, Yaml, Mysql, Linux Desktop, Linux Server, ASP.NET, MSSQL, VB, C#, Android SDK Development, Java Programming, XML, XSLT, OOP PHP, Codeigniter, Symfony2, ZEND, PYTHON, MongoDB, Adobe Cloud Software, GIT HUB, Bitbucket.
0-5 years of experience
Working in the General Motors Business Unit with program management from project kick-off to close
- Identification and development of work breakdown schedule
- Development of the critical path schedule
- Follow up with internal and external departments and companies to insure work and status updates are in compliance with critical path schedule
- Weekly analysis of total float for risk assessment of critical milestone activities
- Upload files to SharePoint for status updates
- Weekly publishing of all schedules in PDF format on the company intranet
- Support program management to insure project is completed under budget and on time.
- Write weekly review of all project for executive review
6-10 years of experience
Design of Rock Crushing equipment to meet customer’s specifications using AutoCAD 2014.
- Management of inventory and deliveries of specialty items to meet production schedules.
- Customer Service/Sales – Small projects and parts
- Pricing of replacement parts for service of product once completed.
- Coordinating of shop schedules to insure productivity of available work space.
- Field work and design of specialized equipment for logging/mining equipment.
- Work with vendors for scheduling and delivery of components.
- Job costing and analysis of finished products to ensure profitability.
- Design of hydraulic systems for conveyor systems and plant production.
0-5 years of experience
- Develop competitive profiles and market condition analyses for captured and new markets to ensure that updated information is available for management decision-making
- In charge of managing the Market Load System, a software that is used to manage data to determine operational performance
- Prepare historical reports that aid in formulating traffic and revenue projections for passengers, freight, and excess baggage on domestic operations
- Prepare statistics needed for the analysis on reduction/addition of flights for domestic operations
- Correspond and work closely with departments such Cargo Department, Fleet Planning Department and all Domestic Stations
0-5 years of experience
- Tender Preparation & Evaluation, Preparing pre-qualification document including involvement in preparation of execution strategy, Defining scope of work, preparation of Commercial clarification, etc.
- Check cost solidity (estimate, budget, firm offer from sub-suppliers)
- Providing distilled feedback to the top management, including MIS reporting for formulating business strategies.
- Cost Analysis, Schedule preparation, pre-planning and resource forecasting.
- Review and check all new instructions & documentation received from either the client or authorities.
0-5 years of experience
Performed Daily Resource job planning in Excel
- Update planning Data Base Program to keep track of scheduling
- Update percentiles on Turnaround work progress
- Coordinate multiple contractors to sign off Closure Books
- Interface with Operations during as needed due to execute scheduling and planning of mechanical and piping jobs.
- Coordination of Provided guidance and leadership to help supervise project personnel.
0-5 years of experience
Utilize Primavera P6 to develop detailed schedules, determine project duration and critical
path identification for complex industrial construction projects
- Create comprehensive spreadsheets to accurately reflect information extracted from schedules
- Risk assessments of each project to provide an insight to possible project delaying factors
- Key member of Project Management Office that establishes high and consistent level of communication with all levels of management throughout project duration
10+ years of experience
- Planning, Scheduling, Estimating Projects & Project execution.
- Supervised Special Projects, Capital Projects, Turnarounds & Unscheduled Outages.
- Special Projects Inspection on refinery wide Instrumentation, Electrical & Documentation Revisions.
- Routine Maintenance on wide verity of Electronics, Pneumatics, Process Controllers, PLC’s, Honeywell TDC 2000, 3000, & Experion systems.
6-10 years of experience
Oversee Product Line throughout the life of Product
- Maintain Schedules and Run Weekly Team Meetings
- Interact with Shop Floor employees and Foremen as well as Engineering Staff to create quality product
- Query data tables to project completion dates and monitor product progress
0-5 years of experience
Developing, preparing and maintaining construction resource loaded schedules.
- Participating, establishing and maintaining the various scheduling tools and report for O&R, such as Electronic schedule update tool, cost loading tool, customized look-ahead report, master schedules and progress measurement systems.
- Responsible for project controls and providing assistance with the management of all activities associated with planning, scheduling, forecasting, critical path analysis, manpower & cost data, progress reporting and time-recovery strategies.
- Developing and maintain code dictionary (resource, project, cost, activity codes) for O&R and update Project codes, activity Codes and align with established scheduling standards
- Field verify construction schedule progress utilizing earned value principles
- Incorporate material delivery durations into the construction schedule
- Validate and incorporate approved variances in to construction schedules
- Attend Interactive Planning Sessions as needed
- Assisting in the monitoring, reviewing, and analysis of the schedule and status during all phases of the project, including the analysis of any schedule deviations and corresponding corrective actions.
- Ensuring accurate and timely reporting to management and respond to the requirements of management.
- Liaising and interfacing with contractors, construction, project management and team leads regarding planning and scheduling activities.
0-5 years of experience
- Assures product and process quality by designing testing methods; testing finished- product and process capabilities; establishing standards; confirming manufacturing processes
- Provides manufacturing decision-making information by calculating production, labor, and material costs; reviewing production schedules; estimating future requirements
- Keeps equipment operational by coordinating maintenance and repair services; following manufacturer’s instructions and established procedures; requesting special service
- Updates job knowledge by participating in educational opportunities; reading professional publications; maintaining personal networks; participating in professional organizations
- Achieves operational objectives by contributing information and recommendations to strategic plans and reviews; preparing and completing action plans; implementing production, productivity, quality, and customer-service standards; resolving problems; completing audits; identifying trends; determining system improvements; implementing change
0-5 years of experience
- Project Approval Board facilitator
- Weekly Cost Variance tool manager
- Weekly schedule updates manager
- Build schedules for projects
- Control schedule operations for management
0-5 years of experience
Problem solve design concepts
- Order BTD parts and components
- Manage project schedules
- Manage vendor quality issues