10+ years of experience
Managed design and construction of all facilities, provided technical support for plant managers, and developed maintenance programs for roofing. On expansion projects, established design teams to develop conceptual designs and project budgets, established timelines, prepared bid packages, pre-qualified bidders, obtained and evaluated bids, negotiated and awarded contracts and provided project management. The following projects are a sample to provide more detail of specific experiences.
- Managed the design and construction of a $22 M automotive interior parts manufacturing facility in Hermosillo, Mexico. Worked with the C&A manufacturing management team to develop the lean manufacturing layout. Then designed the 420,000 SF facility to meet the specified requirements. Led project team in value engineering exercise to reduce the project cost by $1.2 M to meet CEO mandate and to obtain project approval.
- Managed the design, construction and relocation of the C&A Global HQ from Troy to Southfield, MI. Staged moves to relocate 860 associates without loss of office hours. Space planning resulted in an efficient layout reducing SF/employee by 39%. The first year lease and operating cost were reduced by $2.4 M.
- Developed a plan to renovate the deteriorated structure of a yarn dyeing plant. The plant operated at 100% capacity and could not be shut down for construction. Led team in developing a plan for an expansion to provide space for new machinery. The additional capacity allowed a phased rework of the deteriorated structure. Project was completed without shutting down operations or impacting delivery to customers. Also, increased capacity by 20% allowing reduction of yarn purchased from suppliers. In house production produced an 18% yarn cost discount as compared to supplier’s cost.
- Managed the design and construction of and 85,000 SF expansion to a C&A fabrics plant to prepare for consolidation of an acquired company. The $7.1 M project included relocation of employee parking lot and underground utilities. Project was completed on schedule to allow for the sequenced relocation of machinery so that shipments to customers were not impacted.
- Developed a Five Year Roof Maintenance Plan for each C&A facility. Assisted the plant engineers in implementing the programs resulting in reduced roofing costs by extending roof service life by 20 – 30%. Developed an annual corporate roofing bid package – by packaging all roofing RFQ’s into a single bid package early each year, leveraged volumes to obtain discounts up to 20%.
6-10 years of experience
Resident engineering, supervision, and materials and construction inspection of highway reconstruction projects.
- Provided thorough project documentation and communication to avoid and resolve contractor claims that strengthened company’s reputation with key clients, Illinois Department of Transportation (IDOT) and Illinois Tollway.
- Resolved specification interpretation conflicts and quantity disputes on site between contractor and inspector and saved the client 25% of the cost of extra work requested by the contractor.
- Responded to contractor and client requests usually within the same day to coordinate communications between client and contractor to complete project ahead of schedule.
- Minimized change orders to complete a project that required field redesign after project award.
- Maintained project budget under the client’s allowable 20% increase, with additional costs below 11%.
- Averted project funding losses on delayed projects by expediting the closeout and delivered completed project records to the clients allowing them to close their books on the projects.
6-10 years of experience
Directed construction engineering group responsibilities. Managed four to eight construction projects yearly. Oversaw provision of monthly reporting documents and authorship of biweekly board of directors’ agenda items for approval. Participated in numerous technical committees representing construction and maintenance divisions and coordinated design, planning review, and interface functions with staff. Worked under contract assignment for one year at Red Bluff, California; Red Bluff Pumping Plant & Fish Screen; and Sacramento River Division-Sacramento Canals Unit, Central Valley Project, California. Managed Bureau of Reclamation, Department of the Interior.
- Supervised five engineers and two assistant engineers in management of average of 40 to 50 projects of $130,000,000 of construction per year, including reservoirs, pump stations, piping distribution, and replacement and repair of groundwater wells and other distribution system appurtenances.
- Handled asset management responsibilities, including system accounting, condition assessment, financial assessment, social impact assessment, and replacement planning of distribution facilities having present value worth of up to $1,800,000,000.
- Served as staff engineer of $360,000,000 project. Evaluated submittals and provision of change order estimates.
- Developed valve vaults program for 15-year repair and replacement.
- Produced risk standard operation procedure for risk value assignment of water distribution lines in system.
- Managed inclusion and development of software program and system called Care-W, collectively analyzing distribution pipe system on global to individual pipe criterion basis.
0-5 years of experience
Supervised the civil engineering electrical distribution group (3 employees) responsible for supporting an annual
construction budget of $40 million.
- Led the structural engineering design process through technical guidance, continuous review, and work planning.
- Negotiated a contract addendum between [company name] and another company that greatly improved contract
- Project leader responsible for the development and implementation of new processes aimed to streamline
6-10 years of experience
Monitored the preparation process of contract documents for various projects to meet the budget allocated for county projects during the pertinent fiscal year.
- Hired consultant to prepare the design and specifications of projects and short listed contractors that qualify for project execution.
- Supervised project team assigned to prepare contract administration packages and cost estimates.
- Interfaced with the board of supervisors in order to meet the improvements needs of various districts.
- Oversaw contract awarding process, led pre-bid meetings and construction progress meetings, reviewed and approved shop drawings, material submittals, and payment certificates.
- Member of county development committee that looked over the proposed residential and commercial projects in the county to ensure compliance with code requirements.
10+ years of experience
Led and facilitated multiple projects that required in site design, work plan development, data collection and analysis and preparation of technical memoranda, reports and presentation for practices such as: storm water management, storm drainage design, sediment control design, flood plain studies, water & sewer facilities design, roadway improvement plans and low impact development plans. Maximized project productivity by using AutoCAD for design aggregation and documentation, connecting and streamlining design and documentation workflows. Ensured project compliance with local, state and federal water programs, water programs’ regulations.
- The Tech Group: Supervised the entire implementation lifecycle of the Russet Urban Development Project for residential homes. Activities included the design of storm drainage, storm water management, soil erosion and sediment control, earth work estimating, quantity take off for storm drainage, water, sewer and roads. Applied hydrology software such as TR-20 and TR-55 analysis to storm water management facilities plan. Leveraged HEC-RAS to create flood plain studies. Authored Maryland State Highway Road Improvement plans. Served as overseer at construction site to ensure all best practices and design work was being observed and followed.
- Ben Dyer Associates: Designed storm drainage and sanitary sewer improvements, storm water management, street and highway systems, sediment and soil erosion control for multi million dollar initiatives such as Fairwood and Fort Dupont residential home development, Safeway Distribution Center, Sunnybrook Properties. Authored the model of a Storm Water Management system using the TR-20 and TR-55 application for modeling storm water runoff, routing, ponds, and hydraulics. Leveraged HEC II program’s input data files and hydraulics analysis to perform channel flow analysis and flood plain studies. Conformed projects to comply with federal, state and local regulations such as Maryland Erosion and Sediment Control Law and The Maryland Storm Water Management Law of 2000 by actively preparing sediment control plans using State approved procedures and innovative design techniques. Trained and managed junior level staff on industry wide best practices and to provide on-going support as subject matter expert.
- MK Enterprises: Managed preliminary sketch to final plans of Glenn Estates Residential Project encompassing the design of storm water drainage, soil erosion and sediment control, roads and profiles, storm water management facilities, feasibility studies, earth work estimating and quantity take-off for storm drainage, water, sewer and roads. Applied hydrology software such as TR-20 and TR-55 analysis to storm water management facilities plan. Utilized HEC-II application to create flood plain modeling and studies. Performed project management duties including scope management, time management and cost management.
- Dewberry & Davis: Managed preliminary sketch to final plans of Glenn Estates Residential Project encompassing the design of storm water drainage, soil erosion and sediment control, roads and profiles, storm water management facilities, feasibility studies, earth work estimating and quantity take-off for storm drainage, water, sewer and roads. Applied hydrology software such as TR-20 and TR-55 analysis to storm water management facilities plan. Utilized HEC-II application to create flood plain modeling and studies. Performed project management duties including scope management, time management and cost management.
10+ years of experience
Performed as Project Engineer and Project Manager for a variety of public and private civil design projects. Technical expert with roadway/site geometry, grading and storm/sanitary sewers.
- Worked in a fast paced, multi-project environment. Performed well on small projects with marginal budgets and schedules. Excelled at plans, specifications and estimates.
- Commercial site development experience includes private projects such as quarries, asphalt plants, office buildings, bus terminals and parking lots.
- Provided project engineering and construction engineering for Salishan, one of the largest residential development projects in Tacoma. This project was successful in all areas, including budget, schedule, owner satisfaction and aesthetics.
- Utilized AutoCAD, LDT, Civil 3D and MicroStation and teamed with technicians to create terrific plans. Implemented CAD technics to improve quality assurance and team work.
- Technical field of expertise includes roadway and site geometrics, storm and sanitary sewer design, traffic signing and channelization.
- Employee of the year in the Bremerton Office, 2008.
0-5 years of experience
Facilities engineer supporting variety of engineering functions.
- Construction project manager / inspector for the $4.3-million Taxiway A Rehabilitation at Eagle County Regional Airport, Gypsum, Colorado. Project involved milling and paving of over 8,000 feet of taxiway and connectors, installation of taxiway lighting, and drainage improvements. All work was accomplished while safely maintaining an active runway.
- Performed numerous geotechnical investigations and drafted reports on findings.
- Conducted facilities assessment of Air Force munitions storage facilities in Arizona, Virginia, Guam, Korea and Japan.
- Prepared numerous proposals in response to RFP’s.
6-10 years of experience
Performed static or dynamic SDOF analysis on steel, reinforced CMU, concrete, and wood structures under
ATFP blast loads resulting in more efficient structural material use.
- Calculated concrete, and steel connections in accordance with ACI318 and AISC LRFD design
- Determined quantity-distance siting for explosive processing plants leading to an efficient and safety- oriented siting of facilities.
- Familiar with construction plans and shop drawings to set up analysis and calculations.
- Generated project basis of design documents, edited specifications, and prepared reports for project
- Assisted architects and contractors in DoD Military Construction siting and blast-resistant design to meet
- Made front-end interactions with clients directly on self-managed ATFP projects through in-person
- Participated in construction support including determining solutions to unplanned construction obstacles
0-5 years of experience
Worked with CONSOL permitting personnel and consultant staffing to develop plans necessary for environmental permitting and site construction
- Evaluate proposed sites for constructability and review active work sites to ensure work is being performed to specifications
- Assess on-site construction monitoring to verify that subgrade is suitable and that proper construction techniques are followed for engineered fill and desired compaction is achieved
- Review public roads proposed for use as access to site locations and determine appropriate scope of work to conduct operations
- Worked with various Business Units across the Enterprise to standardize pad design and reduce costs
- Implemented reporting and documentation system for construction related activities to track budget and progress
0-5 years of experience
Planned water and sewer infrastructure for Rosamond Community Services District, Quartz Hill Water District, East Niles Community Services District, and Mammoth County Water District. Projects required that I work with developers, developer’s engineers, landowners, District Attorneys, Kern Country personnel, and the District personnel. Used improvement standards to design approximately 84,000 feet of water lines, 74,000 feet of sewer lines, and 40,000 feet of reclaimed water lines. Located and sized water storage tanks, water pressure zones, pressure reducing stations, turnouts, hydro-pneumatic systems, and sewer lift stations.
- Performed Assessment District Engineering for Rosamond Community Services District (RCSD 1, 2, and 3), East Niles Water District (ENWD 2), and Mammoth County Water District (MCWD 1). Municipal bond projects ranged from $5 to $30 million.
- Presented findings of RCSD Assessment Districts 2 and 3 at community meeting.
- Prepared water, sewer and drainage preliminary and final plans, and specifications and cost estimates.
- Performed project planning, budgeting, economic analysis and business development.
- Performed parcel map, boundary map, and tract map preparation and checking.
0-5 years of experience
Developed contract documents for municipal utility improvement projects, revised contract drawings, prepared technical specifications and construction cost estimates
- Developed master front end specification for municipal projects
- Performed field review for verification of existing conditions and as-built plans
- Conducted bid reviews and prepared award recommendations
- Participated in proposal preparation and other business development activities. Secured in new business
0-5 years of experience
- Served as technical staff to Regional Transportation, Planning, and Parks and Recreation Commissions. Prepared reports and made numerous public presentations. Supervised five people and assisted with budget preparation.
- Prepared comprehensive reports and conducted public workshops for roadway maintenance and CIP financing culminating in major public policy changes and new transportation revenue sources totaling $1 million per year.
- Project Manager for parks and transportation 5-year CIPs, and for $700,000 per year erosion control CIP at Lake Tahoe. Procured and managed consultants and contractors, and initiated and developed comprehensive construction contract documents.
- Performed technical drainage reviews and served as technical support to comply with FEMA requirements to maintain good standing in National Flood Insurance Program (NFIP). Prepared comprehensive reports and conducted public workshops to facilitate creation of county-wide flood control district.
- Conducted technical reviews of construction plans, reports, and studies prepared by consulting engineers.
0-5 years of experience
Estimated fees, determined scope of work, prepared proposals and contracts on multiple projects
- Managed projects through EPCM. Managed clients’ budgets, scheduling and programs. Coordinated work efforts and reviewed work performed
- Prepared plans, profiles, earthwork, grading plans, specifications, and cost estimates of large infrastructure projects following design standard specifications.
- Performed design of interchange structures using CADD.
0-5 years of experience
Provided oversight for all major projects, specifically analyzing project costs and finances.
- Approved or denied project requests based on a set of personally developed criterion.
- Engaged in collaborative problem solving to overcome financial obstacles.
- Processed accounts payable and receivable for a multifaceted project worth $120 Million. Did the Bill of Materials ($4-7 Million each Month) for constructions
0-5 years of experience
- Sr. Civil Engineer responsible for establishing construction management and project management (CM/PM) presence in Colorado and North Dakota resulting in eight contract wins with federal agencies and revenues up to $900K.
- Project Management of federal, architectural, transportation, buildings, and infrastructure design and construction projects.
- Project Management and QA/QC plan review of civil site designs for parking area pavements and drainage designs.
- Increased company’s recognition and developed, matured, and maintained relationships with potential teaming partners.
0-5 years of experience
- Responsible for the review of site development and subdivision plans.
- Designed a 52-lot subdivision for Habitat for Humanity.
- Assisted with the management of the city’s building construction program.
- Designed water and sewer utility plans, roadway plans, and grading plans.
- Provided specifications, estimates, and engineering information to the public and contractors.
- Assisted in the supervision of the Engineering Division’s field operations, which included the construction of water and sewer lines, streets, and subdivisions. Coordinated and negotiated with contractors and developers.
- Directed and reviewed the work of assigned technical staff in the preparation of field notes, maps, and plans.
- Responsible for the City of Winston-Salem’s A.D.A. wheelchair ramp and sidewalk construction
0-5 years of experience
- Managed design site plan efforts in commercial and residential developments, including, grading plans, sediment and erosion control, utility layouts, and landscape plans
- Leveraged Land Desk Top to efficiently design projects to construct profiles, create contours and streamline drafting process
- Applied for civil engineering design patent
- Designed commercial, residential and roads by NCDOT standards
6-10 years of experience
Designed projects from conceptual to final development on transportation projects, landfill closures, municipal and site development.
- Relocated and designed underground utilities to the most efficient and best possible route.
- Designed of grading including earthwork analysis, utilities design, drainage and storm water management for water quality on multi-used sports park, parking lots, parking structure and site development.
- Widening of roadway that included geometric layout, design speed, sight distances and setting of grade elevations
- Prepared cost estimates and specifications.
- Prepared construction documents from conceptual to final phase and to assure the projects meet the design standards.
0-5 years of experience
- Responsible for the requisition of materials and the design of national water and sanitary sewer systems, residential subdivisions, municipal streets, and stormwater systems.
- Oversaw the general administration of the Engineering Division, preparing and maintaining the Division’s various annual reports and records and training and evaluating its members of staff.
- Managed the coordination of meetings with utilities representatives for work certain designs.
0-5 years of experience
- Senior Professional Engineer with a 20 person engineering consulting firm.
- Project management duties included construction bidding, coordination of construction activities, contract management, and complete regulatory coordination with federal, state, and local agencies.
- Designed and managed construction of residential and commercial sewage disposal systems.
- Designed community water supply systems, commercial site plans, municipal landfill closure plans and municipal recreation area plans.
0-5 years of experience
Prepare and submit temporary facilities drawings for submission to local authorities.
- Assist in obtaining soil investigation subcontract etc.
- General liaison with local authorities, prepare permitting project schedule.
- Design overall plant drainage.
- Prepare underground and grading drawings.
- Oversee the cross country pipeline works.
- Oversee the construction of product tanks at Kuantan Port
- Seconded to Technip Petro, ROME Italy for 3 months for conceptual design stage.
6-10 years of experience
Resident engineer for District capital improvement projects, including a solar panel installation and a boarding system improvement project at three District-owned ferry terminals.
- Create AutoCAD working drawings, calculations and specifications for District bid packages.
- Active participant in the physical biennial steel inspection of the Golden Gate Bridge.
- Participated in panel interviews to select professional engineering design teams.
0-5 years of experience
- Supervise staff engineers and technicians, provide expertise and guidance.
- Communicate with customers, create project proposals, schedule all drilling work, provide testing summaries, execute reports.
- Provide design recommendations for both shallow and deep foundations.
- Perform engineering field inspections.
- Oversee Standard Penetration Test (SPT) borings and percolation tests.
- Review, sign, and seal concrete sampling, soil compaction, and environmental reports.
0-5 years of experience
Provide Engineering and Construction Management Consulting Services to U.S. State Department International Narcotics and Law Enforcement (INL) for the renovation, planning and construction of Correctional Facilities.
- Perform review of Construction Documents.
- Provide detail design services for utilities, site and structures.
- Produce scope of work for proposed projects.
- Provide QA/QC oversight on 27 m project.
- Attend and chair Project meetings with relevant parties.
0-5 years of experience
Provide Engineering and Construction Management Consulting Services to U.S. State Department International Narcotics and Law Enforcement (INL) for the renovation, planning and construction of Correctional Facilities.
- Perform review of Construction Documents.
- Provide detail design services for utilities, site and structures.
- Produce scope of work for proposed projects.
- Provide QA/QC oversight on 27 m project.
- Attend and chair Project meetings with relevant parties.
0-5 years of experience
Managing the delivery of civil engineering projects and commissions to ensure
completion within budget, on or ahead of time and to meet quality objectives.
- Design engineer and project manager for the detailed design of sewerage
- Preparation of project reports (feasibility and detailed design reports), carrying out design review and value engineering workshops with clients.
- Leading business development through preparing tenders. This includes responses to public and private tenders, bid and project team set up, bid pricing and risk
- Client project management through secondment to client offices to administer civil
0-5 years of experience
- [company name] subcontracted to US Army Corps of Engineers
- Senior field representative on over $180M MILCON construction project at Fort Bragg, NC
- Army Construction Team Leader representing the Army’s interest. Act as liaison between construction, inspection, contracting and Fort Bragg Public Works organizations
- Interpret drawings and specifications to optimize the construction of new facilities
0-5 years of experience
Provide Engineering and Construction Management Consulting Services to U.S. State Department International Narcotics and Law Enforcement (INL) for the renovation, planning and construction of Correctional Facilities.
- Perform review of Construction Documents.
- Provide detail design services for utilities, site and structures.
- Produce scope of work for proposed projects.
- Provide QA/QC oversight.
- Attend and chair Project meetings with relevant parties.
0-5 years of experience
Prepared Stage II Bridge Scour Reports.
- Reports included the abutments and piers scour calculations to improve bridges.
- Highway design, grading, profiles, drainage, utilities relocation, quantity calculation and cost estimation.
- Prepared NJDEP permits applications and documents for storm water, waterfront development, wetlands, and Pinelands Commission permits.
0-5 years of experience
Responsible for all surface engineering design and maintenance.
- Responsible for a 10 man yard crew
- Designed haul roads and portal pads for 2 new underground mines.
- Designed 50-unit man-camp with utilities.
- Responsible for water evaporation and tailings deposition.