- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Electrical Engineering Resume Samples
Component Engineer Resume Samples
No results found
0-5 years of experience
Collected and formulated the engine dynamometer data from test cell in ATI vision to determine the cause of low oil pressure problem in 13L engines
- Assisted a cost improvement project to propose new powdered metal oil plug for the oil filter housing and engine block that will save estimated $450,000 globally per annum
- Worked on the oil pan flatness issue for 11L engine
- Analyzed the acceptable torque values for the engine coolant pipe clamps after the 20 min hot test
- Determined the root cause of the flaking of coating layer on the roller pins of the intake rocker arms
- Participated in the competitors’ engine assembly analyses with the team
0-5 years of experience
Responsible for review and specification generation of substitute parts to support production requirements.
- Developed procurement system for transistor availability in scarce market resulting in 10% reduction in system redesign modifications.
- Initiated search and finalized contract for chrome platter resulting in a cost savings of 36% annually.
- Created component databases vs. preferred vendors for purposes of evaluating potential suppliers/parts to support new lines introduced by company.
0-5 years of experience
Responsible for quality and reliability of DRAM products, performed electrical tests on bench and high-speed tester, tracked failure mechanisms and collaborated with multiple engineering teams, generated 8D failure reports to customers.
- Managed multiple priorities and deadlines while frequently meeting completion goals of 90% or higher.
- Drove investigation as sole contributor to find root-cause on Microsoft Surface Pro failures. Defect identification ensured major client satisfaction and protected company from product return and future orders valued at
- Demonstrated attention to detail by having the fewest errors in a year and a half audit of failure tracking data.
- Performed detailed component analysis using oscilloscope, X-Ray, curve-tracer, and analyzed CSAM and SEM images.
6-10 years of experience
Evaluated and qualified logic devices for use in Intel Systems products using performance and reliability data.
- Developed test software and the hardware interface used for device characterization on ATE.
- Generated life test data as part of a DRAM qualification plan.
- Wrote component specifications for ASIC devices used to replace end of life components designed into Intel System products.
- Supervised two engineering technicians and wrote performance reviews.
- Participated as a team member on new product teams contributing component related information and qualification status.
0-5 years of experience
Responsible for the procurement process of new components and End of Life replacements.
- Researched and obtained sample components from vendors. Coordinated testing and qualification of new components with Engineering.
- Maintained project plans for management review with a strong emphasis on cost and product forecasts.
- Reviewed End of Life notices; researched, obtained and coordinated qualifications of replacement components.
- Developed innovative solutions to purchase product components as an offset for product cost increases due to technology shifts and volume reductions. Resulted in a 3.33% product cost savings.
- Key member of implementation team that accelerated the qualification of (3000+) ROHS compliant components one year ahead of a two year budget.
0-5 years of experience
Worked within the Procurement & Component Technology Department to evaluate component quality, maturity, availability, development and trends of connectors, connector accessories, cables, cable assemblies and fiber optics.
- Identified and resolved problems for Ericsson’s Purchasing, Production, Warehouses, Planning and Design departments.
- Recommended components for designers.
- Revised and created instructions and specifications for components, according to Ericsson standards, using AutoCAD, Visio, Frame maker and MS Office.
- Requested quotes, proposal evaluation, price determination and negotiation.
- Worked with Purchasing to evaluate strategies and component costs and participated in negotiations with suppliers.
- Work within the AG2 industry group (Swedish equivalent of SAE).
- Qualified manufacturers and components.
6-10 years of experience
Responsible for qualifying suppliers to manufacture headers, lead terminals, torque wrenches, and other injection molded components.
- Developed 2 new header suppliers. Defined process development requirements, validation requirements, and developed qualifications. Created Mechanical Design Verification Testing (MDVT) for the FDA submission. This project resulted in a 2 million dollar cost savings per year.
- Completed first Aurora qualifications for IS4 Lead Terminal and Headers.
- Worked with a procurement analyst to develop a supply chain strategy for injection molded components.
- Reviewed and coordinated vendor activities to support development, including initiating validation procedures at a supplier.
- Achieved six sigma green belt certification based on RF Header Attach and FM Reduction project results.
- Served as a Field Discrepancy Notice (FDN) Review Board member.
- Completed CRM 1 and CRM 2 (training sessions, which included a week of field training at the Cleveland Clinic.)
6-10 years of experience
Responsible for qualifying suppliers to manufacture headers, lead terminals, torque wrenches, and other injection molded components.
- Developed 2 new header suppliers. Defined process development requirements, validation requirements, and developed qualifications. Created Mechanical Design Verification Testing (MDVT) for the FDA submission. This project resulted in a 2 million dollar cost savings per year.
- Completed first Aurora qualifications for IS4 Lead Terminal and Headers.
- Worked with a procurement analyst to develop a supply chain strategy for injection molded components.
- Reviewed and coordinated vendor activities to support development, including initiating validation procedures at a supplier.
- Achieved six sigma green belt certification based on RF Header Attach and FM Reduction project results.
- Served as a Field Discrepancy Notice (FDN) Review Board member.
- Completed CRM 1 and CRM 2 (training sessions, which included a week of field training at the Cleveland Clinic.)
0-5 years of experience
Worked in the Technical Commodity Management (TCM) organization as the Product Component Engineer for the 7705 Service Aggregation Router (SAR), PacketStar Multiservice Media Gateway, and Multiservice WAN (MSWAN) product lines.
- Ensured all board-level and rack-mount power supplies used by 7705 SAR were future safe for RoHS.
- Served as the IP Division (IPD) Authorized Components List (ACL) Manager.
- Worked with 7705 SAR Maintenance Hardware Engineering to qualify new parts for alternate sourcing, supply chain risk reduction, and cost improvement.
- Ensured that our project BOMs maximized the use of preferred parts and manufacturers, were RoHS-compliant, and followed TCM’s published Strategy Papers (e.g. using preferred technologies).
0-5 years of experience
Directly responsible for the Insulin Inhaler Project for the Reliability Engineering Department.
- Performed Risk Management activities for several new medical device projects (FMECA, FTA).
- Prepared and performed verification and validation test protocols and analysis following FDA regulations (CFR 21 QSR) and guidance documents as well as international standards.
- Coordinated and performed ESS and HALT testing with outside testing vendors and assisted in supplier component verification / validation testing.
- Used SPC techniques to assess and monitor Six-Sigma compliance of supplier components.
- Assisted field service and manufacturing in CAPA activities (failure analysis, corrective and preventative actions) and presented findings and test results to team members and management in MRB meetings.
0-5 years of experience
Reviewed destructive physical analysis (DPA) report per MIL-STD-1580 and component testing data from vendors and testing labs
- Assisted to select space level components for customers 2008
- Verified power burn-in circuits and reviewed read and record data of tested samples.
- Performed forward voltage and reverse current verification of diodes, Zener voltage for Zener diodes, and Beta value and cut-off current of transistors
- Communicated with vendors to solve customer’s claims about electrical failed parts summaries and data
- Created and amended Source Control Drawings (SCDs) and Up-screening test specs
6-10 years of experience
Co-Coordinator for site ISO 9000 Certification (first Control Data US ISO Certification)
- Created procedures and flow charts to define customer requirements based on specifications and verbal instructions for high volume test customers.
- Assured proper testing of customer components and assemblies
- Performed Automatic Test Equipment program enhancements, auditing, failure verification, failure tracking, and test correlation between customers and suppliers
- Qualified memory chips/modules, prepared qualification test plans and life test bias schematics
- Coordinated qualification process between the supplier, designer, qualification laboratory, and failure analysis
0-5 years of experience
- Led troubleshooting efforts to systematically determine root cause, extent of condition, and corrective actions to prevent recurrence
- Executed a breaker replacement project of $1.2M
- Completed technical justifications and functional evaluations relating to circuit breaker operability
- Monitored industry trends to identify vulnerabilities directly related to nuclear safety and reliability
- Performed benchmarking to learn industry best practices and incorporated them into the site program such as increasing the time between circuit breaker overhauls while ensuring reliability
- Served on a recovery team for the cooling tower lift station flooding event who’s mission was to return the towers to service within four days to comply with river temperature limits
0-5 years of experience
Created & Sustained Component database and part numbering system on Agile and Baan (MRP system).
- Resolved & Coordinated all component issues with electrical and mechanical design group, purchasing and suppliers.
- Managed & controlled all board level bill of material (BOM).
- Managed product and process changes and customer PCN release process.
- Defined, managed and approved vendors list (AVL) to meet design & requirements and improves total costs.
- Reduced existing cost and avoid new cost by qualifying alternate suppliers and process.
- Set up Technical Seminar for Solectron NPI group.
6-10 years of experience
Collaborated component selection, sourcing and availability with engineers, purchasing and manufacturing during development phase. Directed up to three in-house test technicians.
- Negotiated best pricing in procuring materials used the manufacture of development products.
- Maintained inventory control for thousands of line items while assembling consignment kits for manufacture.
- Directed implementation and execution of prototype and production test for company’s development products.
- Developed functional test procedures and installed test capability at various contract manufacturers.
0-5 years of experience
Accountable for providing roadmaps with respect to current IC technologies and previous responsibilities at Motorola.
- Provided technical content to internal and external customers.
- Processed all new IC part number requests to verify that they were from an approved source and that the part was not already on the system. Also made suggestions to design engineer use an existing equivalent part.
- Processed supplier Product Change Notifications (PCN) for all ICs and recommended replacement product or Life Time Buy (LTB) to End of Life Team, preventing factory line-down and loss of product flow.
- Processed on averaged 200 to 300 Component Change Notices a month.
- Worked with suppliers such to provide custom power supplies for ATCA based systems meeting requirements and cost to win business.
- Tracked and reported on industry IC trends such as CPUs, memory in support of long-term product plans for business growth.
0-5 years of experience
Converted none compliant components to RoHS/ REACH Lead-Free Compliant components.
- Worked closely with device manufacturers to obtain detailed RoHS material declaration/RoHS CoC and other regulatory documents compliance certifications (UL, CSA, TUV)
- Utilized IPC-1752-2 form to conclude conversion works.
- Reviewed suppliers’ responses to iNEMI Lead-Free soldering process requirements.
- Generated ECO (ECN) to implement changes on Approval Vendor List.
- Reviewed BOMs to identify EOL components. Identified alternate sources for engineering approval.
- Supported contract manufacturing on EOL components due to the discontinuation of non-compliant parts.
0-5 years of experience
Advised product team in the selection of components for new and existing printed circuit board designs
- Supported Preliminary / Critical Design Reviews
- Managed and tracked component delivery at a circuit card manufacturer
- Facilitated failure analysis investigations
- Demonstrated component requirement compliance to customer