0-5 years of experience
Specified control systems and instrumentation for chemical plant expansion.
- Authored ISA specifications for over 600 field and in-line instruments.
- Consulted with clients to evaluate appropriate control schemes and type of instrumentation for proper plant operation and cost effectiveness.
- Evaluated DCS systems and made recommendations to client.
- Coordinated process and mechanical data between company and client.
- Generated loop and I/O diagrams and installation details, and wrote scope of work.
0-5 years of experience
Specified control systems and instrumentation for chemical plant expansion.
- Authored ISA specifications for over 600 field and in-line instruments.
- Consulted with clients to evaluate appropriate control schemes and type of instrumentation for proper plant operation and cost effectiveness.
- Evaluated DCS systems and made recommendations to client.
- Coordinated process and mechanical data between company and client.
- Generated loop and I/O diagrams and installation details, and wrote scope of work.
0-5 years of experience
- Supervised maintenance of equipment installed at Urea & Utilities plant
- Converted field instrumentation of critical securities from single to triple redundancy on power General Electric gas turbines
- Successfully completed a Six Sigma Green Belt Project on Wrench Time Improvement.
0-5 years of experience
- Promoted to task force office to work on international project within four months of joining company
- Collaborated with HR department to organize departments’ vendor meetings and inter departmental activities
- Worked with multicultural teams across three countries to centralize and standardize a new software package
0-5 years of experience
Designed instrument and control circuits and systems for power plant training simulators
- Simulators were built for both nuclear and fossil fuel power plants
- Customers included Duke Energy, Ontario Power Grid and PPL -Components included power supplies, indicators, meters, switches, audio and telecom equipment
- Created a mapping matrix for 8,000 connections between PC I/O (A/D) ports to panel components
- Used the Epicor-Vantage 8.0 ERP system to create a bill-of-materials for each assembly within a job
- Created proprietary part numbers in Epicor to track and purchase all project materials
- Submitted purchase requests and tracked components from purchasing to installation
- Worked with project managers and customers on change orders and problem resolution
- Wrote installation procedures for equipment installation for both shop and site
0-5 years of experience
Execution Field of Instrumentation & Control Engineer
- In charge of all of instrument execution activities at the site in following units: flare, waste water treatment, cooling tower, main control room, interconnection unit (fiber optic cable), Remote instrument building and in gas and steam turbine generation in power plants (GTG &STG).
- Supervised the tested and calibration of all instrument devices and fill ICAPS (QA/QC Total Company) forms.
- Considered invoice, dossier, punch, TQR, shortage of material, remained work, subcontractor daily activities.
- Considered MTO (Material Take Off) and BOM (Bill Of Material).