Responsible for providing engineering design efforts for a variety of projects, both as part of a team and in solo assignments.
- Inspected existing sites both in person and from photographs in anticipation of renovation.
- Created addendums and updated as-built drawings.
- Reviewed and approved construction submittals.
- Used the latest versions of drafting and design software to produce Construction Documents.
- Assisted other team members during the transitions to software upgrades, particularly the transition to MS Office 2007.
- Analyzed data and wrote sections of reports, proposals and specifications.
0-5 years of experience
Initiated capital improvement projects up $100,000 from design to start-up, with attention given to cost-control
- Was involved with design of many power distribution systems plant wide and energy saving improvements
- Supervised and supported electrical personnel in TShoot advanced machinery automation RELAY Ladder Logic using BLUE prints
- Electrical integration, installation supervision/assistance and technical problem diagnosis of Multi-Axis CNC Machinery
- Independently designed small machine processes from Mechanical Engineering Department specifications(SOP)
- Utilized National Electrical Code installation and electrical safety methods in Articles 100-900
6-10 years of experience
Equipment start-up in facilities across the world: Included initial de-bug, productivity enhancements for rate and operator usability, engineer/technician/electrician training and ongoing support for any future issues.
- Designed and installed Cooper specific equipment in their manufacturing plants.
- Worked closely with equipment manufacturers to ensure adherence to standards and timely delivery.
- Designed and implemented servo control code for automated sort and retrieve gantry system ($100 million project).
- Initiated and completed productivity and scrap reduction projects.
- 24/7 responsibility for maintenance and trouble-shooting of various pieces of equipment throughout the plant (same equipment listed above).
6-10 years of experience
Served as team leader for all internal and external electronic design.
- Designed speed/torque control for three phase brushless motors for pump drives.
- Designed and implemented custom automatic and semi-automatic test equipment for servovalves, including digitally controlled power supplies and data acquisition systems.
- Developed electronic closed loop pressure control allowing for continuous servovalve testing reducing throughput by 50%.
0-5 years of experience
Served as Lead Electrical Engineer on Robotic Viper Fiber Placement System project.
- Assisted in day to day project management as it pertained to Robotic Viper.
- Managed Panel Layout/Assembly design and assisted with component selection.
- Designed cable entry/routing system for the Robotic Viper power panel, which included some mechanical assembly – plate design/knockout specifics.
- Utilized SAP for material and document creation, tracking machine bill of materials, and project time entry.
- Processed vendor quotes and created necessary documentation to facilitate Purchase Order issuance.
- Completed push button box design for a 5 plank platform system option that required machine C axis manipulation, remotely mounted on platform railing.
6-10 years of experience
Performed multi-discipline project management from project conception to completion. Performed variety of complex electrical engineering functions including controls design and system integration.
- Managed projects involving group of engineers, programmers and outside contractors.
- Developed project documentation including equipment layout and specifications, cost estimates, FAT SAT, P &IDs and schematic diagrams.
- Reviewed specifications and plans for accuracy during bidding and construction process.
- Supervised and guided the execution of custom engineered orders in a UL 508A panel fabrication shop to insure product conformity to customer and industry standards.
- Graphical user interface development and logic design for large water and wastewater treatment applications.
0-5 years of experience
Headed the electrical portion of a major redesign project, changed almost all of the electrical E-Box design and components for a significant cost savings, and added many features not available to previous models.
- Implemented lower cost machinery with additional features.
- Developed upgrade kits for machines in the field to give them better functionality.
- Debugged equipment in the field and solved customer issues through software and wiring changes.
- Created electrical schematics for new projects and updated schematic revisions using ACAD Electrical 2007 utilizing ECN process.
0-5 years of experience
Lead Electrical Project Engineer responsible for establishing design criteria for construction, developing scope of work, execution plans, and operational testing procedures for electrical and communication systems, ensuring design and installations standards aligned with customer requirements
- Prepared Engineering Change Notices for design modifications, evaluated vendor proposals, and prepared purchase requisitions for new equipment
- Actively participated in construction review meetings with Naval officials, ensuring that design changes and installations adhered to contractual requirements
- Worked closely with Naval government stakeholders conducting electrical equipment failure analyses on power distribution, internal communication, and lighting systems
0-5 years of experience
Responsible for all aspects of procurement of electrical materials for several, multimillion dollar, government funded, industrial construction contracts.
- Solicited offers and reviewed quotations for accuracy, negotiated and issued purchase orders ranging in value from hundreds of dollars to hundreds of thousands of dollars.
- Received and reviewed submittal data from suppliers and manufacturers to ensure complete compliance with all contract documents.
- Prepared submittal data for government for approval.
- Monitored fabrication process to ensure timely delivery in order to meet established ship dates.
0-5 years of experience
Served as a liaison between vendor, manufacturer and customer to meet component and deadline requirements
- Participated in change control meetings and applied proper documentation procedures
- Procured parts and developed a bill of materials for prototype designs
- Managed electrical designs of overhead vehicle systems
- Collaborate with team members in assembling projects
- Provided electrical support for testing seat harnesses
- Assisted with the design of prototype components for future vehicles
- Solder printed circuit boards for development
6-10 years of experience
Designed, developed, and optimized manufacturing and supporting processes to achieve unit objectives
- Developed knowledge and skills to be recognized for application of engineering principles and/or scientific analysis
- Defined and solved problems/opportunities to achieve unit objectives
- Performed assigned projects/tasks to meet unit objectives within applicable Corporate policies
- Using Lean principles to solve problems to root cause
0-5 years of experience
Managed coordination of all phases of assigned electrical/instrumentation projects from planning through implementation of Maximo Configuration;
- Worked closely with design managers, construction managers, consultants/contractors and governmental agencies.
- Managed resource allocation throughout the project life cycle with clear and concise direction in an efficient and cost-effective manner.
- Monitored and managed the costs of all internal and external resource work activities to complete the established capital project.
- Reviewed P&ID, loops, controls and electrical plans and specifications during all Maximo configuration phases, offering advice regarding systems operating locations, equipment hierarchies job Plans, PM’s, and Routes.
- Served as primary point of contact procurement, construction management, consultants, contractors and special vendors with direct report responsibility for assigned projects.
- Conferred with management to review achievements and discuss required adjustments to improve performance and efficiency.
- Conferred with management to coordinate the provision of management information services, estimating and operations support, and project controls to satisfy the needs of the project.
0-5 years of experience
- Managed, designed, and implemented energy projects from start to finish in an industrial setting
- Reduced yearly energy consumption by $50,000+ through increased energy efficiency
- Worked closely with contractors, management, and fellow engineers to complete projects in timely manner
6-10 years of experience
Managed teams of contractors and in-house technicians to perform preventative and corrective maintenance on all power distribution components, including High Voltage (13.8kV) switchgear and transformers. Specifically, reduced plant shutdown requirements from 18 months to two years as well as reduced the outage time from 18 hours to 12 hours, effectively reducing the plant maintenance costs by $75K/annum and increased production availability.
- Performed duties as an integral part of an industrial project management team for five plant sites, successfully completing numerous projects ranging from $25K to $30M in budget. These projects range from individual machines to the specification and installation of high voltage distribution components.
- Individually responsible for the programming and improvement of five scrap aluminum furnace lines, the proprietary design of which allows operation without additional exhaust treatment such as bag-houses or lime injection.
- Participated in a multi-discipline group to enact program changes to various machines in order to reduce idle running times of support equipment, thus saving energy costs and extending machinery life.
- Designed specific control routines to allow fine movement controls over wide range positioning equipment.
- Managed several different integration groups, on several different projects simultaneously, to complete both mechanical and electrical based upgrades on used equipment at a total cost of less than half of machinery quoted new.
0-5 years of experience
Analyzed and designed power distribution systems for new and existing facilities. Designed, programmed, and provided
troubleshooting support for production machines and conveyor systems.
- Created electrical construction drawings and control panel schematics for new manufacturing facilities.
- Managed purchasing and shipping of electrical components.
- Aligned company’s power distribution design standard with the National Electric Code.
- Designed and tested machine prototypes.
0-5 years of experience
- Designed manual and automated test equipment for motors, motor controllers, rotary and linear actuators, and position sensors to measure RPM, position, temperature, load, voltage and current.
- Established test procedures based on specifications submitted by the client for environmental, qualification and life testing.
- Analyzed test results to comply with standards and reported findings to clients.
- Instructed and trained technicians to modify equipment procedures.
- Estimated test equipment, labor and overhead costs to generate new contracts.
- Utilized OrCAD, PSpice, and various Electrical engineering concepts to perform circuit analysis
- Demonstrated the ability to analyze data, create presentations and execute on strategic plans.
6-10 years of experience
Accountable for all aspects of manufacturing plant electrical distribution systems, lighting and control design including project engineering labor estimates and schedule development. Directed designers and draftsmen in the production of construction drawings. Created specifications, bills of materials and performed all necessary electrical calculations. Reviewed and compared equipment vendor’s quotations for bid comparison.
- Created a business proposal to purchase a personal computer for the electrical engineering group which was accepted
- Developed engineering software and databases to aid in design tasks
- Converted specifications and bills of materials to word processor format
- Developed standards and libraries for CAD system
- Assigned to head almost all prototype projects within this time period
0-5 years of experience
Worked on washer & dryer electronic controls Product Cost Take Out (PCTO) projects.
- Worked on multiple projects. Worked with all project phases from conception, design, and pilot production through production.
- Duties included scheduling all phases of the project from start to finish. Worked with suppliers & vendors defining project scope, objectives, changes and required testing.
- Conducted & scheduled quality and reliability testing, collected test data and worked with engineers, suppliers and vendors with testing issues.
- Work with hardware and software engineers making changes and addressing issues.
- Conducted Electrical and Technical Review presentations for the different phases of the project.
- Used Design For Reliability (DFR) and Design For Six Sigma (DFSS) tools.
0-5 years of experience
Provided engineering expertise in the areas of plant automation (DCS System), capital projects, budget
estimates, installations and commissioning.
- Specified equipment and evaluated technical proposals.
- Provided technical support in the areas of PLC, electrical machines, instrumentation, gas continuous emissions
- Set policies and procedures for energy management goals and objectives.
- Implemented Energy management programs, track energy consumption.
0-5 years of experience
Responsible for all Electrical installation inspection of a 150MW co-gen power plant.
- Scheduled outages for electrical construction.
- Responsible for all electrical testing and turnovers.
- Oversaw Instrumentation and Electrical startup and commissioning.
- Oversight of Powerhouse equipment startup and commissioning such as air compressors, filtration skids, sample systems, RO and Demineralization equipment.
0-5 years of experience
Interfaced with clients, construction managers, vendors, engineering design teams, and agencies and established effective design parameters and goals.
- Designed the physical arrangement and layouts of substation and wind farm devices, components, and equipment.
- Designed and prepared electrical substation control schematics and wiring diagrams for utility and wind power projects.
- Analyzed and reviewed shop drawings submittal by vendors for approval.
- Developed and prepared project scope and budgets.
- Selected vendors for equipment and material supply and prepared purchase order for substation materials and equipment for utility and wind power projects.
- Prepared cost estimates and proposal justification data for a given project.
- Diligently worked with material and equipment vendors to expedite delivery.
- Prepared and maintained substation equipment specifications.
- Provided field support to construction technicians and contractors and conducted on site inspection on an ongoing project.
0-5 years of experience
Coordinated and planned Electrical aspects of construction.
- Conducted preventive maintenance on electrical systems and daily safety walkthroughs of job site.
- Created schedule and maintained detailed daily reports in order to better communicate with client during business meetings.
- Prepared equipment acquisition contracts
- Coordinated vendors and testing of all Electrical equipment and Machines to be sold off to client as part of buy off process.
- Purchased all equipment and material needed to complete project on time.
- Oversaw the hiring and termination process of every individual in Electrical Department.
- Maintained open lines of communication with client and gave daily reports of completed work.
- Managed Change Order Logs and all R.F.I request to give the client a better picture of addition construction costs.
- Collaborated with teams in manufacturing location preparation.
0-5 years of experience
- Developed and modified models on Matlab/Simulink to increase efficiency of wind turbine
- Represented company while accompanying Canadian engineers on trip to transfer patent
- Performed wind power technology documents translation from English to Chinese
0-5 years of experience
- Developed hardware schematics and PLC logic for belt and roller type conveyor systems.
- Provided on-site installation, coordination, programming, debug, training, and validation.
- Provided manpower, utility connection and material estimates for new/reworked systems.
- Coordinated and reviewed contractors’ installation schedules and progress reports
- Provided engineering services for Meijers, Ames, Tamco, Publix, and Kmart.
0-5 years of experience
Prepare BID packages for major components such as control panel to be used on Pasteurizer and Bottle Washer Machines.
- Prepare bills of material for all electrical equipment.
- Develop electrical schematics using ACAD.
- Develop Hardware configuration for Bottle Washer and Pasteurizer machine using Allen Bradley or Siemens PLC.
- Rockwell Automation Software programming (RSlogix 5, RSlogix 5000)
- Simatic Software Programming Step 7.
- General electrical consultant for the washer and pasteurizer machines.
10+ years of experience
Designed heating elements, console assemblies, control panels, power controllers and power supplies.
- Select components and vendors to meet performance specifications.
- Supervised manufacturing technicians during the assembly process.
- Determined test procedures to validate conformance to specifications and supervised test technicians during qualification.
0-5 years of experience
Supervised standard electrical design across all product lines. Created cost saving measures with modular control architecture capable for use across all product lines resulting in the use of standard parts and programming. Interpreted customer specification meeting customers’ requirements for assigned projects. Developed highly detailed control design plans including schematics, loop diagrams, I/O lists, bill of materials, wiring loop diagrams, control panel designs, system network and wiring diagrams. Knowledge of NFPA 70 & 79 and UL508. Troubleshoot projects during startup with field service either on site or by remote communications.
- Established proactive communications with customer early on with project.
- Thorough examination of project specifications, working with sales and project management in order to complete profitable products on time.
- Exploring new technologies in order to lower cost or to meet/exceed project requirements.
- Working with management on improving product lines resulting lean manufacturing techniques, ease of installation and commissioning of product.
0-5 years of experience
Electrical and Fire Alarm system design of commercial building projects, including electrical infrastructure and power distribution in a variety of major renovation and new construction projects in both AutoCAD and Revit.
- Interacting directly with clients in order to achieve project goals.
- Responsible for facilitating coordination across multiple disciplines including the architectural design team, structural, mechanical and plumbing engineers.
- Perform construction administration duties including post construction inspection and documentation to satisfy client requirements.
- Work as a reliable and responsible team player, especially when needing to meet tight deadlines and urgent client needs.
- Event Committee member in charge of coming up with and running team building events.
0-5 years of experience
Electrical Project Engineer at [company name] responsible for designing, programming, troubleshooting, quoting and overseeing production of mining electrical distribution power and control equipment.
- Engineer responsible for power design ranging from 208V to 21,600V and all associated control systems.
- In charge of creating all schematic and wire production drawings and bill of materials.
- Lead programmer of protection relays, Allen Bradley Platform PLC’s and HMI’s.
- In charge of start up support and troubleshooting for: Longwall Systems, Section Power Centers, Inby/Outby Equipment, Switchhouses, Switchgear, and Load Centers.
- Customer’s primary contact for troubleshooting of existing electrical systems and engineering consultation of future systems and upgrades
- Underground start-up of power and control systems.
- Customer Inspection and Quoting responsibilities.
0-5 years of experience
Tasked with the Taweelah Phase B turnkey project in a 720 MW Power and MIGPD desalination plant.
- Supervised and distributed daily assignments to a workforce of thirty technicians
- Carried-out the appointing activities of routing and termination of power, control, and signaling cables in the boiler and turbine hall
- Commissioned control cubicles, including power supply circuits and closed loop tests
0-5 years of experience
Primary Project Electrical Engineer for high-speed aerosol can line installation, used new and updated concepts to integrate VFD, PLC, and HMIs into the design, and oversaw installation and startup of line.
- Responsible for all electrical design and installation from incoming power distribution to instrumentation and controls, Insure that all UL, CUL, CSA, CE, IEEE, OSHA, ANSI, and BALL requirements are meet and documented.
- Improving customer satisfaction, by meeting expectations and request obtained input from customer established relationship with plant employees to develop trust and rapport to better serve and resolve their concerns and needs and to reduce production downtime.
- Use problem-solving methods to quickly and logically assess problems and develop a solution. Probe all sources external and internal for answers and best solution and presented management with honest objective answers.
0-5 years of experience
Prepare all the documents required for the critical systems maintenance shut down, including the MOP
- Help in perform design calculations such as lighting, feeders, and service sizing for different projects.
- Testing and maintenance for the critical systems components, including UPS Systems, Foundation Power Centers, Automatic Static Transfer switches, Automatic Transfer Switches, Emergency Generators and Emergency paralleling Switch Gear.
- Testing using secondary injections test, Transformer turns ratio, insulation resistance test, contact resistance test
- Emergency response for clients locally or in different stats
0-5 years of experience
- Design and drafting of power and distribution systems, lighting interior and exterior, and list of materials.
- Create and assembly layouts drawings using Autocad Software.
- Coordinated with vendors, sales reps and machine shops for aid in project completion.
- Technical assistance in field and desk, controlling all the montage process. Identified and solved electrical design problems, resulting in more efficient and cost effective projects.
0-5 years of experience
- Led the electrical software design and hardware layout of pneumatic conveying systems, providing oversight for electrical schematics and content guidance on system manuals and quality control/testing procedures.
- Managed Dynamic Air client relationships from acquisition to on-going support services and provided on-site installation and repair of electrical equipment including customized programming requests of Allen Bradley, Siemens, GE Fanuc, etc.
- Specialized in the incorporation and integration of mechanical and electrical systems, including new product development, and created pricing strategies to competitively and profitably launch new products to consumers.
0-5 years of experience
Technically support Program Management on targeted, launching and shipping business. Have an in depth, hands-on
technical knowledge in EE Hardware, SW and CAN/LIN communications.
- Obtain and support team with customer and Gentex requirements documentation, including translations as needed.
- Make sure new designs utilize parts, methods, and practices, which are practical and realistic in actual production.
- Obtain cost summaries and work with Gentex financial departments to develop selling price recommendations.
- Work with internal departments, customers, and sales department to assure test completion for production release.
0-5 years of experience
Accomplish designs of electrical/controls systems for wood products process machinery and facilities. Establish and manage electrical budget of project, check design documents to ensure all Electrical codes are met: NEC, IEEC, and Weyerhaeuser.
- Responsible for developing work scope, design criteria, cost estimates, budgets and schedules.
- Make design calculations and sketches, conduct analyses and studies as necessary to develop equipment specifications
- Deliver complete and accurate detailed design drawings including cable routing layouts, connection diagrams, termination details, schematics, lighting plans in wood products facility.
- Specify and select PLC systems, MCCs, and control panels. Prepare motor list, I/O lists.
0-5 years of experience
Responsible for electrical design automation, project management and validation. In addition, I was responsible for developing and implementing contingency backup plans for unforeseen production delays and reporting project status to the Design manager.
- Electrical design includes schematic diagram design, electronic circuit design (PCB) and PLC program writing.
- Project management duties include electrical component sourcing and purchasing, and project status follow up, such as wiring and assembly.
- Project validation tasks were comprised of machine test & debug, performance test and on site commissioning.
0-5 years of experience
- Upkeep of the 69kV, 2000 Amp Electrical Distribution Grid as per NEMA code
- Calculations, elementary diagrams, one-line diagrams, specifications, and associated detailed design drawings
- Capital justification for upgrading obsolete systems
- Project leadership for development of scope, project plan, budget, organization, execution and reporting of project
- Coordinating design with intra-departmental personnel including space control, schedule and layout optimization
- Lead Electrical Engineer; Commissioning of a 20MW Biomass Co-generation Power Plant
- Installation of Power Monitor system in the grid
0-5 years of experience
- Lead engineer to design the company most powerful motor of its class.
- Spend two years in manufacturing to perform process improvement and cost reduction
- Conduct seminars on motor design and control to engineers of the company at facilities around the globe.
- 100 million motors released and counting.
0-5 years of experience
Propose, design, specify the electrical and instrumentation systems necessary to operate and maintain industrial wastewater treatment plants.
- Responsible for the electrical/control system compliance to contract and/or customer specifications.
- Prepare single-line drawings, schematics, specifications, and develop equipment functional descriptions as necessary.
- Develop control logic and direct the work of designers in preparing drawings.
0-5 years of experience
Design and implementation of control systems for coil processing equipment. Responsibilities included managing a staff of project engineers and detailers.
- Review specific design requirements with customer (liaison between customer and design team).
- Prepare control specifications, cost of materials, and engineering hour requirement for bid proposals.
- Design the electrical controls and write all PLC and HMI software for the equipment.
- Start-up and debug equipment prior to customer buy-off date and then at customer’s site.
0-5 years of experience
Install, Terminate and Maintain all electrical equipment and switchgear
- Troubleshoot and repair production equipment
- Write or modify PLC programs for existing and new equipment
- Develop new ideas to assist production in running more efficiently
- Research new equipment and parts for ideas
- Purchase the necessary components for projects
- Coordinate with Contractors project layout and completion deadlines
- Write SOP’s for equipment PM’s and repair processes
0-5 years of experience
Duties include design Build Plans, Plan & Elevation Diagrams, Wiring Diagrams, Cable Schedules, Schematic Diagrams, Instrument Loop Diagrams, Interconnect Drawings and Worksheets (I/O lists), Control panel, Gauge panel and Load Distribution panel, Electrical Hazardous Area Drawings, Motor control system.
- Deliver complete and accurate Requisition Engineering documentation to Requisition engineering in a timely manner and as agreed to by both parties.
- Prepare and submit Part Requests and Engineering Change Orders as required.
- Provide technical support and troubleshooting assistance to outside suppliers, Project Managers, Manufacturing, Sourcing and external customers up to and including installation.
0-5 years of experience
Design electrical equipment; supervise panel builds and equipment fabrication
- Develop and debug PLC and Operator Interface programs
- Manage the schedules and budgets of capital projects across the globe
- Provide equipment install, start-up, commissioning, and maintenance support to plants as needed
0-5 years of experience
- Analyzing and defining solutions to issues that occur during operation, manufacturing, and field deployment for gas turbine generators
- Working with vendors to survey and identify deviations that developed during production to ensure deviations are acceptable
- Performing containment and applying lessons learned from new issues that are brought to attention
- Designing customer customization requests and handling customer questions and concerns
- Delivering BOMs, customer drawings, manufacturing drawings, and redlines for various projects in different product lines
- Coordinating between teams such as Sourcing, Manufacturing, Balance of Plant, and suppliers to ensure product fulfillment
- Facilitating and managing various meetings between staff members
- Board member of Change Control Board and Product Control Board
0-5 years of experience
- Duties include design Build Plans, Plan & Elevation Diagrams, Wiring Diagrams, Cable Schedules, Schematic Diagrams, Instrument Loop Diagrams, Interconnect Drawings and Worksheets. Control panel, gauge panel and load distribution panel, Motor control system.
- Deliver complete and accurate Requisition Engineering documentation to Requisition engineering in a timely manner and as agreed to by both parties.
- Prepare and submit Part Requests and Engineering Change Orders as required.
- Provide technical support and troubleshooting assistance to outside suppliers, Project Managers, Manufacturing, Sourcing and external customers up to and including installation.
6-10 years of experience
- Develop and modify technical specification documents for dynamic brake system based on customer requirements using DOORS (requirements management database) program
- Create and modify schematic design using Pspice as well as being responsible for all product drawings
- Develop performance test procedures for DC and AC traction motors and Dynamic Brake Grid System.
- Develop and conduct qualification testing, analyze data taken from Okinawa Instrumentation software for all new designs and make key decisions on validation results and vendor choices
- Orchestrate detailed drawing and models using Teamcenter and Unigraphics CAD software
- Identify and analyze field issues, manufacturing problems, quality issues, and possible cost savings for DC/AC Motors and Dynamic Brake grid systems
- Develop Tractive and Braking Effort performance curves from sales requirements using Fortran program
- Create and modify BOM (bill of materials) using SAP for dynamic brake system
- Experience as Maintenance Supervisor of union workers and electricians in plant and test floor settings
- Conduct hands on testing and trouble shooting in manufacturing plant and at customers site in the field
0-5 years of experience
Lump sum turn key construction work for auto industry (Magna)
Areas of responsibility: I was responsible for the implementation of whole
engineering system (but in fact not only for electrical work).
- My main tasks was to check and refine engineering design work between other engineering area (construction work design, HVAC, main
- My scope of work was to find in design conception the best offer for the optimal solution in order to rich profitability. After redefining the design
- My responsibility was to participate in tendering process, contracting with subcontractors, and supervising of installation and implementation