- Featured in:
Looking for cover letter ideas? See our sample Power Engineer Cover Letter.
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Energy Resume Samples
Power Engineer Resume Samples
No results found
10+ years of experience
Adjusted controls on equipment to improve efficiency of boilers, and water treatment plant and to compensate for mill requirements, while overseeing capacity levels throughout the system.
- Executed daily operations of a power boiler, a recovery boiler, and a water treatment plant.
- Supplied steam, heat, and water for steam plant, water plant and pulp mill processes.
- Monitored control and switchboard gauges to determine steam, heat, and water distribution met specifications.
- Compiled and recorded operational data on specified forms.
- Trained control room operators, and junior operators in recovery boiler, steam plant, and water treatment plant operation.
- (C.R.O.) Supervised and managed a shift under the direction of a shift engineer and chief engineer.
- Successfully managed a four-to-five person team operating a 150,000 lbs. /hr. hog fuel power boiler, an Incinerator black liquor boiler, and a water treatment plant in a closed loop system.
0-5 years of experience
Designed the integration of telecommunication equipment into existing and new facilities
- Designed and implemented AT&T Distributed Monitored Alarms and Control System (DMACS) to monitor telecommunication equipment on a token ring Local Area Network.
- Performed site surveys through out the country as required for the purpose of preparing quotations and/or laying out project requirements for AT&T.
- Managed individual projects to ensure that each will maintain profitability, and complete on time and with a high acceptable level of quality.
- Created and updated office records documentation for customers, installation specification and Bill of Material as required for each project.
- Created job specifications package and (MOP) for scope of work and final documentation package for customer.
0-5 years of experience
Contributed to the ongoing success of [company name] by providing EEE componentand system engineering expertise across all product categories.
- Developed state-of-the-art solid-state interrupters and uninterruptible power supplies for both military and commercial applications.
- Major contribution to L3 success in their field by solving producibility problems through the use of standard parts, non-standard parts, new technology parts and resolving material review board issues.
- Major system upgrade provided through use of COTS components to satisfy both customer and system life cycle requirements.
- Consultant to Reliability and Maintainability organization regarding component electrical stress and thermal stress evaluations.
- Solved design and component related system problems and established test verification protocols.
6-10 years of experience
Responsible for managing 140 internal field technicians who supported 3,000 FAA (Federal Aviation Administration) facilities. Provided 24/7 power support to internal and external stakeholders to ensure service level agreements were met.
- Experienced zero outages during my time on the FAA contract and as lead support.
- Managed the creation of a web-based system for quarterly and yearly preventative maintenance reports, later reported to the external customer.
- Presented DC-power project scope to the FAA officials for a 10 year, $1B contract.
- Assisted with the development of DC-power distribution systems to support FAA communications.
- Diplomatic support to the FAA during the 2003 North East blackout, where we experienced zero down time.
- Managed the replacement of over 4000 batteries to meet the approved schedule and cost baselines.
- Trained internal field technicians on procedures and preventative maintenance, to ensure quality and performance standards.
0-5 years of experience
Reviewed overhead and underground Medium Voltage designs for residential and commercial customers.
- Prepared electrical calculations including cable, transformer and breaker sizing and electrical panel loading.
- Collected, reviewed, updated and analyzed system parameters and load data of different MV substations for planning, design and system Improvements.
- Prepared single line diagrams using Micro Station for Medium Voltage.
- Prepared a forecast of Medium Voltage materials.
- Prepared weekly reports of critical and shortage of materials.
- Designed and specified electrical distribution System.
6-10 years of experience
Provided project, contract, procurement and program management for large infrastructure investment and rehabilitation projects, emphasis on CHP and district heating power plants, substations, and power system and control system renovations, internationally. Approximately $1.3 billion worth of such projects, mainly in Eastern Europe and China.
- Provided project identification services for borrowers, project concepts, cost estimates, and economic analysis.
- Prepared Project Appraisals for Bank’s Board.
- Provided procurement planning and assistance.
- Supervised borrowers’ design and specification efforts.
- Supervised project implementation and reported progress to Bank’s Board
- Prepared project evaluations and completion reports for Board, and estimated economic benefits of projects
0-5 years of experience
Specified size and type of generators and ATS/ MTS to be used at wireless sites.
- Designed and maintained AC & DC power systems for Qwest Central Offices.
- Managed power installation and upgrade projects.
- Interfaced with the switch, transport, and access groups to determine power requirements. This included specification for the addition of batteries, rectifiers, PBDs, BDFBs, Generators, HVAC, AC, fire/alarm systems, and building structural
- Prepared detailed MOPs, performed test and acceptance and QA upon project completion.
- Assisted in locating equipment vendor and implementing a SCADA system in Qwest power plants.
- Implemented new vendor RFQ processes.
0-5 years of experience
Performed site surveys at head ends and hubs to install new equipment from vendors. From these surveys, RFP and SOW’s are created to send to the prospective vendors for bidding on installation of the product and upgraded [company name] records to industry standards
- Instituted upgrades of various building equipments as a facility engineer
- Performed regular maintenance and emergency service on AC/DC [company name] power equipment
- Coordinated, managed, and quality inspected installations from [company name] vendors to ensure compliance to company standards
- Engaged on the AT&T Network Systems team, created detailed and accurate installation specifications to fulfill specific customer orders or requests for equipment, such as DSO, DS1, DS3, ATM, Frame Relay, and WorldNet
- Acted as a liaison between internal partners and customers to increase departmental profitability, increase production and reduce customer related costs
- Possessed a comprehensive knowledge of infrastructures for Central Offices and Hub sites
- Provided Firm and Final price quotes to external customers for Engineering, Installation, Furnish Services
- Updated customer records using AutoCAD to reflect additions of equipment, cable rack, grounding & fiber duct
0-5 years of experience
- Designed and implemented new charging workflow processes and increased the number of charging stations by four, which resulted in productivity increase of 30%.
- Wrote customer proposals and bids, followed-up with prospective clients to answer questions and close sales agreements.
- Revised company operating procedures for easier workflow.
- Emergency work with the Cable and Wireless Amsterdam and London Node turn up.
0-5 years of experience
- Supervised ongoing steam generator field work to ensure project milestones completed on schedule and within budget
- Led effort to revise and select proposed multi-million dollar laboratory inspections and cleanings to be performed over a ten-year period by evaluating cross-functional feedback and reviewing technical need for performance
- Coordinated a 5-8 member project team to perform division’s yearly review and approval of proposed multi-million dollar lab work
- Explained technical concepts and resolved divergent viewpoints across multiple functional areas to achieve group buy-in on technical actions
- Resolved emergent issues requiring speedy resolution to ensure uninterrupted ship operations
0-5 years of experience
Interfaced with operations to develop equipment installation specifications.
- Developed and implemented plant-wide preventive maintenance lubrication program.
- Formed Quality Action Team to resolve a plant-wide maintenance problem.
- Trained in HAZMAT and Total Quality Management.
- Modeled plant air system with simulation software.
0-5 years of experience
Ran HP QA power testing programs for tables/phones and created daily reports to upper management.
- Collaborated with SW/HW/QA teams to investigate and resolve technical issues related to power consumption.
- Ran radiated carrier testing for ATT & World Ready, Conducted CCF testing for Verizon and Sprint phones.
- Used Rohde & Schwarz CMU200 extensively for simulating CDMA, UMTS, and GSM phone calls.
- Used Agilent VEE Pro automation programs to generate CDG profiles; used to determine average talk-time of phones and tablets in specific user scenarios.
- Trained new hire QA engineers in Power Bench testing and familiarized them with WCDMA, CDMA, and GSM CMU200 protocols.
0-5 years of experience
Worked under a PHD student to test different configurations of a three leg transformer
- Recorded data using a LCR Meter such as the resistance and inductance at various frequencies, also using various other lab equipment
- Presented results to staff, and other students
- Gathered data for Thermal Testing of Toroidal Transformer
6-10 years of experience
Lead firmware engineer for the Gemini drive family of digital stepper and servo drives and controllers
- Lead firmware engineer (team of 8) from initial product conception through post-production
- Designed system architecture including interrupt scheme, memory partitions and file structure
- Developed self-configuring scheme that allowed the same code base across full product line
- Designed digital step motor control algorithms which resulted in 3 patents
- Implemented Profibus and DeviceNet protocols
0-5 years of experience
Designed wiring drawings for switchgear, lighting, and auxiliary station power
- Created company-wide master specifications for medium and low voltage power cables
- Prepared work flow designs for key internal company processes
- Researched lighting regulations for wet FGD chimney installation
0-5 years of experience
Monitored power plant equipment and indicators to detect evidence of operating problems.
- Operated switchboard-controlled and semiautomatic power generating equipment, including boilers, turbines and generators.
- Regulated equipment operations and conditions, such as water levels, based on instrument data or computer data.
- Adjusted controls to generate specified electrical power or to regulate the flow of power between generating stations and substations.
- Managed power equipment repairs.
- Concluded contracts to buy/sell energy materials.
- Maintained and repaired heating networks.
0-5 years of experience
Monitored power plant equipment and indicators to detect evidence of operating problems.
- Operated switchboard-controlled and semiautomatic power generating equipment, including boilers, turbines and generators.
- Regulated equipment operations and conditions, such as water levels, based on instrument data or computer data.
- Adjusted controls to generate specified electrical power or to regulate the flow of power between generating stations and substations.
- Managed power equipment repairs.
- Concluded contracts to buy/sell energy materials.
- Maintained and repaired heating networks.
0-5 years of experience
- Assisted in design and oversaw the engineering of Sprint’s PCS wireless communication network
- Evaluated potential tower, monopole and building top antenna array locations, and supervised their installations
- Coordinated with local utilities to supply power and communication lines to all cell sites
- Researched, ordered and tracked project materials as well as compiled and assembled documentation for turnover packages
- Developed safety plans for all construction sites
- Represented the company at local and regional progress meetings with clients
0-5 years of experience
Performed load flow analysis, symmetrical and asymmetrical fault studies on high and low voltage systems.
- Drafted one line diagram schematics in AutoCAD, Powerworld, and power tools for windows.
- Performed equipment coordination when installing new equipment on any given bus ranging from 600V-230KV within the power system.
- Indoor and outdoor lighting design including cost estimates preparations.
0-5 years of experience
Responsible for installation, removal, and maintenance of DC power systems. Specified rectifiers, batteries and related DC power equipment used for multi-million dollar projects.
- Established project budgets
- Scheduled and tracked projects and awarded contracts to approved suppliers
- Reviewed battery cost, delivery, warranty, and performance issues.
- Involved in price negotiations with suppliers.
6-10 years of experience
Fulfilled the role of Sales Engineer working directly with customers to determine requirements and develop solutions for fluid power systems and applications for a wide array of industrial machinery types.
- Used 3D CAD modeling to generate concept drawings to accompany sales proposals/quotes presented to customers and assist in landing the sale.
- Provided technical support and product knowledge to sales staff and customers.
- Produced schematic drawings and bills of material for the fluid power circuits.
- Designed custom hydraulic manifolds for integrated circuits.
- Produced installation/operation/maintenance manuals for delivered fluid power systems.
- Supervised and performed installation and startup of delivered fluid power systems.
- Provided troubleshooting services for customers’ fluid power circuits.
- Fabricated, plumbed, wired and tested small fluid power systems.
- Developed and instituted corporate CAD standards.
- Spearheaded implementation of product data management software and development of corporate engineering procedures.
0-5 years of experience
Designed and implemented electrical projects, including installation, electrical networks maintenance, power generating stations, HV power transformers, and HV/LV underground cables
- Planned and reviewed construction operations to ensure compliance with NEC, IEEE.
- Ensured completion of projects and O&M activities
- Reviewed material acquisitions, RFIs, submittals, and ensuring contract performance measures are met per position discipline requirements within budget and per contractual schedule
- Prepared scope of Work, electrical plans drawings, IGE (Independent Government Estimates), and generally acceptable technical specifications for large and small scale projects
- Provided all bid process requirements and contract administration services during construction
- Implemented decisions, guidance, laws, regulations, and policy of projects
- Assisted in programming decisions, budgeting, scheduling, project management and construction activities
- Planned work to be accomplished and preparing schedules for completion of work
0-5 years of experience
- Aided in the development of energy auditing plan to maintain energy
- Annually performed and/or reviewed 64 Central Office energy audits to determine Capital Equipment Budget forecasting.
- Business Plan – Estimate costs and order equipment for Central Office
0-5 years of experience
- Engineered AC/DC power plants and broadband equipment for BellSouth Telecommunications COs; Vortex, PECO II, Lineage, GPS, CPS, BDFB, Inverters, Converters, UPS and Batteries.
- Created and updated all office Floor Plan drawings using AutoCAD and mechanized infobank systems.
- Prepared Price Quotes and Cost Estimates for job orders.
- Establish Work Specs & MOPs from site surveys for Engineering and Installation.
0-5 years of experience
Served as Spacecraft Electrical Power Subsystems (EPS) Lead Engineer for NuSTAR and OCO-2 Spacecraft. Designed and manufactured power regulator circuits, sequenced gyroscope power control and fuse assemblies. Managed the subcontract acquisition, integration and testing of solar arrays, gimbals and batteries. Performed Earned Value Management of subsystem as a Cost Account Manager (CAM). Conducted NASA/JPL design reviews, flight readiness reviews and hardware deliveries. Supported NuSTAR, OCO, COTS and ICESat. NASA Satellite EPS Lead Engineer for power acquisition and distribution for science instruments and housekeeping for flight system, ground support equipment and umbilical power service. Resolved significant internal and subcontractor off-nominal MRB/FRB issues.
- Mission Control Console duties during NuSTAR launch, a research platform studying the hard X-Ray spectrum.
- Planned, baselined cost & schedule and managed subsystem component selections, make/buy trade studies.
- Analyzed and managed spacecraft power budgets.
- Managed power interfaces between EPS subsystem, spacecraft components and NASA/JPL instruments.
- Conducted PCB and Box-Level testing with extremely troublesome heritage LEOStar EGSE racks.
- Resolved significant internal and subcontractor off-nominal MRB/FRB issues.
- Supported EPS subsystem integration and test as well as battery charge/discharge operations.
- Verified component requirements during end-item data-package (EIDP) review.
- Supported spacecraft-level test programs for Vibration, Acoustics, Shock, Thermal Vacuum, EMI/EMC.
0-5 years of experience
Performed service of substations and transformer stations of 4 plants in different places.
- Replaced and repaired different high voltage panels, switches, circuit breakers, cables.
- Installed additional transformer stations, performed connection and disconnection of high
- Installed and repaired electrical systems, apparatuses.
0-5 years of experience
Participated in Urban power planning and distribution
- Review provided local power usage data in a timely for accurate.
- Monitored the power systems distribution
- Performed any additional power distribution assignments as requested by the supervisor
0-5 years of experience
Determined the efficiency of linear and switching regulators
- Analyzed wave forms to determine switching losses of mother boards
- Hot wired mother boards for power-up enabling
- Tested AC to DC power adaptors
- Performed Virtual Transient Diagnostics on inductors to determine specifications
- Performed efficiency diagnostics on mother boards to determine power consumption of mother boards
- Developed test procedures
0-5 years of experience
Managed projects to achieve goals for technical excellence, budget control, schedule compliance, quality control, client satisfaction, and project profitability.
- Planed, managed and supported Central Group sales efforts to increase different product lines sales revenue at target accounts, OEM’s and MRO’s companies. Field engineering support
- Worked closely with the other functional areas of the company to complete projects and insure a smooth transition of the product into production including suggested parameters for testing of production units. Finalized all engineering documentation necessary for product release.
- Collaborated with managers and specialists to design, prototype, test and trouble-shoot new components and systems for customers including automotive, chemical, food and beverage, wood and lumber, iron and steel, pulp and paper, mining and aggregate, and pharmaceutical industries.
- Provided engineering data (Bill of Materials, CAD drawing, service documentation) and product recommendations for mechanical, electro-mechanical, hydraulic, electro-hydraulic, pneumatic, electrical and motion control components and assemblies.
- Established materials costs, labor costs, production costs, needed processes.
- Performed engineering release integration into Materials Resource Planning (MRP) system to ensure timely release of production bill of materials (BOM).
- Prepared equipment for installation and start-up and provided documentation. Attended on-site systems start-up.
- Monitored Engineering Change Request /Notice (ECR/ECN) activities for timely execution and distribution
0-5 years of experience
Ensured that safety codes and other applicable regulations are followed
- Used computerized systems to control, start, shut down and track the operation of boilers and related equipment, or use automatic or manual controls
- Monitored alarms, gauges and other instruments associated with plant operations
- Trouble shoot and took corrective action to prevent equipment or system failures
- Isolated and locked out equipment mechanically and electrically for inspection and repair
- Ensured that equipment and processes operate at maximum efficiency
- Took chemical tests of boiler water and other process samples, interpreted them and determined appropriate chemical treatments
- Assisted in the development of operation, maintenance and safety procedures
- Maintained a daily log of operation, maintenance and safety activities
- Investigated and reported on safety-related accidents or incidents
- Worked with outside agencies, consultants and contractors.
0-5 years of experience
- Worked as front-end power test engineer
- Tested AC/DC power supplies using oscilloscopes, current probe amplifiers, multi-meters, and electronic loads
- Built and assembled power cables and harnesses
- Executed extensive failure analysis tests plans on several power supplies while documenting results in reports
- Characterized and validated power supply prototypes
- Familiar with I2C interface
6-10 years of experience
- Lead technical manager on a US/UK collaboration demonstrating TRL7 in a land vehicle, EM armor system.
- Helped secure the performance and delivery schedule of a 30 MJ PFN by developing a high coulomb transfer (150 C/100 kA) vacuum switch operating at 16 kV.
- Fabricated a bench-top test facility to establish the specific thermal characteristics of components for a 400 kW DC/DC power converter.
- Designed and built a thermal test facility to evaluate DC lifetime and pulse discharge performance of advanced, high voltage capacitors.
- Designed and fabricated a Li-ion battery based 15 kW power convertor for a 3 kW IR fiber laser.
0-5 years of experience
Evaluating power reduction opportunities for next gen Adreno GPUs.
- Exposure to debugging and developing Synopsys Primetime flows for power rollup of next gen Qualcomm GPUs.
- Involved in evaluating the architectural inefficiencies of current and previous generation GPUs based on power
- Developed scripts to further automate various post-processing tasks and flows.
- Knowledge of graphics hardware pipeline architecture, while working on Qualcomm’s Snapdragon SOC.
0-5 years of experience
As a Project Electrical Engineer was liaison with engineers, drafters, design, senior customer personnel, visit customers, US and Overseas for technical reviews, giving presentations, and making decisions on behalf of the company. I interpreted the technical requirements of customer specifications, standards, calculations, drawings(outline, schematics, lifting, one line wiring diagram (Indicating Power Source and next gen controls communications, assembly revisions, systems operation program, factory acceptance test, wire tags, electrical/ mechanical system inspections and prepare technical proposals, co-ordinate and oversees all aspects of each project from development through to initial production stage to ensure time scales/schedules are achieved.
- Work in Project evaluation and drawing review, corrections for British Gas Plant, PEMEX (Gas, Offshore Marine Platform, and Telecommunications), Petrobras, Yahoo Plant, Instituto Of Cardiology of Mexico, Conoco/Phillip, PPGPL ( Gas Processors ), AMOCO/BP, Esso/Mobil, PDVSA, NASA and ROLLS ROYCE for NASA Test Stand Electrical Grounding Systems, Electrostatic Discharge Protection and Transient Over voltage Control Systems Protection.
- Increased Engineering Support to customers in house and internationally.
- Problem solving for a Yahoo Plant -VFD/Motors skills a must to identify and develop test boards and/or platforms to complete feasibility and supervises: proof of concept for mitigation technologies. ARC FLASH/ELECTRICAL SAFETY Training
- Experience in Software solving RF/EMI problems at both the PCB and system level is desirable Ohmic method circuit component impedances/ Per unit method applied to short circuit currents.
- Calculation to determine be electrical grounding and bonding for specific Resistance and Resistivity c industry site. SoftwareCalculation for GPR- Ground Potential Rise.- One line diagram- AUTOCAD.
- Provided technical support and training to over dealers located in my region.
6-10 years of experience
DPC of fossil fuel fired power plants for fuel conversions, renovations and upgrades of fuel systems and environmental control equipment for New England Power’s Brayton Point Power Station.
- Design and procurement of piping systems and components for several fossil fuel and nuclear power plants.
- Boiler and environmental equipment redesign for balanced draft conversion.
- DPC and fabrication of all large and small bore piping systems for several fossil fuel fired plants.
0-5 years of experience
Electrical engineer supporting all aspects of the Traction Power substation site design, specifications and Traction Electrification Simulation Studies.
- Site design includes: equipment layout, ground grid design and conduit/duct bank routing to interface with OCS, Signals, and Communications, Submittal Review and Response to RFIs.
- Testing for Equipment and Site.
- Power system studies for AC and DC electrified railway systems
- Simulations and studies including AC and DC load flow, short-circuit availability, and protective relay coordination studies
- Perform Traction Power Calculations, Simulations and CAD Design
- Prepare budget and schedule, planning the work and regular report of work status.
0-5 years of experience
Developed and assessed engineering specifications for installation of telecom equipment. Mentored employees to proficient engineering Spec writers. Worked closely with installers to gain in-depth understanding of engineering specification procedures and power application. Provided technical support for customer and field installers to resolve issues.
- Pioneered the Engineering-Installation Rotational Project, leading team and ensuring each member had a complete understanding of their role.
- Represented the engineering organization on a weekly conference call with customer to anticipate any projects or orders that were in jeopardy of not meeting TEO complete dates.
- Updated drawings on Infobank database, AutoCAD, Allview and NIM-ER systems.
- Analyzed TEO’S to determine requirements and prepared written analysis for Spec writers.
- Consulted with customer to coordinate a project planning strategy to determine if there is sufficient DC power and space availability.
- Compared customer authorization and analysis to ensure specifications were in compliance and accurate.
0-5 years of experience
Installed, maintained and repaired Telecommunications Systems for AT&T, Bellsouth, TriVergent Communications Inc, Verizon, Epik Communications and FPL FiberNet, Emerson, DC Pro Power, Team Force Power
- Installed DC Power Equipment for cell sites and central offices
- Microwave antenna line installation
- Installed Power plant batteries, and rectifiers, load testing and servicing
- Installed BDFB cabinets and racks
- Installed dc power cable and lacing cables in central offices
- Read blue prints/schematics and installed ladder racks
- Excellent Customer Service and Emergency Response skills
10+ years of experience
Licensed to operate and maintain multi-megawatt Power Plants.
- Specialized in electronic engineering.
- Assigned to a high level communications unit, top secret clearance.
- U.S. Army Combat Heavy (Airborne) Engineers.
- General construction.
6-10 years of experience
- Developed BMP(board-mounted power supplies) up to 90A and VRM12 for Router and Switches.
- Developed 6A/12A/20A Basic Power Macro with the schematics, PC layout, and Excel workbooks including MathCAD files.
- Developed GPIB programs to test BMP automatically by Excel VBA.
6-10 years of experience
Maintaining and troubleshooting the stations Novell Network including all hardware attached.
- Maintaining the Stations Process Computer System
- Maintaining the Stations Security System and all hardware attached
- Project Managed relay, transformer, meters, system generators, and cooling tower pumping station during system outages.
0-5 years of experience
Develop and manage a capital improvement budget of over five million dollars for various projects at twenty facilities as well as implement cost-cutting measures, and present cost effective solutions.
- Perform audits at existing facilities on UPS systems and DC power plants to expand on capacity and improve power redundancy, system compatibility, and maximize reliability.
- Implement and oversee new designs of UPS systems and DC power plants using Auto-CAD.
- Rebuild and update existing electrical one-line diagrams for facilities using Auto-CAD.
- Commissioning and testing of electrical, HVAC, and BCM projects.
- Analyze short circuit, and coordination study reports.
- Various work with TCP/IP, Modbus, networking, BCM, and BMS.
- Participate in planning sessions with architects, engineers and building managers for potential new data center acquisitions.
- Perform power and cooling calculation analysis for physical space layout of data center collocation.
- Draft weekly progress reports of nationwide projects for management review.
- Effectively communicate with working teams, peers, and management. Furthermore, relay consistent and clear instructions to operations group, contractors, and vendors.
10+ years of experience
Perform maintenance as required throughout the plant.
- Responsible for operation of high-pressure boiler 150,000 pph and 4-turbine generators 600 psi.
- Operations of hot lime softening system and all boiler tests.
- Observe boiler and auxiliary units to detect malfunction and makes repairs, such as changing burners and tightening pipes and fittings.
0-5 years of experience
Ability to lead projects, including planning, scheduling, budget, conducting and leading project teams.
- Develop electrical and power system equipment, installation of medium/low voltage distribution equipment and working knowledge of system and equipment ground requirements (high resistance, building and isolated grounding), flash hazard, and load studies.
- Perform power factor analysis, correction and grounding analysis.
- Conduct short-circuit, protective device coordination and arc-flash studies.
- Knowledge of NEC, IEEE, and ANSI standards, as related to electric power systems and equipment.
- Knowledge of Siemens relays, WL circuit breakers, and Sirius Motor Management & Control Devices (SIMOCODE Pro).
- Ability to generate 1-line electrical diagram with Auto-CAD program.
- Work collaboratively with Engineering, Management, Purchasing, Maintenance and Reliability, Planning, and contractors on scoping, developing and implementing projects.
- Provide safety leadership relative to electrical distribution and power systems.
- Perform power system and engineering studies on medium voltage and low voltage distribution systems.
- Apply design knowledge in medium and low voltage power distribution, grounding, distribution panel, power and lighting loads, sizing and selection motor control centers (MCC), variable frequency drive (VFD), and automatic transfer switches.
0-5 years of experience
Project Engineer for various projects within the consulting group, provided technical support to colleagues and clients.
- Product Manager for various modules within ETAP. Provided direction to the team on new development tools and technical assistance.
- Consulting with clients in system modeling of one-line diagrams.
- Providing technical support with Arc Flash, Load Flow, Short-Circuit, Motor Starting, and Coordination projects.
- Entering an array of different elements into the ETAP libraries by obtaining the manufacturers data and entering the information into ETAP. Elements such as circuit breakers, trip devices, fuses, relays, cables, and batteries.
- Providing clients assistance in the ETAP courses.
- Testing the ETAP modules for verification and validation.
- Technical writing for ETAP procedures and testing.
- Conducting systems studies such as Load Flow, Short-Circuit, Motor Starting, and Arc Flash Analysis for various clients.
- Working knowledge of different standards such as the IEEE color code series, IEC and NEC codes.
- Providing direction to the sales and marketing team to increase product sales.
0-5 years of experience
Responsible for testing and integration of high power ECM transmitters.
- Schedule and delegate tasks to engineers and technicians.
- Diagnose problems in support of test and repair technicians.
- Direct assemblers in assembly techniques to streamline process.
- Write test plans for transmitters and direct ATE SW personnel.
0-5 years of experience
Design of high voltage pulse power system
- Design of high power Q-Switch laser power supply
- Design of digital controlled semiconductor laser power supply
- Simulation of high voltage pulse power systems
- Analog circuit design and test
- Design battery operated high voltage systems
0-5 years of experience
- Design of Medium & High Voltages
- Pricing Analysis
- Design of I/O List, Earthing
- Design of Power Circuits, Cabling and Size Determination and Cable Rooting
- Participating in Technology, Product Definition and Design Reviews
0-5 years of experience
- RAS SOE System – Design and implemented the system that retrieve the SOE data and put them in the SQL database for better availability.
- RelTrack – Interface with the RAS system to characterize the normality. Provide the advanced warning for potential events.
- Auto RAS Report System – Automatically stitch data from various sources to report events of the grid.
- Committee member of the new RAS system