- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Engineering Resume Samples
Contract Engineer Resume Samples
No results found
0-5 years of experience
Performed piping system evaluations and engineering calculations to ensure compliance with engineering and industry standards.
- Generated requisition packages for procurement of company materials and purchase orders for service distributions.
- Prepared data sheets consisting of performance and functional test parameters of mechanical equipment.
- Developed predictive (PdM) and preventive maintenance (PM) strategies for improved reliability and efficiency of HVAC system performance required to meet regulatory and air quality standards.
- Provided technical and operational engineering guidance for mechanists new installation of a piping system through URS safety and procedure guidelines.
- Developed equipment upgrade and standardized maintenance program for rotating equipment to achieve targeted downtime metrics.
- TWIC and OSHA, Interpersonal Skills: Initiative, Teamwork, Strong Communication, Organizational, Problem-solving, Multi-Tasking skills
0-5 years of experience
Provide engineering recommendations and collect data needed to support reliability and integrity projects.
- Analyzed, monitored and redesigned distribution circuits to maintain/increase service reliability.
- Design and produce specific job orders needed to complete service reliability and integrity.
- Investigate customer complaints related to power quality.
0-5 years of experience
Assisted Product Engineering in testing, analyzing, and interpreting data for automatic transmission solenoids for Ford, GM, and Chrysler
- Assisted Manufacturing Engineering in repairing and maintaining pneumatic and electrical controls and sensors on the production lines
- Designed various custom parts with AutoCAD, got tool and die to make parts, and ensured functionality of designed parts.
- Wrote work instructions on various tasks and processes
- Performed daily Microsoft Office tasks
0-5 years of experience
Field reliability SME and customer support engineer for the new interactive Coca-Cola Freestyle soda fountain during early equipment development and field testing.
- Managed customer installs and conducted field audits for new equipment placements.
- Developed new methods to analyze and mine Freestyle machine telemetry data in order to diagnose and proactively manage field issues.
- Developed processes and metrics to identify key drivers of machine failures through defect analysis and tracking in order to resolve field and manufacturing issues.
6-10 years of experience
Group develops 3G/4G base station chips.
- Designed and simulated RTL for CRC, 4B5B, HDLC and Hyperframe encoding and decoding logic, a linked list multi-channel FIFO, a Cross-point switch and other functions for Antenna interfaces.
- Developed system interface for a 3G/4G protocol accelerator. Provided a packet parser front end and tracking error history logic for each accelerator block. Added HARQ and Beta calculation to a module.
- Debugged the protocol accelerator chip failures providing an ECO for one failure and a SW/JTAG solution for another improving yield over 5%.
- Modified a Transmit Aggregation design for 2x the sources, added a complex multiplier for rotation/scaling operations and other functions. Increased timing to go 40% faster than the original design in the same technology.
- Re-coded a non-functional FFT front end as well as portions of the FFT core for new functions and to run 40% faster.
0-5 years of experience
Worked on project that involved mechanical design of tooling, jigs, fixtures and dollies for the new Model launch project.
- Designed ergonomic tooling to assist team members in building vehicles.
- Calibrated torque wrenches and program torque monitors.
- Coordinated a project groups, redesigned plant layout, equipment installation.
6-10 years of experience
Created maintenance manuals for repair and maintenance for F-35 jet fighter engines.
- Designed hardware and support equipment for Space Shuttle Main Engine, J-2X and RS-68 programs.
- Revised specialty manuals for safety and shop procedures.
- Worked with vendors to ensure delivery and resolve manufacturing issues.
- Designed hardware with consideration to aerospace material standards.
- Provided the documentation for design reviews both with internal and external and customers.
0-5 years of experience
Developed and implemented process improvement projects through to completion
- Created work standards, quality control charts and operational processes.
- Utilized and implemented Continuous Improvement tools and methods – 5S, 2P, 3P, SQDC, Lean Assessment, Value Stream
- Developed technical hands-on process solutions and cross-departmental manufacturing solutions
0-5 years of experience
Maintained various automated test equipment and test software for sustaining and new products.
- Monitored test failure trends in production and implement corrective actions to improve production
- Interfaced with customers and internal cross-functional teams to solve all testing related issues.
- Trained test operators on new and existing testing procedures.
- Debugged analog and digital boards root cause investigations to troubleshot hardware failure down to component level.
- Documented failure symptoms, manufacturing defects and hardware repairs for weekly customer
- Assisted testing and analyzing test data as customer’s request for component durability issue.
- Performed other duties as assigned.
0-5 years of experience
Promoted to Contract Team Leader of Self-Expanding Stents Product Development Group
- Conduit for information between [company name] management and contract engineers on site
- Chaired weekly and monthly [company name] review meetings, to ensure that the customer (Boston Scientific) was at the heart of [company name]’ strategies, plans and activities
- Mentored and advised colleagues
0-5 years of experience
Produced, verified and taped out the digital core for 5 different channel count PreAmp ASICs for a major hard drive manufacturer. Methodology has a Synopsys front end and a Cadence back end. Tasks included, minor RTL changes, synthesis, formal verification, SystemVerilog OVM verification, floor planning, ICC P&R, extraction, PrimeTime STA, regression testing and scripting.
- Identified a floating tri-state net leading to potential crossbar current in existing designs
- Improved HDL verification by adding Spyglass analysis at gate level HDL
- Improved standard cell timing models to eliminate thousands of false glitch violations on flops.
- Corrected subtle flaw in floor plan which blocked placement of double high standard cells.
0-5 years of experience
Consulted on custom analysis pipelines and software development for a previous employer
- Performed analysis and reported results for an R&D project for a previous employer using Amazon Web Services
- Reactive, dynamic website development for three clients (currently in development): Rails, MySQL, Bootstrap applications
- Traveled to 15 countries during this time
0-5 years of experience
Prepared and executed validation change control requests for equipment, utilities and facilities.
- Executed HPLC Installation Operational Qualification (IOQ) computer validation.
- Executed Clinical Building Management System IQ and prepared Validation final package for approval.
- Reviewed and revised Clinical Building Management System Operational Qualification (OQ) protocol.
- Prepared commissioning package and executed dry-run Commercial Building Management system IQ and OQ.
- Prepared turn-over packages, commissioning packages, preventive maintenance, and operating procedures for Building Management System, refrigerators, freezers, and humidity chambers.
- Interfaced cross-functionally with Manufacturing, Validation, QA, Maintenance, Instrumentation, Information Systems, and Construction to meet project goals.
- Created Engineering Drawing Management Systems and updated engineering drawings.
0-5 years of experience
Contracted to assist with design team to develop final stages of product design for new application.
- Coordinated design and delivery of several components for new product, developed process procedures for outside vendors.
- Conducted rapid prototype delivery of a critical subassembly, coordinating with several vendors.
- Assisted in the run off and implementation of a new production line for the new product, which included development of testing parameters for in-process test and assembly systems.
0-5 years of experience
Summary: Reviewed existing utility layouts and developed design drawings for AT&T
- Surveyed and conducted inspections of existing utilities
- Developed efficient conduit routing solutions based on city regulations and budgetary limitations
- Analyzed proposed conduit routing plans per local county ordinances and utility regulations
0-5 years of experience
Projects included writing and revising training materials for all part numbers and equipment transferred to the Monterrey, MX facility for the exhaust fabrication group. Coordinating with the Monterrey, MX exhaust weld group for transfer of parts, supplies, equipment, tooling, and training materials. Improving processes for welding of exhaust components. Analyzing needs for packaging and reassigning of all remaining equipment for exhaust and paint departments.
- Devised and wrote training materials
- Organized and updated equipment and tooling
- Re-wrote routing information/instructions
- Analyzed packaging and shipping requirements for international shipping
- Supported exhaust group and paint group transfer to Monterrey, MX
- Familiar with OTC robot systems
0-5 years of experience
- Updated and created engineering drawings, including products and manufacturing equipment, using AutoCAD and Pro Engineer
- Developed tolerances and material specifications for varying product components and assemblies as well a RF welding die’s
- Worked within a team to meet goals and deadlines in order to successfully transfer product lines internationally
- Assisted in the creation of and implementation of First Article Inspections, FMEA’s, and Factory Acceptance protocols
0-5 years of experience
- Lead engineer for complete re-analysis of effects of High Energy Line Breaks (HELB) outside of containment for Point Beach. Provided oversight of S&L analysis effort. Coordinated efforts of utility and contract personnel to perform analysis, provide comments/feedback, and develop problem solutions. Continuously monitored project status and ensured completion of action item commitments.
- Performed hydraulic analysis of Service Water System, doing single-phase flow modeling using the WATER analysis program. Upgraded and enhanced existing analyses to account for changes in plant design and ensure system operability beyond previously analyzed design conditions. Completed calculations specifically for SW System response to Appendix R fire events.
- Supported efforts to update Design Basis Documentation to respond to 10 CFR 50.54 (f) and in support of restart of Millstone Unit 3. Researched background of documentation discrepancies. Developed resolution strategies. Prepared FSAR changes. Performed 10 CFR 50.59 Safety Evaluation Screenings, and provided input to Safety Evaluations. Efforts focused on Containment Isolation valves and Chilled Water System.
- Team oriented effort to develop dispositions and close-out of backlog of over 400 non-conformances identified at Millstone. Researched background of non-conformances. Worked with system engineer and others to identify actions needed for resolution. Followed up on actions, and closed out non-conformance reports. Addressed problems with plant equipment such as piping, valves, and other mechanical equipment, as well as drawing and paperwork discrepancies.
- Lead engineer for review and revision of flooding analysis calculations and documentation for Cooper Nuclear Plant. Researched all relevant calculations and documentation. Provided independent review of calculations. Developed detailed tabulation of all plant flooding scenarios, including deficiencies and recommendations for correction.
0-5 years of experience
- Set up interfaces between PCs and numerous electronic and optical measurement systems.
- Wrote numerous software applications in VB.NET for performing tests on solar cell devices and gathering and storing the data in a SQL Server database.
- Designed and implemented a hardware interface and VB.NET application to effectively semi-automate a vacuum deposition process. This freed an operator from performing lengthy, tedious sequences of manual operations and data entry thereby increasing experimental throughput while significantly reducing errors.
- Created several Excel/VBA applications including one for greatly simplifying the analysis of spectral measurement data.
0-5 years of experience
Documented and supported engineering changes to include cabinet interiors and electrical wiring installation designs involving 7X business-class aircraft manufactured by this aeronautical engineering company. Ensured all FAA and CAA specifications were followed on all aircraft, including those delivered overseas.
- Effectively established communication provisions between engineering and design coordinators.
- Perfected skills in use of CATIA V5 VPM and parts design on CATIA V5.
- Successfully established communication provisions for engineering design changes.
- Provided drawing documentation for all liaison updates for current aircraft changes between engineering and design coordinators.
0-5 years of experience
Assisted in product development life cycle tests.
- Conducted electrical and mechanical tests on equipment and products.
- Monitored the manufactured product and ensured that it corresponded with the engineering documents and other specifications.
- Inspected equipment in accordance to the Quality and certification programs to assure that the equipment meets all quality requirements
0-5 years of experience
Served as a Contract Engineer for the Office of Contracting and Procurement in solicitation analysis, negotiation, awarding and administration of groups of contracts, such as definite quantity, indefinite quantity, indefinite delivery, multi-year, option year, direct vendor supply, and Federal Supply Schedules.
- Conducted comprehensive legal research and analysis. Helped prepare legal arguments, applications, declarations and motions.
- Drafted legal documents including briefs, pleadings, appeals, agreements, contracts and legal memoranda.
- Identified relevant judicial decisions, statutes, legal articles, codes and other pertinent material.
- Prepared and managed range of contracts which includes: devising acquisition strategy, draft and finalizing Statement of Work (SOW), sole-sources determinations, Request for Proposals, Quotes preparation, Blanket Purchase Agreements, and reviewed offers upon receipt from contractors, determining competitive range, cost and price analysis, in negotiation and contractor/supplier risk assessment.
0-5 years of experience
Reviewed customer requirements, specifications.
- Provided cost, schedule estimate for proposal.
- Drafted mechanical, electrical drawing package.
- Design included stripline, microstrip, chip and wire, soft and hard substrate, single and multi-layer, thru-hole and surface mount components.
- Design and develop receivers and transmitters in the frequency range of 250 MHz to 40 GHz.
0-5 years of experience
Developed data logging firmware for satellite communication.
- Designed high performance hardware and software for Ethernet communication.
- Created fault tolerant plug and play RS485 expansion modules.
- Managed project teams for developing mobile wireless products.
- Cut firmware development and documentation time by more than half.
6-10 years of experience
Interact internationally with internal and external customers worldwide
- Devised customer change request process improving accuracy of process for orders
- Involved with Kaizen lean event
- Helped revise contract procedures specifications and flow charting to streamline process
- Customer Support and order expediting with resolution of customer concerns / questions
- Key in bringing to light NAFTA deficiencies and start analysis of retention of Certifications
- Prioritize incoming jobs, review specifications for contractual soundness and electro-mechanical viability
0-5 years of experience
Developed an effective archiving and easy retrieval excel based system for contract files.
- Assisted the team leader in contract execution in the Obagi Field flow station.
- Conflict resolution, risk analysis, and logistics.
- Supervised interns on their daily task execution.
- Real time acquisition and analysis of data reported by technical team.
0-5 years of experience
Conduct relentless root cause analysis and develop root cause corrective action for production returns and field failures
- Primary engineering contact for customer return and new production pump support
- Investigate and write engineering changes to production drawings
- Work with suppliers to solve production issues and determine usability of nonconforming hardware
- Coordinated Engineering efforts in the return of 16 pumps from the field for upgrade, including a receiving checklist and standardization of dispositions for assembly and testing of the units
- Coordinated pump housing Low Cycle Fatigue testing, including writing of the test procedure, developing schedule, creating cost estimate and driving to closure
- Created multiple tools for training and automation/standardization of common engineering work to minimize variation and reduce engineering time spent on menial tasks
- Earned process improvement award for annual savings of about $23,000
- QuEST Project Engineering Center of Excellence Employee of the Month, May 2013
0-5 years of experience
- Worked with other product engineers to implement design changes on current automotive and connector
- Helped to maintain company database of part numbers, stock counts, material information, etc.
- Conducted testing on new design changes to determine their effectiveness.
- Dealt directly with customers and suppliers to resolve “Quality Notifications”.
0-5 years of experience
- Provided design engineering support to asphalt and utility compactor production lines in Minneapolis,
- Additional responsibilities and accomplishments include many of those in current position.
- Researched and resolved issues discovered on new model prototype and pilot machines prior to production.
0-5 years of experience
Design Assurance activities; including writing the Quality and Risk Management Plan for the MediGuide 2.0 enabled products
- Development and authoring of test methods, test plans, Design Verification Tests, Design Validation Tests (DVT) and PDP activities.
- Authored IQ, OQ, PQ, and PPQs for remediation activities.
- Approval of all test plans generated by other engineers in the Design department.
10+ years of experience
Obtain field work and design Outside Plant to AT&T practices.
- Determine and obtain right-of-way to place telecommunication facilities
- Obtain permits from Municipalities to place telecommunication facilities
- On premise contract engineer working with various computer programs ( LFACS, ARES, Telco11i, CTAP, POLS, APEX)
- Created work prints from field work obtained to AT&T practices
- Delegated/coordinated outside construction, repair and DOG technicians with work load to complete issued projects
0-5 years of experience
Electronic Control Ice Drill for UW Madison.
- Took this project already 2 months late, completed required designs and brought it in on time.
- Design, connector and cable material selection for system interconnects.
- Electronic design of analog interface and logic between motor drives, control console and drill tower.
- Concept, development and design of user controls to analog drive signals for Sonde control, tower elevation and winch.
- Developed and implemented single wire communication method to control sonde rotation direction and recognize anti-torque slip switch closure.
- Concept, development, design and programming of winch cable spooling control.
- Located high-level, high-frequency oscillation in sonde power supply and fixed it without redesign.
6-10 years of experience
Was responsible for designing molds using Autocad software.
- Managed the construction of (2) four cavity plastic injection hydraulic driven gear molds.
- Worked independently, under contract, with a company to help build and complete (2) four cavity plastic injection molds each having a nest holding (90) inserts in each cavity for Tyco Corp. working with and maintaining tolerances + or – .0002 in/in.
- Set up and operate up to (4) Mondo CNC EDM machines per shift to facilitate the construction of the subject Tyco “Connector” molds.
- Responsible for all aspects of fabricating molds on a contract basis, involving Milling, Precision Grinding, Hansvet Manual EDM, hand polishing, final fitting and assembly. Each project each carrying a minimum of five production tools each. All molds required inspection certification.
- Design, assemble and wire up to (32) cavity hot runner systems.
- Experience with multiple tool steels (S-7, H-13, A-2, O-1, Mold Max, etc.), including carbide. Also experience with all grades of graphite.
0-5 years of experience
- Plant engineering to support facilities maintenance and continuous plant operations.
- Designed engineering and facility modifications projects to be implemented during the annual shutdown.
- Specified technical specifications and performance requirement for purchased equipment to insure compliance to plant operation, facility maintenance, and engineering requirements,
- Assisted maintenance department trades in troubleshooting problems and engineering support when needed.
- Responsible for project cost, schedule, and coordination of engineering deliverables.
- Utilized Parts & Vendors to generate Bill of Materials (BOMs), Request for Quotes (RFQs), Purchas Orders (PO), items and equipment specifications, parts lists, notes, links to drawing files, and vendor contact information.
0-5 years of experience
Mapped over 125,000 points into OSiPI Asset Framework
- Review GE Smart Signal advisories looking for quality control issues
- Compile design data for monitored plants into unit summary reports
- Aid in drafting of progress presentations and phone conferences
- 40 hours in Power Plant Fundamentals Training (August – Sept 2014)
0-5 years of experience
- Supported test operations on Teradyne L353 tester.
- Re-hosted Genrad 1792 programs to Teradyne L353.
- Provided support to remote operation site for Teradyne L353.
0-5 years of experience
Performed the following for the Generation Engineering organization:
- Studies as requested by power plants to determine feasibility of performing work as projects.
- As a technical resource, provided technical support to project teams during project execution.
- Prepared project specifications, design and bid proposal documents and installation and operating procedures for various plant projects such as Feedwater Heater replacement and Cooling Tower refurbishment and replacement.
- Project engineer for procurement and installation of plant components such as fuel oil systems, Feedwater Heaters, etc.
- Prepared Project Management Best Practices manual for use as a guide for engineers to perform project management and comply with the requirements of Sarbanes-Oxley.
0-5 years of experience
Resolved a large range of peer review findings for internal events
- Performed HRA dependency analysis and implementation in Riskman for internal and fire events.
- Contributed to various other NFPA-0805 PRA tasks
- Use SAP for searching Work Orders and Notifications for Data Analysis
0-5 years of experience
Approves or rejects interchangeability recommendations based on approved data and sound judgment
- Review OEM manuals and regulatory documents to determine material and component interchangeability for the company fleet
- Provide technical assistance to Supply Chain and Aircraft Records
- Updating databases with aircraft parts interchangeability
- Coordinating with aircraft part suppliers to determine and verify interchangeable components
0-5 years of experience
Systems engineer for GT air inlets, GT exhaust system, turbine hall HVAC, auxiliary boiler and acoustic enclosures.
- Assisted in the balance of plant piping for the Bridgeport Harbor, St. Francis and Chouteau plants.
- Assisted manager of Plant Engineering in development of engineering cost and schedule models for combined cycle projects.
- Developed spare parts list for commissioning and maintenance for gas turbine auxiliaries.
- Developed databases to track R&D and contract engineering activities.
0-5 years of experience
- Cogeneration Power Plant Data Collection System (DCS) and Continuous Emissions Monitoring System (CEMS) programming and trouble-shooting
- Pharmaceutical DCS System programming and design using Delta V software
- Control panel design from interpretation of specifications and P&ID’s using AutoCAD
- PLC and HMI programming using RS View, PanelView, and RSLogix500 software
- SCADA and RTU system’s startup, testing and training for water and wastewater facilities
- Supervised work conducted by contractors and service personnel for construction projects
0-5 years of experience
- Performed reliability allocations and predictions on hovercraft using RELEX software
- Determined failure rates for composite shafting system
- Prepared FMECAs on mechanical components
- Weibull analysis of mechanical systems test data
- Developed reliability and maintainability methodology report
- Prepared reliability program plan for hovercraft
0-5 years of experience
Develop the Test plan for firmware validation of Fiber channel, SAS & iSCSI storage controller which includes E18, E60 + E60x systems.
- Installation of Server -Win 2008, 2003 & Linux O/S & configure 8GB FC, 6GB SAS, 10 GB iSCSI HBA.
- Configure FC network using FC Switch, zoning & ran failover/Fail back test cases, fault injections, Remote boot etc.
- Ran Performance benchmark for SSD, SAS & Sata drives, Drive qualification, Environmental, Shock, power pre-qualification & prepared test report.
- Ran automated test scripts using PHP to configure the system for max. Configuration. Review & updated PHP test scripts for enhancement of system operation.
- Use test tools – IOMETER, IOZone, System debugger, system Performance.
- Ran manual & automated test case & post problems in Census database.
- Track open bugs vigorously & verify after issues resolved.
0-5 years of experience
Project lead on projects, included quoting process, scheduling and maintaining contact with integrators for the duration of the project.
- Design work for simple fixture and build pallets with Solidworks and Catia
- Work with Control Logix 5000 and Microsoft SQL Database
- Performed material flow analysis and process analysis and write up.
0-5 years of experience
Code and debug low level software drivers to interface with new hardware
- Implement diagnostic design for new platform (Colossus). Diagnostics interface to a diagnostic interface (Platypus). Code written in C++ as an object oriented design.
- Wrote diagnostics to test Baseboard Management Controller (BMC). Get System Event Logs (SEL) and Sensor Data Records (SDR).
- Wrote diagnostics to test the power supplies
- Code developed to run on a Linux machine. Development under Ubuntu as the virtual machine on a windows PC. Code developed with Eclipse as the IDE and GIT as the release versioning software.
- Development was on an Intel processor (sandy bridge) with dual core and multithreaded. The diagnostics were developed using an Intel based mother board.
0-5 years of experience
- Mac Office product quality assurance
- Developing automation test tools using Objective C, C#, AppleScript and PowerShell
- MS Active Directory topology and O365/Azure deployment, including PKI, IRM
- Exchange server 2007, 2010, 2013 and O365 configuration and administration
- Windows Outlook Add -in tools for automation and test data
- Manage Internal Linux IMAP servers
0-5 years of experience
Member of core group that supported [company name] version of CAT C15 engine from concept to prototype, to start of production, to end of production, and continuing service
- Facilitate prototype part quotation, ordering, delivery, and evaluation
- Coordinate current product changes for cost reduction or performance improvement
- Address service part issues requiring engineering or manufacturing activities by the supplier
- Monitor engineering lab for issues and information
6-10 years of experience
- Provide guidance and Support on hydraulic Fracturing and Matrix Stimulation
- Ongoing guidance on potential CCS and its ultimate applications
- Guidance on potential application of CO2 Gas/Water injectability
- Production Management Guidance
- Use MFRAC in conjunction with MProd for Fracture optimization
Contract Engineer Skills
Being a contract engineer requires a litany of skills – ones that will help with paperwork, with management, with people as well as with the projects being developed. That is why the skillset for a contract engineer must be vast and diverse, to be hired by any client. Basic social and technical skills are needed, however some of the competences that are specific to contract engineers are as follows:
- Contract management – the ability to draft, alter and draw up numerous contracts for clients.
- Project management – having detailed knowledge within the engineering and contracting business is a must, as it helps in identifying problems, and contributing to solutions related to the project.
- Contractor billing and rate analysis – contract engineers are in charge of calculating the project costs, investments, commercial bids as well as contractor payment and rates.
- Tender preparation – preparing various offers for clients before contractual agreements are set.
- Expert mathematical skills – many of the duties for a contract engineer is calculating projected project costs, commercial bids, tenders as well as salaries.
Contract Engineer Education Requirements
Many job postings for Contract Engineers detail a desire for an employee who has a Bachelor’s degree or equivalent, however they also include that a higher degree would be advantageous. Moreover, there are numerous other requirements that are needed for a contract engineer to be hired, and below are the main ones.
Contract Engineer Salary
The salary for a Contract Engineer ranges between $71,000 to $120,000, with a median salary of $94,600, according to online sources. Of course, a senior contract engineer earns almost double that at certain companies, and so as it is for most jobs, the longer you work, the more you earn.
Additional Compliance Specialist Resources
The following links are blogs, LinkedIn groups, articles and websites all with the aim of helping teach about and discuss the various jobs, duties, responsibilities for contract engineers:
FIDIC Contract Articles – A page containing dozens of articles pertaining to contract engineers and their work within the FIDIC (International Federation of Consulting Engineers)
Contract Engineer LinkedIn Group –This is a group on LinkedIn for Engineers and Contract Engineers alike. Generally, for research and job search for all contract building services professionals and CAD (Contract Appreciation Document) professionals.
Contract Engineer Duties – A very useful article where a contract engineer answered a question by posting, in great detail, all of his responsibilities and duties as a contract engineer.
The Lien Zone Podcast – A helpful podcast about the inner-workings of a construction project, especially from a legal and contractual point of view.
Tips on starting a contract engineering job – This is an article that provides a step-by-step analysis of what a contract engineer should do before and after starting on a new job. Contract Engineering blog – A highly practical and readily used website/blog for all those who are working or wish to work as a contract engineer. Contract Engineering article – A long resource for contract engineers, discussing their usefulness from the point of view of an engineer.