- Featured in:
Looking for cover letter ideas? See our sample Energy Engineer Cover Letter.
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Engineering Resume Samples
Energy Engineer Resume Samples
No results found
0-5 years of experience
Responsible for negotiating and managing energy costs of over $5,000,000 at the four hospitals in the Charlotte region. This included identifying and implementing over $800,000 in utility savings.
- Provided direction and implementation of a 4.3% electrical reduction in kWh/M Sq. Ft. and a 5.4% natural gas reduction.
- Managed ten HVAC and Plumbing associates at Presbyterian Hospital and Presbyterian Orthopaedic Hospital in Charlotte.
- Developed a ten year plan for the utility equipment at Presbyterian Hospital which served as our capital budgeting tool.
6-10 years of experience
Conducted more than 200 energy audits and in-field energy assessments for multifamily buildings applying for NYSERDA Multifamily Performance Program, Weatherization Assistem Program (WAP) and utility programs (Conedison and National Grid)
- Created and executed energy reduction plans and cost savings analysis showing different energy conservation measures (ECMs) based on analytic findings and using software modeling tools, such us TREAT, EA-quip and eQuest
- Identified and quantified energy conservation opportunities associated with building envelope, lighting, EMS, motors, VDFs and heating and domestic hot water systems which approximately 20% energy savings per building
- Led a team of energy auditors in conducting energy audits, savings analysis and developing energy reduction plans for projects with multiple buildings
- Prepared detailed heating system upgrade and replacement specifications incorporating high efficiency systems
- Assisted in budgeting, code compliance drawings, and construction drawings for projects
- Performed feasibility studies and assessments using software modeling tools for solar photovoltaic and solar thermal system designs
- Created curriculum and teach energy conservation classes
6-10 years of experience
Supported plant staff in managing $12M plant utility budget. Designed and managed plant energy efficiency programs while supporting an 18% increase in production. Plant awarded Energy Star “Most Improved” North American GM plant for 2002.
- Optimized electric, natural gas, steam, and compressed air operation reducing consumption by identifying and implementing energy efficiency opportunities
- As energy champion, built Energy Team, communications, energy education and reporting infrastructure driving success
- Designed and implemented Demand Response program delivering 12% demand reduction proving concept for GM US plants
- Managed lighting, BAS and HVAC projects delivered on-time under budget
0-5 years of experience
Responsible for project development efforts for Western Region (CA, AZ, NV, HI).
- Conducted energy audits, gathered data, analyzed utility bills to prepare energy baseline and benchmark against similar buildings to measure scopes of improvements.
- Led and managed engineering team for project development/program management, budget, resource management, and delivery of bundled energy solutions.
- Qualified energy conservation measures for various energy projects through various matrices (simple payback, ROI, IRR).
- Collaborated with M&V team to come up with pre and post measurement verification plans.
- Managed customer relationships and worked with cross-functional teams for managing timelines of project deliveries.
- Prepared business case reports of the proposal for oral interviews.
0-5 years of experience
Coordinated all energy activities for the largest energy usage plant within General Motors.
- Tracked, reported and forecasted $43M per year energy usage.
- Developed preliminary plan for the energy management system.
- Avoided $10,000 maximum per day charge from energy provider by accurately forecasting natural gas usage and demand. Documented distribution of 235 million cubic feet gas usage per month.
- Monitored production equipment and HVAC systems. Audited energy during shutdown periods and took necessary action to correct deficiencies. Reported results to plant staff.
- Analyzed cost and payback of energy-related projects and proposed conservation measures.
- Saved over $400,000 per year in natural gas usage by upgrading the temperature control of 140 heaters.
0-5 years of experience
Provided engineering support for the commercial and industrial energy savings program of PEPCO Holdings, Inc.
- Conducted market research for U.S. energy efficiency and renewable energy programs.
- Compiled competitive intelligence profiles for local, state and federal incentive programs.
- Developed an “Occupant Training Initiative” for the PEPCO Holdings contract. Program offered no-cost, low-cost energy saving strategies based on behavioral actions.
- Served as the liaison between five state utility programs (California, Oregon, Missouri, Maryland and New York).
0-5 years of experience
Developed and researched Radiant heated floor for taller building in Dayton, OH USA.
- Developed Transys 17 model on Solar panel and does energy analysis as well as simple pay back analysis on a project for a community of 200 residential houses at Phoenix, AZ USA.
- Designed and developed skylights and lighting controls for a semi funded public library in Dayton, OH USA.
- Conducted commercial building energy audits and industrial energy audits; developed building energy models using eQUEST and MS Excel; prepared and presented energy assessment reports for clients.
- One year of experience in utility sponsored energy efficiency retrofits for residential and commercial buildings.
0-5 years of experience
Conducted energy audits on a wide range of commercial and industrial facilities for a demand response program working closely with APS.
- Developed spreadsheet for performing analytical analysis on energy usage
- Prepared contract documentation based on data from analysis
- Supported three sales engineers conducting audits and performing analysis
- Analyzed test data for final load qualification of participating facilities