- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Engineering Resume Samples
Equipment Engineer Resume Samples
No results found
6-10 years of experience
Responsible for implementing dicing equipment for isolating miniSMD devices including selection, purchasing, installation and operator training. Specified and installed custom-made shear isolation equipment with vision system. Designed and implemented new snapping isolation equipment.
- Reduced cost by 30%, increased capacity by 6X, and reduced cycle time 50% by successfully implementing new state of the art dicing equipment.
- Doubled throughput of diced part removal by designing and installing custom fixtures at 50% of the cost of a commercial machine.
- Reduced dicing blade cost by $60,000/yr by implementing new “reconditioning process” over purchasing new blades.
- Reduced cost by 30% and improved material utilization 35% by installing a custom made shear to isolate parts from larger panels.
- Introduced, designed and implemented 5 new “snapping”, “isolation machines” for the smallest miniSMD brought to manufacturing.
0-5 years of experience
Diagnosed and resolved system hardware and software issues to increase system uptime.
- Participated in team evaluating new pumps for TEL Tracks which reduced resist waste, thereby saving over $1,000,000 in annual costs.
- Revised maintenance schedules and instituted training resulting in reduction of overall downtime by 5%.
- Led department FMEA project which resulted in less repeat system failures for entire department.
- Implemented full technician training program and wrote maintenance documents resulting in complete self sufficiency on responsible inspection systems reducing department contract costs by ~$400,000 annually.
- Instituted program to sell unusable system parts to third-party refurbishment companies generating over $160,000 in unrealized revenue.
- Participated in Project Management teams to develop plans, designs, specifications, and cost estimates between vendor and customer for installation of new equipment into the factory environment.
0-5 years of experience
Responsible for the maintenance and repair of Photolithography and Metrology equipment.
- Provided technical leadership to technicians and worked closely with process engineering to resolve problems.
- Troubleshot and repaired equipment reducing down time 15%.
- Developed training procedures and certified technicians that resulted in uniform processes and procedures which reduced the average preventative maintenance time from 12 to 6 hours.
- Initiated and developed tool database which provided specific/critical tool information which resulted in reducing informational retrieval time.
- Initiated and championed a network solution for CD-line width and registration metrology tools which enabled all recipes to be tool independent. This reduced downtime and eliminated redundant wafer recipes.
6-10 years of experience
Technically supported new store openings through the selection, development and use of new equipment and by training store personnel in the effective and efficient use of the equipment. This effort helped ensure operational quality and on-time operations startup.
- Developed specifications for a high volume, five flavor chocolate machine. Selected and managed two vendors through final design and production of five prototype machines that are currently being Alpha field-tested.
- Member of a team that designed and developed a new weight driven coffee grinder. New grinder reduced coffee cost and significantly improved product quality.
- Helped a franchisee that was losing a significant amount of winter sales due to store location.
- Designed and developed a new napkin and box dispenser. New dispenser significantly improved employee productivity and efficiency.
- Worked with a vendor to debug and modify a newly designed sugar dispenser. New dispenser is more sanitary and reduced sugar and artificial flavor consumption by 25%.
- Designed and modified high quality food service equipment per customer specifications.
- Prepared Bills of Materials, Routings and release jobs to manufacturing.
0-5 years of experience
Performed project management and project design for tire curing department including waste reduction and quality product appearance. This involved monitoring initial production runs, making adjustments in press settings and attacking high waste molds with detailed troubleshooting techniques reducing waste by 10% and improving productivity, efficiency, and quality.
- Analyzed extrusion process to ensure rubber flow would not negatively impact waste. Worked with compounders to verify rubber properties.
- Supervised 4 mold machinists to inspect and repair all damaged equipment. Coordinated shipment of non-repairable molds to 5-6 selected vendors for further work.
- Managed monthly mold budget for $50K+. Balanced repair of several high waste molds with purchase of new materials and equipment to ensure production was not slowed, while remaining under budget.
0-5 years of experience
Engineered and drove continuous improvement projects on Hitachi Metal and Poly Etch systems within a high volume manufacturing environment.
- Duties included equipment installation, qualification, and technology transfer using copy exact philosophies.
- Defined numerous cost reduction and 2nd sourcing activities resulting in over $5 million in cross factory savings.
- Resolved defect performance issues through manipulation of Voltage Peak to Peak levels on a Microwave/RF etch system resulting in 1 die per wafer of increased yield
- Extended times between preventive maintenance activities through introduction of an improved Oring material resulting in a 2% availability improvement
0-5 years of experience
Designed system upgrades to improve system performance and reliability.
- Trained 8 technicians to maintain and repair ASML Steppers
- Reduced equipment maintenance contract cost by 40%.
- Served as 2nd line support for maintenance and repair of production equipment.
- Led Kaizen teams to improve equipment interface and performance
- Implemented Lean manufacturing practices and Six sigma improvements to production equipment and production areas
- Designed and implemented system upgrades for CVD equipment
10+ years of experience
Managed all phases of network design and implementation projects from conception through delivery. Handled a broad scope of responsibilities, including upgrading, downgrading sonnet rings, network troubleshooting, client relations, team leadership, project planning and delivery and documentation preparation. Worked closely with project teams to ensure all tasks were completed according to established specifications, schedule and budgetary constraints.
- Designed and implemented T0, T1, E1, T3, Optical and GIG-E Ethernet circuits, Sonnet and DWDM rings.
- Designated as a nationwide coverage specialist responsible for supporting AT&T metro city operations and provisioning center for engineering issues and troubleshooting.
- Provided oversight of the technical documentation process to support the management team.
- Served in a leadership role, providing training and support for team members in design and implementation, provisioning and database applications; helped significantly increase overall quality and performance.
- Worked on special/expedited network design projects and client escalations, ensuring the timely and quality delivery of all project deliverables.
0-5 years of experience
Worked closely on the installation of [company name] Mirra 3400 CMP polishers at Fortune 500 client. Served as Active Liaison between [company name] Corporate support, Fortune 500 client’s equipment engineering technicians and their engineering group with installation, design modifications, preventative and operative maintenance which required an aggressive training agenda, Electrical and Mechanical troubleshooting skills, field documentation of tool operation and strong customer relations skills.
- Participated as lead contributor on the Installation and start-up of 8 Mira 3400 polishers
- Initiated and led installation of HSS (Highly Selective Slurry, TI Proprietary) Safety retrofits, requiring coordination between install teams, vendors and the customer in order to meet tight timelines and Scheduled completion
- Discovered, documented manufacturing flaws in slurry drawer design and plumbing and implemented immediate field changes to correct design and ensure fail-safe, correct operation
- Elected Safety Champion for CMP for Fortune 500 client’s site. Worked on safety retrofits, modifications and design issues that placed any personnel in harms way or violated safe work practices
- Certified as instructor for L.O.T.O. and respirator certification including annual renewals
6-10 years of experience
Implemented strategy to provide the best system design to accommodate network changes
- Supervised switch technicians during switch cuts and BSC migration projects resulting in successful complete projects and technicians able to take the next career step
- Mentored junior engineers and increase their responsibility levels as knowledge base increases
- Managed project implementation and equipment maintenance schedules
- Assigned switch metrics and capacity measurements for equipment tracking to maximize equipment utilization within budget limitations
- Coordinate major projects with vendors and local operations within a time line and staying within a budget to ensure timely execution of projects
- Trained technicians during new market launch on task related to site turn-up (T-1 testing, DS0 DACCS connections, physical connections, data fill management, and bandwidth size)
0-5 years of experience
- Extended the PM trigger frequency of Lam Metal HP etch equipment tool set by 50%
- Recommended second source parts, materials, and repair loops through various vendors
- Assisted engineering technicians with equipment issues requiring complex trouble shooting, meeting with outside vendors, and investigated data trends for abnormalities
- Involved in various dept. wide teams to reduce cost through NPW reduction and use various Lean principles to create a better flow for the network driver used by the etch dept
- Established SOP’s for new preventative maintenance procedures
6-10 years of experience
Coordinated equipment repair of 19 Ion Implanters and 18 Rapid Thermal Annealers (RTA).
- Developed Equipment preventative maintenance, safety, and rebuild ISO standard specifications.
- Designed assembly modifications for the Ion Implanter and RTA’s that reduced downtime and COO.
- Directed equipment installation of several Ion Implanters and RTA’s, some with accelerated schedules.
- Created and edited mechanical and electrical drawings using AutoCAD and Solidworks software.
- Performed advanced troubleshooting with the aid of equipment manuals and schematics.
0-5 years of experience
Basic troubleshooting of PLC program using Mitsubishi GX-Developer and HMI using Pro-Face GP-Pro EX.
- Performed preventative maintenance and statistical analysis on equipments from 9 processes for manufacturing EV batteries.
- Led the Line Improvement Project with each process’s production engineers.
- Created and shared Process Issue Reports with headquarters in South Korea.
- Managed Spare Parts Department and led two technical operators.
- Scheduled and participated in meetings with various vendors.
0-5 years of experience
Engineer for 8 inch Class 1 research, development and production facility. Responsible for $67M in capital equipment supporting a 24 x 7 operation.
- Managed the Cu Barrier Seed, FeRAM, PZT and Magcore processes for metal deposition.
- Worked to improve tool utilization, process CP/CPk and 5S practices.
- Increased consumable parts usage by 26%, reducing costs and defect counts by 63%.
- Directed tool creation and modification as required to develop and improve the process and increase throughputs.
0-5 years of experience
Managed four different types of wet etch equipment, total of 20 different machines
- Created and updated SOPs for a verity of semiconductor manufacturing equipment
- Led a team 8 people to solve sporadic and inconsistent problems regarding complicated wet etch tools
- Upgraded wet etch tool hardware and software to solve the problem of false alarms
- Organized a team to purchase and install a new photo resist strip wet bench for a foundry customer