- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Engineering Resume Samples
Facilities Engineer Resume Samples
No results found
6-10 years of experience
Responsible for the overall efficient operation of all plant infrastructures, including, electrical, mechanical, HVAC, boilers, fire and security alarm systems and all essential supporting equipment.
- Managed multiple large capital projects for timely completion within assigned budgets.
- Developed and implemented preventative maintenance program that saved $85,000 in repair costs in the first year for HVAC equipment and increasing equipment reliability.
- Developed and conducted technical training courses in plant equipment and safety.
- Developed high efficiency energy management system that realized a 27% reduction in energy usage.
6-10 years of experience
Developed project scopes, estimates, and schedules for a $250M Air Force Infrastructure Improvement Plan. Responsible for “cradle to grave” project management of assigned plant MEP projects at an 8.5 million sq ft Manufacturing Facility. Served as a Technical POC for plant equipment failures and troubleshooting.
- Successfully executed $20M in capital improvement projects on schedule and under budget.
- Implemented a site wide energy management program to reduce GHG emissions by 25% by 2015. The program reduced operational cost by $1M in 2009 and $3M in 2010.
- Received a Lockheed Spot Award for saving over 20M kWh in 2009 through the design and implementation of various energy reduction projects.
0-5 years of experience
Responsible for an average annual project queue value of $38MM via 8 capital projects.
- Delivered a $21MM, 13 mile pipeline project under cost and ahead of schedule.
- Lean Sigma Coordinator; captured >$4MM in lean sigma savings in 2014
- Led cost and performance business planning activities for project queue, resulting in 92% cost performance index and 86% schedule performance index.
0-5 years of experience
- Led and managed a team of 7 consultants and contractors for a S$10M+ project to convert existing aircraft maintenance hangar to painting hangar. Responsible for the entire project from feasibility study, finalizing technical specifications, engagement of consultants, contractors and vendors, implementation and commissioning.
- Project was completed ahead schedule and achieved a cost saving of 2% with no reportable accident for 90,000+ man-hours of construction work.
- Introduced special air extraction system which saved 75% construction time and enabled painting of all types of aircraft.
- Acted as point-of-contact in coordinating with senior management, operations, legal, finance, safety, tender and custodian contractors.
- Responsible in presenting monthly work progress report to the senior management and CEO.
10+ years of experience
Maintain all building systems including HVAC, chillers, security systems, power sources, climate control, water and lighting.
- Coordinate all scheduled maintenance with impacted personnel.
- Plan on downtime for preventive maintenance.
- Scheduled downtime when necessary for emergency repairs.
- Prepared weekly status reports regarding all on going projects
- Coordinated special projects with stakeholders and vendors to ensure building compliance.
- Developed and maintained good working relationships with seniors, peers and subordinates.
0-5 years of experience
Managed multiple continuous improvement projects to reduce facility cost in the company’s 300,000 square foot start-up retail distribution center in Riverside, CA. These projects included updating facility layouts to optimize work flow and reduce operator travel times, and updating many of the company’s SOPs in order to eliminate non-value adding steps.
- Performed time studies and implemented standards for the facility, to help management track daily productivity and in preparation for worker incentive roll-out.
- Applied projects throughout the facility to maximize inventory location utilization, and to ensure the facility was able to function optimally for peak season. This included negotiating with equipment vendors (Crown, Enersys, etc) in advance to lock down equipment needs, and driving consolidation projects to optimize the use of space.
- Initiated start-up facility projects such as: equipment procurement, building signage installation, as well as researching building codes to ensure that the building and any improvements are within regulation.
- Coordinated efforts with the Middletown, OH distribution center to implement universal safety incentives and methods, to ensure a safe work environment for both facilities.
- Developed tracking tools for management to better visualize the facility’s performance on a daily, weekly, and monthly basis.
- Created forecasting tools and staffing models to assist supervisors with labor planning throughout the year.
- Coordinated with vendors to ensure facility-related issues within the building were dealt with effectively.
0-5 years of experience
Managed operational and capital projects for multiple onshore and offshore installations including safety critical and subsea operations
- Coordinated efforts of a diverse, multicultural team including project controls, local and international logistics, and onsite supervisors and contractors to deliver projects efficiently
- Created high level, conceptual cost estimates for budgeting purposes and further developed into detailed, execution ready estimates to receive authorization for expenditure
- Developed request for proposals for high value, multi-year project and performed detailed bid analysis
- Initiated, assisted, and analyzed studies in order to respond to health and safety audits
0-5 years of experience
- Responsible for property management and plant engineering of one million square feet of administrative, technical and manufacturing space over multiple facilities.
- Managed approximately 30 construction related projects annually. Projects ranged from administrative fit-ups to computer room and manufacturing facilities.
- Reduced annual utility related expenses by $250,000. This was accomplished by implementing energy efficient lighting systems, power factor correction systems and energy management systems.
- Specified and developed a customized facilities management database which tracked all maintenance functions and expenses.
0-5 years of experience
Responsible for space planning and effective utilization of production facilities
- Managed expansion of production facilities and all facility modification/expansion projects
- Spearheaded initiative to utilize custom designed modular trailers as a cost effective means to expand office space
- Project Engineer responsible for construction of $15 million office complex
- Project Manager responsible for construction oversight of $2.2 million Test and Assembly facility
- Implemented and operated Johnson’s Controls 85/40 automated facility ACS system
- Managed and mentored facility maintenance associates
- Created job specifications and managed relationships with third party landscape and custodial contractors
0-5 years of experience
Managed Satellite Facilities projects as assigned; provides technical support to Public Radio Satellite System; supervises and coordinates satellite system shared-use projects.
- Monitored, analyzed, upgraded, and maintained audio satellite delivery head-end system resulting in minimum down-time and increased error-free performance.
- Worked in conjunction with field clients and equipment manufacturer, identified and provided resolution of system performance issues.
- Served on a team that designed, built, configured, tested, and successfully implemented a new plant IP-over-satellite head-end content delivery system resulting in a nearly transparent transition from the old plant to the new.
- Took over the responsibility, from a supervisor stricken with an illness, for the completion of approximately half of the content delivery system, working long hours to ensure the timely completion of the project.
- Upgraded and implemented improvements to satellite delivery system for additional capacity, and improved operator interaction.
0-5 years of experience
Coordinated complicated schedule of moves allowing renovation of existing science center and work on building addition without disrupting class schedule. Saved $500,000.
- Completed $3,000,000 in new construction.
- Repaired a standing seam metal roof on historic structure. Using an elastomeric coating system, the roof’s service life was extended indefinitely. This was the first time the product was used in Charleston. It met with Historic Preservation approval and saved $100,000.
- Responsible for a staff of 20 and facilities management of three campuses consisting of historic, contemporary, and athletic facilities.
0-5 years of experience
Meet with Department Heads, and manufacturing personal to develop programs for existing machine plan layouts, creating better circulation and for existing machinery and new machines coming into work area. Create new floor plan layouts for manufacturing, storage areas, office areas, shipping & receiving and stockroom area
- Developed as builts, bringing the Electronic files up to date.
- Created construction documents
- Assisted client in the development of long and short term planning making sure that all conflicts were resolved within the separate team areas
- Presented planning benefits to department heads through the use of drawing, written presentations, charts and verbal communications.
- Designed possible building concept of expansion using AutoCAD including plans, sections and elevations and renderings.
- Research building codes, updated fire safety and exit plans conducive to this facility.
0-5 years of experience
Saved thousands of dollars by maintaining multiple zones of operation within current OSHA and EPA safety guidelines and regulations.
- Hold a Current Secret Clearance with expiration date of 12/27/2023
- Pioneered changes in connection to a Hazardous Material Storage and Dispersal site, streamlining processes for inventory control, and delivery.
- Procured, stored, received, and delivered materials and substances, of a hazardous, and non-hazardous nature.
- Repaired previously inoperable equipment, with parts sourced from various, other equipment, in inoperable states.
0-5 years of experience
Reported to the Real-Estate Investment Manager. Responsible for serving as lead supervisor, overseeing maintenance and grounds staff at multiple locations.
- Managed facilities construction of a Target Super Shopping Center in Tinley Park, Illinois.
- Created and established a rooftop heating and cooling units Preventive Maintenance Program.
- Established proactive care of investment of over 60 units and budgets.
- Saved the corporation over $25,000 dollars in replacement costs one winter season.
0-5 years of experience
- Led a project for bringing new installed 130 ton Trane Chiller with associated control system online to provide redundancy and allows existing chiller to have a downtime, as needed, for maintenance. Installing a new chiller will provide a reliable source of chilled water while providing additional cooling capacity for future increase in load.
- Generated FMEA for new chiller as well as wrote SOPs for chiller and startup procedure after power restored
- Wrote PM for pumps and chiller
- Wrote and executed IOPQ protocol for chiller and associated Distech control system
- Write IOPQ final report as well as close FMEA report
0-5 years of experience
Plant/Facilities Engineer for a leading mobile, network and defense industry microelectronic device manufacturing and development company. Project included the managing of a 14 million dollar manufacturing expansion as well as numerous tool/equipment installations in support of a new product line ramp up.
- Generate long term and short term capital and operational budgets.
- Worked closely with both internal and external customers during project design phase and equipment installation in order to define, budget and install equipment under extremely aggressive project schedules.
- Consistent top 10% performer in all management reviews.
- Negotiated contracts with subcontractors and oversaw facility expansion project at the TriQuint manufacturing facility in Apopka Florida.
- Manage and provide work scheduling and direction for a staff of 9 full time technicians and 20+ subcontractors on numerous expansion projects.
- Verifiable reputation for consistently completing all projects on time and within budget-personally manage and coordinate all necessary manpower, materials and equipment, and provide daily supervision of progress
- Provide Technicians with round the clock 24/7 support for day to day and maintenance operations of the Central Utility plant, Chill Water System, Reverse Osmosis and deionized water plant as well as the HVAC and Electrical Systems.
6-10 years of experience
Managed and executed plant safety improvement and capital projects including upgrades, major repairs, new equipment installation and commissioning, demolition, and construction of Plant Facilities, operational equipment and building systems. Advised and assisted Facility Area Manager and Plant Leadership in planning, forecasting, facilities risk management and code compliance issues; prioritized current and future engineering / facilities projects; assisted in establishing budgets, manpower requirements, and schedules for short-term and long-term projects.
- Interfaced with corporate and plant leadership, outside consultants, city, state and code officials; prepared and presented project proposals, progress reports, status updates and prioritized short-term and long-term safety and facility projects corporate funding. Submitted funding proposals with necessary supporting documents, preliminary designs and cost estimates.
- Represented Facility Manager in weekly Safety and Risk Management meetings; assisted in safety investigations and inspections; root cause analysis and reporting.
- Implemented plant safety and code-compliance related projects that eliminated hazards associated with new or operational plant equipment and minimized work related injuries. Responsible for Safe Operating Procedures of newly installed equipment and training provisions of plant maintenance personnel.
- Supervised outside contractors and maintenance teams on several in-house, engineering and maintenance projects; provided technical and administrative support during implementation. Executed several projects relative to plant safety and risk management.
- Coordinated the redesign and installation of low-pressure steam distribution piping, resulting in annual energy savings of about $1M in utility bills for the Plant.
0-5 years of experience
Supervised the utility service maintenance force responsible for 400,000+ sq ft manufacturing facility. Maintained the Heating Ventilating and Air Conditioning (HVAC) and utilities including; >1500 tons cooling, >90 AHUs and RTUs, 1800 HP Steam boilers and distribution, de-humidification & humidification, ventilation & exhaust systems.
- Established RFP’s, reviewed all contractor bids, and then awarded contracts for major projects throughout the facility involving roofing, structural, HVAC, plumbing, and parking lots.
- Monitored and reported regulatory requirements for both local municipal and Ohio EPA.
- Facilitated all Fire and Life safety monitoring and coordinated all annual inspections with the state along with quarterly service inspection, potable water backflow testing. Instituted weekly and monthly inspections of all fire suppression systems.
- Coordinated contractors during $700K+ refurbishing project on 4 separate kitchens and several packaging floors. Improved floor durability and safety through removal of all kitchen equipment, demolition of the existing flooring product, setting new floor elevation and installing new safer anti-slip floor coating.
- Maintained roofing to prevent leaks. Reviewed leak reports, investigated the source of leak and coordinated with roofing contractor for repairs. Verified repairs and documented for FDA, BRC, HACCP and other independent audits. Established a plan to analyze the aging roof system and associated decking.
10+ years of experience
Supported class 10, and 100 clean room and FAB, for manufacturing of high tech products in both research and cutting edge medical devices
- Controlled and monitored (BMS), DI water system, process gasses, chemicals, and cryogenics
- Monitored entire building and (HVAC) using (BMS) building management system.
- Managed, reviewed, and approved billing for vendors including security, landscape, exterminator, plumbing, mechanical, construction, and janitorial contactor services
- Supported all aspects of building infrastructures and systems, including Ion systems, clean rooms, office equipment and supplies, as well as furniture procurement and disposition
- Managed and coordinated warehouse moves and inventories
- Performed monthly and annual fire alarm (RFI) systems
- Managed all program related to EH&S, Hazmat, security, confined space
- 24/7 on call, for building emergencies and ERT
0-5 years of experience
Managed the interface between tool deliveries and the rigging company within a green field start up, with more 400 toolsets with no safety incidents or tool damages.
- Managed construction installation; trained planed, evaluated and delegated responsibilities of scope for complete tool installation in Diffusion and Thin Films area.
- Coordinated startup of new systems with Facilities and Equipment Owners while minimizing impact to production and base build construction.
- Conducted field observations for safety compliance.
- Solicited and review competitive bids, recommend contract awards, directed the purchase of owner supplied materials.
- Predict, prepare and observed expenses of operational budget.
- Managed the restructure of work shifts based on tool dock dates to limit the amount of overtime cost.
- Evaluate layout of toolset ensuring best routing possibilities for electrical, mechanical, and exhaust from tool point of connection to facility point of connection.
- Verify and detect clashes in 3D drawings to ensure design package is free of routing conflicts.
0-5 years of experience
Designed preventative maintenance programs to centralize and maximize productivity and building control efficiencies. Developed system control software designed to minimize facility power consumption, lab power effective usage, heating ventilation and air condition systems. Implemented work safety programs.
- Business Development: Direct input to department budget. Qualified prospective employees.
- Leadership Coaching: Enhanced facilitation guides and coached tradesmen.
- Assessments: As part of a team, created daily, weekly and monthly facility equipment log sheets and procedure checklists.
- Research & Analysis: Developed research on industry trends and reducing energy cost.
- Talent Development: Partnering with internal teams to develop best practice strategies.
- Virtual Collaboration: Spearheaded WebEx communications with manager, contractor, and design engineer to review project status and compliancy.
- Client Management: Built sustainable relationships with other department groups to help reduce energy while creating stability equipment environment.
0-5 years of experience
Engineered and supervised installation process equipment tools valued at >$200K.
- Managed and performed $12K preventative and predictive maintenance program
- Responsible for service contracts, contractors and inspections.
- Working knowledge of engineering materials, plastics fabrication processes, assembly processes and design for manufacturability
- Provides prototype/production fabrication and test support to both R&D and Product Development
- Responsible for SKYDEX safety program, including program development, updates, corrective actions, training and enforcement
- Maintains detailed, accurate records, and prepares necessary reports with skilled use of Microsoft Office Suite software
6-10 years of experience
Overseeing the building’s plumbing, air condition units, boilers and fire panels.
- Maintained the building grounds.
- Monitored the company cleaning service through out the building.
- Inspection of elevators and reported when they are in need of service.
- Direct point of contact for building tenants; reconciling their complaints.
6-10 years of experience
Responsible for safety engineering, environmental engineering, and property management.
- Managed natural gas purchasing on a competitive market.
- Implemented cost saving projects concerning lighting, water conservation, and mechanical heating efficiencies.
- Handled installation of pneumatic compressor equipment.
- Oversaw roofing projects.
0-5 years of experience
Manage plant maintenance repair and PM activities for multiple sites in the Mid-Atlantic region.
- Perform Lifecycle Analysis of plant equipment and manage the Long Term Maintenance (LTM) projects at assigned sites. Budget for 2013 projects – $1.5MUSD.
- Project Engineer for all new build and remodeling construction activities on sites. Budget for 2013 projects – $8.6MUSD. Major project – $6.9MUSD expansion of corporate offices for Volvo Sales NA. Project was certified LEED Silver.
- Prepare budget requests for facility related projects and present narratives to management for approval.
- Manage Facilities Management (FM) contracts at the sites; housekeeping, cafeteria service, landscaping, and site security. Annual value of contracts – $1.7MUSD.
- Conduct studies of site utility systems to ensure sufficient capacity for proposed projects and present recommendations for upgrades to meet future requirements.
0-5 years of experience
Created engineering spreadsheets to calculate process requirements
- Constructed database for safety control valves
- Analyzed pressure safety valve system on platform
- Developed recommendations from on analysis
- Performed Process Hazard Analysis (PHA) on platform topside
- Completed Sub-Sea HAZOP studies
0-5 years of experience
- Responsible for 3000gpm high purity water treatment system in a 300mm semiconductor facility.
- Investigated incidents to root cause, and provided recommendations.
- Managed small to medium-scale capital investment and redesign projects.
- Improved safety and quality of facilities operation.
- Completed various operation cost reduction projects. – Awarded by president.
- Implemented performance monitoring system and standard operating procedures.
- Developed and executed test plans for impeccable change point management.
- Experienced in handling all phases of project management.
- Managed a $44M large-scale retrofit project on a 24/7 operating facility.
0-5 years of experience
Led the company through a broad range of operational expansion and engineering activities including new machinery placement, shakedown and production run-offs, facility layout, and site and project management.
- Led wall-to-wall layout of Fabrication, Welding and Boring bar areas for the new North of Rawson facility with no down time and no interruption of customer orders.
- Conducted lean manufacturing training and project initiation at North of Rawson facility.
- Determined feasibility of designing new plant equipment or modifying existing equipment and facilities considering cost, available space, time limitations, production planning, energy considerations and other technical and economic factors.
0-5 years of experience
- Evaluated process performance through liquid and vapor hydrogen sulfide sampling using a LaMotte Kit and MSA H2S Gas Detector and conducted field analyses for the Odor and Corrosion Control Program
- Reviewed and cataloged CCTV inspection data that identified sources of inflow and infiltration
- Performed QA/QC for liquid chemicals (calcium nitrate, ferrous chloride, and magnesium hydroxide) to verify product quality in meeting the specifications and operating guidelines for the collection system
- Assisted OCSD engineers with facility repair projects by evaluating data and providing summary reports in written and graphical form using AutoCAD, OdaStat, and Microsoft Office
0-5 years of experience
Medical Machine Shop
- Implemented, managed, and maintained preventative maintenance system for large cnc manufacturing facility.
- Primary point of contact for all systems in facility including access control, climate control, and hazardous materials.
- Managed new equipment installation as well as troubleshooting and repair of existing equipment.
- Managed small group of machinists to refurbish interior of building.
- Directed maintenance staff on day to day activities to reduce downtime of equipment and resources.
0-5 years of experience
Managed day to day maintenance and operations of facilities in Biddeford, Me and Columbus, Oh
- Was responsible for all equipment and building upkeep (total of 6 buildings, 142,000 sq. ft)
- Provided engineering expertise for equipment failure analysis
- Facility project coordinator for the new Town of Biddeford Air Ordinance. Responsible for demonstrating full compliance with new threshold limits and verification of all information pertaining to the permit application.
- Developed and implemented a preventative maintenance program
- Installed several pieces of process equipment, with projects ranging up to $200K
- Developed a long term capital improvement plan
- Supervised all maintenance personnel and contractors
0-5 years of experience
Facilitated uninterrupted operation of building support systems.
- Performed preventative maintenance on general lab systems equipment.
- Orchestrated moves of laboratories and offices.
- Coordinated renovation projects with outside contractors.
0-5 years of experience
Respond to, investigate and resolved all facility requests in a timely manner and insured proper follow up was done
- Provided direction, instruction and guidance to facility maintenance technicians and outside contractors
- Responsible for operation of the building automation systems including fire alarms, chillers, cooling towers, and HVAC equipment to ensure efficient operation
- Maintain safety goals for the facilities team and outside contractors by ensuring safety awareness to company procedures
- Maintain service records, manuals, as-builds, blueprints, checklists and daily operation logs
- Oversee building service contracts including janitorial, construction, and landscaping
0-5 years of experience
Managed several General Plastic and Composite facilities as a Facilities Engineer/HSE Manager. Read and interpreted blueprints, technical drawings, schematics, and computer generated reports daily. Monitored and met with contractors daily. Performed EHS Inspections and Assessments. Developed EHS Programs and awareness throughout the facility. Reviewed and recommended contacts and cost estimates. Overseen installation, operation, maintenance, and repairs to ensure that equipment was installed and functioning according to specifications.
- Monitored and assessed facilities and HSE budgets
- Worked with manufactures of Mazak, Campat, Haas, Kingston, and Doosan machines
- Utilized Microsoft Project to plan facility and machine moves
- Analyzed Health and Safety regulatory requirements, OSHA standards, and compliance audits
- Implemented plant preventative maintenance programs
- Deigned maintenance strategies, procedures, and methods
10+ years of experience
Provide engineering services to manage capital & major expense projects and sustainable engineering for facilities support systems (Chillers, Boilers, HVAC, Compressed Air, Ultra Pure Water, Bulk Chemicals, Wastewater Treatment, Bulk Chemicals). Continually reviewing and prioritizing engineering work orders, addressing complaints, resolving conflicts, and solving problems to ensure safe and maximum reliability of people, equipment, systems, buildings, and grounds. Plan, design, and coordinate expansion and renovation of facilities, coordinating activities of engineering layout, design, and construction, while ensuring compliance with applicable laws, regulations, statutes, and codes.
- Project Manager for tool installations, clean room modifications, HVAC modifications, and utility modifications.
- Developed and managed five year forward rolling capital and major maintenance plan for boilers, chillers, cooling towers and other major infrastructure.
- Developed and managed chilled water & heat recovery capital projects for energy savings of $520K/yr.
- Refrigerant Compliance Manager
- Managed pressure vessel permitting and inspections.
- Siltronic Pioneer Award for successfully guiding Fab 1 Chiller Cross Tie project.
- Siltronic Sustainability Success Award for CAED reuse.
0-5 years of experience
Responsible for manufacturing engineering projects and facilities engineering
- Installed $150,000 production parts washer and parts feeder system
- Developed specifications for $350,000 production paint finishing system
- Managed 120,000 sq. ft. office renovation, including furniture moves and cost control
0-5 years of experience
Managed CAD Operator to develop and maintain company-wide AutoCAD files
- Developed of conceptual space plans, scoping, and specification plans
- Managed Telecom Analyst and daily telecom administration, maintenance, and project
- Designed, specified, and managed physical security and surveillance systems
- Coordinated with key stakeholders to research and design mixed use office and lab space
- Provided management support for facilities and office staff in coordinating office moves and continuing service
- Developed conference room A/V systems and implement training for IT staff
- Coordinated with IT to specify, design, and implement physical networking infrastructure
0-5 years of experience
- Managed various construction projects and move activities related to the construction then relocation to a newly constructed 350,000 sq. ft. medical device R&D and GMP manufacturing campus.
- Managed facilities related projects, tenant improvement projects, and updated AutoCAD drawings for both new building construction and existing building projects.
- Managed the Honeywell environmental data monitoring system – installed, programed, tested, performed PM, trained staff, and coordinated calibration and validation when necessary.
- Maintained SOPs and quality management system documentation pertaining to the Facilities Department as well as participated in quality audits by the FDA and ISO.
0-5 years of experience
Worked as Cooperative Education Student
- Performed walk downs of facility to identify areas that were not in conformance with ADA Code
- Maintained configuration management by updating Auto CAD drawings of office layouts after renovations
- Assisted with maintenance of HVAC Systems by replacing Hepa Filters, replacing and greasing pumps, and pressure washing caliche build up on cooling towers
- Developed a check list for maintenance workers to use to identify roles and responsibilities of each worker for routine maintenance activities to minimize production downtimes
- Validated Mahaffy Harder’s, Hooper, and Rotary Vac packaging equipment used to package medical devices
6-10 years of experience
Responsible for daily and preventative maintenance, and repair of boilers, chillers, cooling towers, plumbing systems, emergency power generator, electrical systems and fire life safety systems.
- Monthly preventative maintenance and testing preformed on medical gas monitoring system
- Maintenance and repair of Hill-Rom hospital beds and Stryker hospital gurneys
- Maintenance and repair of Rauland-Borg hospital nurse call system
- Monitored and assisted with inspection and repair of FLS systems
- Responded to any equipment failures necessary for patient care and safety.
- Responded to patient service request
- Implemented lead engineer position to further assist director of facilities with daily operations, scheduling projects and training of new staff.
0-5 years of experience
Implement standards, policies and guidelines for data center layout/design and environment management. Research issues with policies. Review existing standards to ensure accuracy.
- Provide Project Management or project support all facilities related projects involving changes to IT facilities and/or equipment installation/de-installation.
- Coordinate with other Infrastructure and Operations teams to ensure data center activities are implemented on schedule.
- Manufacture and install data center compliant cabling (Cat5e, Cat6, fiber)
- Manage and complete hardware installations including: shelves, power strips, rails, cable management, servers, and other equipment.
- Manage and complete hardware decommissions while update and maintain facilities connectivity diagrams and equipment elevations in Aperture and MS/Excel.
- Update and maintain asset (equipment) information in Aperture and Remedy.
0-5 years of experience
- Developed piping specifications following ASME B31.3, 31.4, 31.8 and NACE MR0175
- Simulated various scenarios regarding compressor stations, pipelines, and plants in VMG simulation
- Conducted ESD vent studies through VMG simulation per API 521
- Managed multiple projects as project manager which included scope development, cost and schedule
0-5 years of experience
Responsible for ensuring the overall operation and maintenance of all electrical, mechanical, and HVAC equipment for Bank of America’s Data Center Operation’s Mission Critical Facilities, which includes stand-by diesel generators and related fuel systems, 3 phase electrical systems that include but not limited to switchgears, UPSs, PDUs, wet cell batteries and associated systems, CRAC, centrifugal chillers, cooling towers/water chemical system, air handlers and associated systems, pumps, & motors.
- Direct concurrent engineering projects both technical and project management aspects for capital projects while ensuring their success in meeting their respective objectives.
- Technical aspects include HVAC, Electrical Power and Lighting, and Automation.
- Support the Maintenance and Facilities functions including corrective and preventative maintenance and repair of facilities, utilities and equipment.as well as ensuring the facilities comply with all local, state, federal, and corporate guidelines related to health safety and environmental functions.
- Support Validation with the planning and execution of commissioning and validation protocols.
- Support Deviation, Risk Analysis, Root Cause Analysis and other Quality Systems.
- Develop and maintain standard operating procedures and other procedures for installed systems.
- Support and comply with engineering standards, drawing controls, project controls and other procedures and standards necessary for the successful operation of the department as well as the creation and maintenance of the same.
0-5 years of experience
Project engineer Large Mining Truck Test & Repair Area ($1.4 M)
- Project engineer for shipping & receiving dock remodel project ($1.2 M)
- Lead engineer for annual roofing construction projects ($1M+ / annual)
- Department liaison for BROWZ safety program
- Design engineer for lifting devices, racks, stands, etc
0-5 years of experience
- Specified and compiled data sheets for instrumentation on offshore facilities
- Completed an instrument gas study for an offshore facility
- Compiled ABS Submittals for Deluge Systems, Firewater Systems, General Arrangements, Area Classifications, NRTL Certificates, and Marine Systems for a SPAR facility
- Completed hydraulic calculations and reports for additions to deluge systems on multiple
- Consolidated pipe specifications for numerous offshore facilities into a standard pipe
6-10 years of experience
Manage the repair efforts of mechanical heating and air conditioning systems for 30 county buildings. And to support other Engineers with the other 100 building in the county. Buildings include recreation centers, libraries, performing arts centers, indoor ice rinks, and all government office buildings
- Plan and execute projects for replacement and add-ons of boilers, pumps, chillers, air handlers, system controls, package units, evaporative coolers, furnaces, VAV systems, pneumatic systems, and unit heaters.
- Develop maintenance schedules; work with dispatchers and accountants on work orders and billing procedures.
- To communicate with facilities directors concerning the needs of their building, and what projects needed to be done.
- Manage van stock and improve supplier relations.
0-5 years of experience
Perform maintenance on HVAC system, and assist in maintenance on support equipment such as Uninterruptable Power Supplies, Static Transfer Switches, Diesel Generators, Electrical Distribution Panels and remote monitoring equipment.
- Perform daily walkthroughs and monitor the data centers through a remote program using Automated Logic Control.
- Perform periodic tuning of temperature sensors and PID’s through ALC.
- Write and update Normal, Emergency and Maintenance operating procedures.
- Creating internal audit system to comply with SOC3 requirements.
- On call 24/7 to respond to emergencies, currently working the Graveyard position.
6-10 years of experience
Coordinate all data center contracted services, tracking services though our online tracking system.
- Worked on the commissioning to OneNeck’s 3, three meg Caterpillar generators, switch gear and 900 kva UPS systems.
- Assisted in the commissioning and of OneNeck’s N+1 evaporative cooling towers.
- Extensive knowledge of building operating systems, Security, Engineering, HVAC, CMMS, FM 200, Preaction, EPO, Vesda and Water detection
- Co-manage all building services contractors, HVAC, Plumbing, Security staff and Electrical.
0-5 years of experience
Responsible for 8 commercial buildings totaling 500,000 sq ft of Retail and class “A” historical commercial buildings.
- Responsible for electrical, energy management systems, generator back-up systems, HVAC, elevators, plumbing, sprinkler system, domestic water, chemicals, and EPA/OSHA compliancy.
- Hands-on over all site maintenance, testing and inspection.
- Responsible for scheduled maintenance and repairs for tenants/base buildings and tenant improvements.
- Responsible for budget forecasting, cost savings, capital improvements and preventative maintenance forecasting.
0-5 years of experience
Responsible for the 100% uptime of (4) 200 ton chillers
- General maintenance and monitoring of FE-227 fire suppression environment
- Functional responsibility of Pre- action systems, PDU’s, PDE’s, APC IRC’s, 30 CRAC units, dry cooler farm, glycol pumps and heat pump loop for comfort cooling
- Oversee functional operation of 100K square feet of building space, with 20K of raised flooring
- Full working knowledge of building monitoring systems specifically Automated Logic and Johnson Controls
- Management of onsite Vendor interaction