- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Engineering Resume Samples
Engineering Intern Resume Samples
No results found
0-5 years of experience
Worked with the Continuous Improvement and Operations teams for the Joint Reconstruction division
- Proposed and led an engineering team of ten through a process improvement project, applying Lean A3 methods, to improve the traceability and sustainability of inspection tooling while maintaining a 100% calibration rate.
- Analyzed Minitab to determine sample size and capability when developing validation procedures for internal system changes on Manufacturing equipment
- Reviewed FMEAs for each department to create control plans, which intended to simultaneously empowered the machine
- Worked with machine operators to improve manufacturing processes in order to reduce the number of non-conforming parts
- Initiated new lean manufacturing projects upon updating outdated department process maps
0-5 years of experience
Designed a web tool to enable online simulation of all the Analog-to-Digital Converters (ADC) and Digital-to-Analog
Converters (DAC) products parts.
- Configured old 200 ADC products to the application which Clients were still interested to buy.
- Conducted a research on Domain Specific Language (DSL) and their applications to the Models, written in XML.
- Formulated Python Scripts to automatically update the ADC product Datasheet and to extract information about the Properties from the Header (.h) and Source (.cpp) files to generate a DSL code based on the information extracted.
- Coined Functional Groups for the ADC and DAC products, devised a code which internally reads the Functional Groups and creates a Tree Structure in the UI Memory Map View.
0-5 years of experience
- Studied and improved periodic and emergency maintenance of HVAC units at the gathering centers.
- Collaborated with technicians in the dismantling, maintenance and installation of 200 KVA diesel generators.
- Constructed a FMEA with guidance from shop floor control, resulted in improved quality and safety of shop-floor processes.
- Conducted observation and analysis of personnel to determine time and motion requirements of job duties.
0-5 years of experience
- Designed a centralized oil lab designed to analyze 70,000 samples per year, performed calculations of equipment and working hours required to process the 20,000 more samples per year
- Worked on a team to identify hazards that Morenci Concentrator workers encountered, then controlled or eliminated identified hazards to greatly increase employee safety throughout the concentrator
- Performed Root Cause Analysis of catastrophic failures throughout Morenci Operations, gaining knowledge of failures associated with conveyor systems, crushers and mining heavy equipment
- Created an excel spreadsheet to organize data associated with vital mine equipment that would show
0-5 years of experience
- Assisted designers with Model Based Definitions and created drawing release packages for various nacelle programs for Engine Build Up group
- Designed fasteners for design community across the Aerostructures business unit
- Managed standard fittings and connectors using Electrical and Tubing Workbenches within CATIA V5
- Participated in Design & Supplier management for Systems/Equipment Engineering group
- Aided designers in preparing presentations for PDR and CDR meetings for EBU and Equipment Groups
- Evaluated extended life for equipment components for legacy aircraft including latches, electrical harnesses, actuators, hoses, and ducting
- Taught new interns to use CATIA V5 to model Standard Hardware for design community at UTAS
0-5 years of experience
- Established detailed and precise Equipment Specific Hazardous Energy Control Procedures for various equipment, scenarios, and reasons for lockout to aid in Lockout/Tagout procedures
- Streamlined the work permit process
- Established Safe Work Instructions detailing situation specific safety precautions, procedures, and required permits for the construction of a facility entrance and driveway
- Created and revised P&IDs for manufacturing equipment and processes, utility piping, water purification system, etc.
- Updated infrastructure drawings, including the basic blueprint and a customizable building drawing which could integrate individual detail or utility drawings into a single comprehensive drawing
- Revised evacuation plans for emergency procedures
- Developed a plan to update all facility piping labels to abide by [company name] Cooperate Procedure for Occupational Safety
0-5 years of experience
- Led time studies on yarn production operations (spinning/winding, doubling, and twisting) and developed methods to increase production and efficiency, minimize non-value added time, and increase ergonomic safety in order to determine the expected efficiency per process, per shift through updating Job Specification Sheets.
- Monitored and analyzed workflow, processes, and procedures and developed solutions in order to resolve bottleneck areas to maximize efficiency and productivity.
- Developed outlines for efficiency enhancements and generated improvements to reduce waste through the different yarn production operations.
- Tracked supply room inventory and recorded into Jomar software.
0-5 years of experience
- Supported the Maintenance Manager in a variety of tasks
- Drafted 2-D AutoCAD Schematics to facilitate future installations
- Performed a plant wide Safety Audit, photographing and documenting all sources of concern, creating a company safety catalog
- Analyzed Yearly Expenditures, categorizing costs and determining areas of heavy spending
- Reorganized Company Asset Filing Systems (both paper and electronic)
0-5 years of experience
- Modified and updated electrical lighting/power design work using AutoDesk Revit
- Communicated with project leads to obtain information required to process the review and design
- Performed voltage drop and short circuit analysis for single line diagrams of electrical systems
- Reviewed submittals to ensure compliance with NEC, Title 24 specifications and standards
- Assisted the senior engineer/designer in processing RFI’s and Change Orders
- Completed construction administration and field investigation tasks for assigned projects
0-5 years of experience
- Analyzed and investigated 320 data trend sheets in order to improve spray machinery performance
- Executed two experiments in order to analyze puffer performance
- Created a technical inspection manual that educated workers on how to troubleshoot potential problems
0-5 years of experience
Ensured production of high quality nacelle parts according to standard work
- Modified, optimized and monitored manufacturing in the miscellaneous fabrications department working with other engineers and over 60 machinists
- Proficient in SAP and Teamcenter along with other manufacturing programs
- Trained new associate engineers in SAP, Teamcenter and manufacturing processes
0-5 years of experience
- Performed CNC modeling and programming using Siemens NX software and Vericut by CGTech
- Developed Labview program and assisted with hardware configuration in force measurement
- Aided in machine vibration frequency spectrum analysis utilizing DC accelerometers
- Developed algorithm for in-process improvements of CNC hole drilling accuracy using a laser
0-5 years of experience
- Became familiar with characteristics of transistor technology used in memory components, primarily floating gate transistors used in non-volatile “flash” memory (NAND).
- Collaborated with design engineers to become proficient with their MySQL product testing data.
- Built a web app (PHP) with dynamic forms for users to retrieve and plot desired test data.
- Observed techniques and procedures used by coworkers to validate performance of NAND components for use in new products.
0-5 years of experience
Capco Inc. is a Prime Contractor for the US Department of Defense and high volume manufacturer, producing machine
gun mounting systems, small arms and ordinance components, and electro-explosive devices.
- Saved over 5 man hours per week on the company’s most established product line through Kaizen events
- Analyze data through statistical process control charts and by conducting hypothesis, normal distribution, and process capability analysis tests
- Train and supervise first shift quality assurance leads in quality control documentation and developing reject
- Developed value stream maps of product lines for future Kaizen events
- Write specifications for internal processes that meet the standard of the quality assurance manual and military
0-5 years of experience
- Undertook the preparation of quantity take-offs, engineering drawings, maps, and other related graphics as required for construction.
- Assisted in reviewing design documents, detailed plans, specifications, cost estimates and monitoring contractor’s compliance with projects’ scope and standards.
- Assisted Project Manager in obtaining state and local permits by coordinating with review agencies.
- Conducted engineering research and provided technical assistance.
0-5 years of experience
Contributing member of corporate comprehensive safety audit to reduce risk of on site accidents
- Extensive quality control testing on high quality silica sand to meet customer satisfaction
- Prepared yearly product data summaries
- Conducted daily safety meetings with hourly employees
0-5 years of experience
- Designed a database using PostgreSQL to track products throughout their lifecycle allowing
- Developed a PHP database management system which used the SOAP communication
- Assisted in development and debugging of an Android application which used Bluetooth to connect to a prototype device
0-5 years of experience
- Developed device that utilizes ultrasonic bone conduction to aid communication in high-noise areas
- Learned new software and hardware used as testing equipment
- Analyzed and presented results of research and testing
0-5 years of experience
- Developed an excel program to automate the review of transmission outage
- Reviewed and updated the addition of tie lines and major projects in EMS database
- Created tools and applications to expedite the validity checks of the modeling work
0-5 years of experience
- Performed final audits in Quality Engineering department on various automotive parts prior to shipment
- Performed heat treatment effect studies on new part being launched to assist machinists in creating
- Assisted in fixture design to more easily load part into Coordinate Measuring Machine improving
0-5 years of experience
- Updated and Documented a Hazardous Area Classification of the unit
- Updated P&IDs of the complex Cooling Water system, and Waste Water system of the unit
- Collaborated with contractors in Cooling Water flow studies, reducing Turnabout budgets and increasing equipment’s’ lifespan
- Analyzed logistics and costs of turnaround preparations through procedure writing
- Contributed in the debottlenecking of fugitive emissions
- Lead the day-long Co-op plant tour in Texas City Operations
0-5 years of experience
- Pilot plant operation for the North System Renewal Treatment Plant to rebuild to 250 MGD plant. Pretreatment comprised of 2-stage rapid mix, 3-stage flocculation, and sedimentation with inclined plate settlers. Goal was to obtain higher filter loading rate for GAC and anthracite, deep bed filters and determine the benefits of incidental biological filtration versus conventional filtration through analyzing filter data. Jar testing was completed to try to optimize the pretreatment.
- Wrote the pilot report to obtain higher filter loading rate from CDPHE and prepared the presentation that gained verbal approval for the higher filter loading rate.
- Worked on design of a non-ionic polymer feed system and compared alternatives, cost, and schedule for construction.
- Reviewed construction drawings and specifications, and conducted water treatment plant design calculations to confirm sizing of the full scale plant versus the pilot plant.
- Evaluated the velocity gradient and tip speed of flocculators mixers and alternatives for redesigning the mixers, impeller versus paddle type mixers, for optimization of mixing.
- Created a macro program in Excel to automate the creation on monthly filter profiles.
0-5 years of experience
- Cooperated in research under the guidance of internship advisor within the Materials and Structures division
- Determined universal compliance testing methods and documentation techniques for application to threaded
- Presented findings of compliance study to peers, government employees and military officials in an auditorium
0-5 years of experience
- Implemented backend/middleware of the company’s product analytics website.
- Wrote stored procedures with SQL Server Management Studio to retrieve data from database, and modified data retrieval functions in php
- Helped ensure client side retrieval of data with ajax calls and wrote unit tests in javascript
0-5 years of experience
Analyzed mechanical drawings for information concerning various projects.
- Worked with Senior Maintenance Engineers in the development of tools/processes to facilitate maintenance personnel.
- Learned the process and procedures of performing Non-Destructive Testing (NDT).
- Initiated Ultrasonic Testing (UT) PM plan of steel pipes for dozens of turnout structures along the 336 mile long canal.
- Advanced technical writing skills as a result of compiling and summarizing UT data into company reports.
0-5 years of experience
- Gained experience in all aspects of a custom injection molding facility including project management, process engineering, tool room/mold making, quality control, and sales
- Completed laser marking project to reduce amount of rejected parts
- Performed several PFMEA to assist in quality control and adhere to ISO-9001:2008 standards
- Attended daily production meetings to gain understanding of the manufacturing process and provide input on current status of work in progress parts
- Assisted project managers to design for manufacturability and provide quotations for customers
- Participated in customer meetings and sales calls to gain business insight and strategies
- Worked alongside process engineer to gain understanding of machine startup and troubleshooting
0-5 years of experience
- Created a detailed mass balance and reactor monitor for the Unisar operating unit
- Made a more detailed, user friendly update of the refinery product specification report
- Assisted in FCC Turnaround by inspecting the fractionator column
- Went through training for confined spaces, fall protection, refinery safety, alkylation safety, safe work permits, and attended weekly safety meetings
0-5 years of experience
- Created Text-Overlay to replace current Video Overlay Unit
- Overlay to replace current Video Overlay Unit
- Programmed using Verilog and a FPGA (Field Programmable Gate Array) board
- Tested Onboard Analog-Digital Chip for IRIG (Inter-range Instrumentation Group) time capabilities
0-5 years of experience
- Performed time studies to determine the duration and reason of down time.
- Worked hands-on with maintenance staff to manually repair and install new machines.
- Started and completed a preventive maintenance program to help reduce asset failure.
0-5 years of experience
- Conducted time observations on assembly lines
- Created standardized work procedures for building machines on the assembly lines
- Implemented production plan using historical data and standard time from observations
- Designed assembly line to increase efficiency based on time observations
- Re-distributed tasks on assembly lines to reduce bottlenecks
- Used AutoCAD/Inventor 2012 to create plant layout and laser programs
- Updated and corrected Bill of Materials to reduce excess inventory and make the ordering more accurate
- Issued Engineering Change Notices for changes to procedures and bill of materials