- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Engineering Resume Samples
Piping Design Engineer Resume Samples
No results found
0-5 years of experience
Designed and modeled routing systems for piping, conduit and hoses for locomotives.
- Modified existing steel piping and electrical conduit designs to allow for new automated pipe bender using 3D CAD programs Solid Edge/NX.
- Integrated and problem solved new routing software into pre-existing design processes.
- Developed new piping products that reduce assembly time of fuel piping by an estimated 50%, eliminating regular maintenance and minimizing failure.
- Created and maintained technical specifications, engineering work instructions, as well as “Best Practices” documents for modeling, drafting, and design.
- Experienced in creating Bill of Materials (BOM).
- Demonstrated thorough knowledge of tooling limitations, production sequence, and design for Manufacturing.
0-5 years of experience
Main resource for pipe support design and analysis using FEA and Mathcad software.
- Designed plant piping based on pipe stress analysis using Caesar II pipe stress software.
- Successfully passed Process Layout and Piping Design Level 3 Course.
- Researched information on layouts, equipment, components, and supplies by utilizing specific reference materials to utilize best product at optimal prices.
- Translated code regulations and specifications to meet or exceed parameters in reference to building qualifying designs for use.
0-5 years of experience
Designed new chemical process piping systems for clients in various industries
- Designed modifications to existing process piping systems
- Performed Stress Analysis on a variety of piping systems, including glass-lined and Teflonlined pipe
- Produced General Equipment Arrangements, Orthographic, Elevation, Detail, and Isometric drawings for clients
- Worked closely with clients to ensure new piping systems met all process requirements
- Produced and updated Piping and Instrumentation Diagrams
- Surveyed client’s facility prior to start of design for modifications to existing equipment
0-5 years of experience
Performed pipe wall thickness calculations according to ASME Codes, B31.1 and B31.3.
- Calculate thermal expansion and pipe stress base on design/operating temperature and pressure.
- Designed pipe support on the vessel to support over size pipe such as pipe larger than 24″.
- Provided pipe loads data to pressure vessel department to perform WRC107 (local stress analysis) to ensure pipe load do not over stress vessel wall.
- Determined the location to place thermal expansion valve or thermal expansion loop to eliminate large pipe load.
- Developed piping material specifications for process and utility services.
- Specified valve selection, branch charts, flanges, gaskets and bolting for piping design.
- Preformed difference analysis on various specifications and come up a specification deviation and to be used in quotations and purchasing.
- Supported the development of Piping and Instrumentation Diagram (P&ID) by assigning material specification and line numbers.
- Created piping dimensional databases to support 3Dpiping design and support piping design departments for 3D plant design review.
6-10 years of experience
Utilizing AutoCAD 2D and CADworks 3D to develop pipe spool drawings for shop and field fabrication of utility and process cooling water systems for new and modified steel plants. Acquire material take-off from schematic diagrams and designs. Redesign plant layout in the field at customer’s request.
- Prefab pipe sections resulting in at least a 70% time saving on installation.
- Prefab pipe supports resulting in a 60% time saving on installation.
- On site CAD station setup for immediate design modification of plant layout due to interference’s encountered during installation.
0-5 years of experience
- Designed pipe layouts for projects in the oil & gas industry by using International Codes & Standards (ASME B-31.3).
- Site inspection of Bharat Petroleum Corporation Ltd. (BPCL) petroleum product tanks in storage terminals pertaining to its fire safety involving fire water lines / foam lines, fire water pumps and sprinklers.
- Presented a gap analysis report on the BPCL petroleum storage terminal highlighting its existing firefighting capacity and the code required capacity as suggested by Oil Industry Safety Directorate (OISD-117).
- Managed and co-ordinated the technical data transfer and provided support to Indian Oil Corporation Ltd. (IOCL) for the 3D modelling project of LPG and propylene storage tanks in their refinery.
0-5 years of experience
- Train-4 Liquefied Natural Gas Project of TSKJ.
- Headed three (3) piping and equipment layout senior designers for detailed design of slug catcher and cooling water piping systems.
- Supervised three (3) field piping engineers for piping pre-fabrication and installation.
0-5 years of experience
- Prepared Project deliverables in compliance with international standards (API, ANSI, ASME, ASTM, BS etc.)
- Prepared AutoCad drawings for the various facilities project such as renovations and new constructions.
- Involved in Front End Engineering Design, Detail Piping Drawing of As built facilities and upgraded drawings.
- Generated Materials take-offs
- Developed relevant work procedures and standards with relevance to Project Management Plan.
0-5 years of experience
- Developed isometrics and BOM, prepared piping registration packages, and data books
- Model equipment and pipe routing using PDS
- Conduct stress analysis on critical pipes using CAESAR 2
0-5 years of experience
- Piping Design Engineer
- 3D modeling of piping and equipment according to the field laser scan for SALMAN offshore oil platform (PP3). To complete the process it is necessary to joining LFM and AVEVA PDMS software
- Mark the differences between design and construction by checking the 3D construction model and final approved P&ID
0-5 years of experience
- Developing Piping system (Pump station, Control Station, relief, Pipe rack, Scrubber piping system, etc.) and instrumentation and controls, Material specification, Pump selection ISA Instrument Data sheet, Valve Data sheet and applicable calculation.
- Developing Sequence of operation as per project and generating P&ID based on sequence of operation.
- Lead the drafting personnel to create customer submittal and fabrication drawings.
- Project meeting consist of schedule milestones, customer information submittal documentation requirements and project budgets and cost.