Responsible for reservoir engineering duties for the 400 wells in the West Block of a 1500+ well field including using the “40-acre tools” to ensure the most economic wells were being drilled based on incremental production, updating decline curves, economics, decision tree analysis, analyzing offset well performance, and well reviews
- Performed a comprehensive lookback on slickwater versus gel completions to determine which parameters drove success in different parts of the field. This resulted in a 15% in 30-day IPs in DownDip area of field.
- Implemented a process for incorporating the 40 acre tools into pre-spud individual well analysis with the development of a tool known as “OptiDoc”
- Monitored and evaluated the optimal drilling depth into the Mesaverde in the West Block area to ensure a minimum 20% rate of return
0-5 years of experience
Conducted studies to estimate hydrocarbons in place, forecast reservoir behavior and serve as a basis for special studies and programs designed to maximize gas recovery in assigned reservoirs
- Worked on data of well test, production, completion and logs to get accurate input for reserve estimations, production forecasting and economic assessment and made the evaluation runs
- Analyzed well production performance and provided reservoir engineering support to assist completion engineering design and programs
- Assisted in planning yearly production operations to realize the production forecasts developed for the budget cycles
- Involved in preparation of programs and execution of well testing operations to agreed programs in a safe and efficient matter as well as interpretations
- Monitored and executed slickline operations, opened hole formation testing (MDT and XPT) operations, cement bond logging and perforation operations (TTP and TCP) on site
0-5 years of experience
Responsible for building and executing the development program for over 15,000 acres in the Eagle Ford
unconventional play. Worked collaboratively with drilling, completions, production, projects, geoscience,
land, legal, finance groups to plan, implement, and develop the asset.
- Presented and obtained approval on 30 development projects (totaling over $200 million in capex) in 2014 with a projected 11,000 MBOE in added reserves
- Performed economic analyses to maximize the value of infill development plans
- Prepared production forecasts and provided production optimization support
- Evaluated well performance and performed reserves analysis and booking
- Developed and applied decision and risk analysis techniques to projects in M&A opportunities
- Analyzed competitor completion, production, and sequencing trends to evaluate proposals
- Created area production profiles and identified potential facility constraints
0-5 years of experience
Performed volumetric calculations of oil and gas reserves for the assigned thirty-four (34) fields.
- Evaluated the viability and economic worth of oil and gas well drilling prospects.
- Identified, proposed and drilled nine (9) new wells and eleven (11) workover candidates.
- Selected and field installed flow lines, separators, dehydrators, flow meters, valves, flow lines, and gathering lines to pipeline.
0-5 years of experience
Coordinated with Senior Advisor of Reservoir Management Group to acquire and study data of core analysis for KG basin reservoir.
- Worked with a team of geologists and engineers to analyze and compile core data for all wells to determine hydraulic units and flow
- Developed porosity and permeability correlations from hydraulic unitization, which will be further used to predict permeability and porosity of interval wells.
- Completed core analysis study by assigning hydraulic units to wells and provided correlations for prediction of poro-perm values in interval wells.
0-5 years of experience
Led field depletion and development planning for over 50,000 acres and more than 1 Tcf production of South Texas Lobo Trend Fields.
- Boosted behind pipe reserves by 5% via generating and scheduling hundreds of project opportunities including remedial, recompletion, and new drills; supported pilot projects for new technology deployment, including identifying and selecting well candidates for chemical treatment, plunger lift and field production optimization.
- Managed inventory of field opportunities (greater than 400 BCF) for farm-outs and, acquisitions and divestures (A&D) opportunities.
- Forecasted production for over 500 wells for annual reserves reports.
- Conducted production data and well log analyses; oversee production allocation for field performance monitoring and statistical analysis of type curve determination.
- Identified over twenty refracturing projects based on vintage completion evaluation using data analytics and production drivers.
- Collaborated with geology, land, production, facilities, and regulatory departments to reconcile and advise leases, right of way (ROW) and mineral rights for recompletions and Plugging & Abandonment (P&A) operations.
- Generated economic model scenarios for project evaluations and feasibility of new drill and recompletions.
- Led and supported production allocation efforts, annual lease reviews and annual reserves reporting processes.
- Participated in peer assists and peer reviews to review workflows adapted for field depletion planning.
0-5 years of experience
Utilized CO2 EOR (Enhanced Oil Recovery) flood method to provide reservoir engineering and technical support as a key member of an asset management and optimization team in the Permian Basin
- Conducted well testing which included design, analysis and recommendations (Injection Profiles, Step-Rate Testing)
- Selected, evaluated and designed appropriate conformance jobs for well injectors
- Performed well enhancements utilizing chemical treatments and stimulations to improve performance and productivity
- Designed procedures for well tests to comply with regulatory requirements
- Gathered and managed data for pattern allocations, surveillance, and field historical production analysis
6-10 years of experience
Drilling and workover exploitation of acreage in the Delaware, Anadarko, Southern Wyoming, Uintah, and Powder River Basins. Applied drilling technology, reservoir management skills, waterflooding, financial evaluations, log analysis, planning and budgeting of funds, corporate reserves assessment, and appraising sales, trades, and acquisitions.
- Managed corporate reserves for the Texas Panhandle entailing 900 PDP’s, 170 PDBP’s, 170 PDSI’s, 180 PUD’s, 970 PBUD’s, & 740 PSUD’s. 270 of the PDP’s were horizontal wells.
- A 2013 LOE evaluation identified billing errors resulting in a $230,000 credit to FOC.
- In 2011, recommended 7 Granite Wash Horizontal New Drills: 60 MMCFPD & 1150 BOPD, 28% ROR, & NPV of $18.4 Million
0-5 years of experience
Collected and analyzed completion and production data of horizontal wells in the Eagle Ford.
- Determined key to optimize production and created type curves.
- Analyzed effects of well down spacing on productivity of new wells.
- Developed a workflow that can be use to evaluate the impact of well down spacing and determine optimum well spacing.
- Run economics of leases to determine whether to drill more wells or farm out.
- Evaluated potential of new leases.
0-5 years of experience
- Designed an advanced lower completion for Statoil that enhanced long-term reservoir performance expectations of deepwater wells in the North Sea by an average of an extra 30,000 barrels of oil and 50,000 less barrels of water per well over fifteen years
- Taught internal classes regarding integrating reservoir engineering and data interpretation to field and sales engineers globally
- Successfully replicated ENI’s complex reservoir production profile of a producer/injector pairing in the North Sea into Petrel software suite and engineered a completion that enhanced production expectations by 200,000 barrels of oil and reduced produced water by 600,000 barrels
- Created detailed technical product reports for the Baker Hughes lower completions department and external customers
- Resolved an extensive sand-control problem faced by Devon for an onshore well in Oklahoma with a failing electric submersible pump and wire-screens by reengineering the integrated production system
- Recommended an alternative completion for Shell Malaysia that saved the customer over $400,000 by successfully proving a variable inflow control device configuration that outperformed a uniform system
0-5 years of experience
Evaluated drilling prospects for S. Michigan reef play
- Developed reservoir field study for S. Michigan reef play
- Project Engineer for East Texas field waterflood with 100 wells
- Evaluated open hole and cased hole well logs
- Designed and supervised Cotton Valley fracturing treatments
- Prepared workover procedures and AFE cost estimates
- Designed and implemented acid treatments for injection wells
0-5 years of experience
Developed frac hit impact study and derived correlation to forecast production loss and recovery time for impacted wells
- Wrote VBA program to create Excel interface to forecast production loss and recovery time being used by department
- Worked with multiple departments, engineers and vendors to design continuous gas lift system from scratch for onshore wells
- Built models and simulated wells to estimate time until artificial lift was required & economics of implementing gas lift & rod pump
- Presented several projects with Murphy reservoir and production engineers to managers for future implementation
0-5 years of experience
Developed frac hit impact study and derived correlation to forecast production loss and recovery time for impacted wells
- Wrote VBA program to create Excel interface to forecast production loss and recovery time being used by department
- Worked with multiple departments, engineers and vendors to design continuous gas lift system from scratch for onshore wells
- Built models and simulated wells to estimate time until artificial lift was required & economics of implementing gas lift & rod pump
- Presented several projects with Murphy reservoir and production engineers to managers for future implementation
0-5 years of experience
Coordinated and supervised reservoir engineering activities
- Reviewed economic and budgetary plans and advised on plan improvement prior to development of oil fields.
- Evaluated and reviewed reservoir studies conducted by oil companies and consultants
- Attended bi-annual technical meeting between NOC its subsidiaries, and subcontractors.
- Attended special jobs (e.g., well testing, DSTs) in new oil fields and modified the testing
- Estimated reserves, forecast production and recommended improvement to facilitate oil
0-5 years of experience
- Reservoir engineer for the Byron and Garland fields located in northern Wyoming (Big Horn Basin). Very experienced in water and CO2 flooding techniques along with other methods of secondary and tertiary recover.
- Responsible for planning most of the field engineering work (pump changes, planning frac jobs/perfs, monitoring fluid levels, etc.)
- Analyzed and monitored current field performance (using ARIES, OFM, DSS, Eclipse, and DIMS), determined locations for vertical/horizontal drill wells, generated, designed, and implemented work-over/rework projects, conducted pressure transient testing. Also managed pipeline and turbo machinery work.
- Composed the fields’ budgets, managed multiple field projects, and handled cost accounting for millions of dollars in capital and expense spending throughout the year.
- Utilized TERAS (stochastic economic evaluation) and MS Excel to determine the economic viability of future projects.
- Trained on Eclipse and Qualified Reserve Estimator for [company name].
0-5 years of experience
- Conducted reservoir engineering studies including analytical and simulation techniques in order to provide the technical assessment necessary for decision making
- Analyzed production performance data in order to improve well performance and assisted in planning remedial well activity as required
- Led a team and collaborated with members to accomplish a mock-industry project
- Represented my group at technical meetings
- Documented technical work in a clear and timely manner conforming to requirements
- Won an ‘A’ Excellency for the final defense
0-5 years of experience
Prepare volumetric and reserve reports for quarterly, MY and EOY reports
- Managed company-wide recompletion schedule
- Maintained and updated forecasts for Gulf of Mexico shelf properties using decline curve analysis and volumetric calculations
- Nodal analysis and worst case discharge calculations
0-5 years of experience
- Conducted reservoir engineering analysis including decline curve analysis, production forecasting, pressure transient analysis and material balance.
- Predicted fluid contact movement, pressure and future rates.
- Estimated and validated STOIIP and estimated certain reservoir and aquifer parameter.
- Extracted and interpreted well tests, generated tubing lift curves and calculated water and gas conning.
- PVT characterization of reservoirs (used to build VLP/IPR models).
0-5 years of experience
Constructing dynamic flow simulation models, history match and prediction cases to optimize alternate development/depletion strategies
- Building and characterizing reservoir simulation models of oil and gas fields by utilizing 3D geologic models and geostatistical techniques for uncertainty quantification and associated risk modeling
- Conducting studies on development optimization, identification of techniques to increase well production/reserves and management of complex petroleum reservoirs
- Characterizing and building simulation models by utilizing 3D geologic models and geostatistical techniques in model construction
- Conducting Improved Oil Recovery project evaluation in conjunction with reservoir management teams on domestic and international projects
- Documenting technical results, development plans, communicating in lateral and vertical manner
0-5 years of experience
Reservoir engineer responsible for quarterly and annual reserves review working for 5 fields with hydrocarbon in-place volumes of over 2 Bstb and 130 drainage points:
- Conducted studies to estimate the volume of hydrocarbons in place, review of recoverable
- Carried out reservoir simulation studies that include reservoir data collection and evaluation,
- Carried out reserves estimation, economic evaluation, reserves reporting and documentation in line with U.S. Security and Exchange Commission (SEC) requirements and guidelines for SPDC
- Participated, presented and defended the technical and economic evaluations at SEC reserves
- Responsible for submission of production forecast into the annual business plan and documentation for assigned fields.
0-5 years of experience
- Supervised a 3-man group. Coordinated reserve certification studies at DeGolyer & MacNaughton providing studies to justify increase in reserves by 500bcf &10mmstb. Assisted in reserve certification meetings with Japanese buyers/ D&M/ Union/ Pertamina/Total that initiated the Bontang LNG plant expansion. Recommended unitization parameters and weighting factors to increase the company unit share by 200bcf and 4mmstb.
- Represented Company on Pertamina committee (EKGRMC) for all operator reserve (15tcf) based LNG revenue allocation. Analyses justified increase in company’s revenue by $30 million/year over the 20 year contract.
- Managed subsurface studies, data acquisition, well tests and reservoir/fluid descriptions. Directed history matching, building/updating of reservoir models to optimize development drilling (min. wells with zone prioritization) and recoveries to meet the 20year LNG feed gas demand of 900mmcfd. Analyzed EOR potential for Pamaguan.
- Evaluated reserves and economics of inactive S. Sumatra PSC resulting in renewed drilling.
- Prepared Huffco US 3-year Business plan that provided basis for initiating the US E&P subsidiary. Evaluated Texas/Louisiana operated fields and managed non-operated production. Petitioned FPC and negotiated pricing and deliverability with pipelines. Testified before TRC.
0-5 years of experience
Initiated and filed appropriate environmental forms to complete new and repair old disposal wells.
- Restored to production a dually completed well, which had been shut in for 10 years, flowing 80 barrels of oil per day and 400 thousand cubic feet of gas per day.
- Saved $150,000 in workover costs by running an externally plastic coated string of tubing.
- Applied for, testified at the hearing and received a special Texas Railroad Commission allowable for a deep gas well.
0-5 years of experience
Consulted as an independent contractor providing reservoir engineering input and continuity for a newly merged
reservoir management team.
- Determined recovery factors for oil and gas reservoirs in a company asset evaluation.
- Forecasted oil and gas field production profiles.
- Estimated oil, gas and condensate volumetrics.
- Estimated net present value (NPV) of multiple fields in several company audits.
6-10 years of experience
Conducted SAGD well spacing study, evaluated the optimal well spacing to achieve better economic results on future pad development
- Completed SAGD well end effect (toe and heel) study to determine steam chamber growth beyond both ends and produced oil by using numerical simulation and 4D seismic anomalies, this work increased current reserve/resource estimation results.
- Performed simulation using CMG STARS to support gas wells associated with bitumen shut-in application, demonstrated the detrimental effects of reduced gas cap pressure on SAGD performance
- Performed simulation study to support thief zone (top water and top gas) clustering work, through single well pair layer cake model simulation, generated CSOR verse 11 thief zone variables scatter plot to define thief zone categorization, finished over 600 simulations, the results were used in production performance forecast and improved its accuracy
- Participated in Oil Sands asset development planning, including delineation, lease retention, development opportunity, and economic analysis
- Worked closely with geologist and geophysicist to support business development opportunities, including resource evaluation and SAGD performance forecast for land acquisition
- Created industry SAGD OFM database in Athabasca and Cold lake areas, provided a very useful tool to observe and compare other companies’ SAGD projects performance, extremely helpful for production analog study and transfer of learnings
- Completed reserves and resource assessment in Oil Sands property by using probabilistic tool and Volumetric Method
- Completed top gas wells communication analysis in Christina Lake 1C&1D to determine how many wells in each gas pool and how much air/gas should be injected into the gas zone, in order to re-pressurize gas zone above SAGD formation
- Determined re-injection flue gas/air amount needed by gas zone re-pressurization and water zone de-watering
- Investigated CO2/H2S contamination on top gas zone caused by SAGD production for Surmont pilot well pairs, generated CO2/H2S concentration vs operating pressure plot, determined the relationship, the results is very useful for CO2/H2S emission monitoring.
0-5 years of experience
Responsible for reservoir engineering aspects of the company including economic evaluations, reserve reporting, budget forecasting, and monitoring well proposals.
- Provided quarterly reserve reports for interfacing with parent and sister organizations
- Participated in presentations to potential investors/buyers of company assets
- Company proved reserves grew from 5.8 MMBOE to 7.7 MMBOE during tenure.
0-5 years of experience
Provided all necessary reservoir engineering and economic analyses for Forest Oil’s acquisition of Rocky Mountain oil and gas assets.
- Responsible for quarterly and year-end SEC reserves for assets in the Uinta, Green River, San Juan, and DJ Basins.
- Worked closely with DeGolyer McNaughton reserve auditing firm to assure that property valuations were reasonable and not understated.
- Developed production type curves from analogous producing wells to determine and book proven behind-pipe and proven undeveloped reserves.
- Completed Post-Drill Evaluations to compare actual investment returns to those used to authorize the original capital expenditures.
- Monitored under-pressured and underperforming properties. Worked with production and field engineers to install and improve artificial lift, enhance recovery, and restore profitability.
6-10 years of experience
- Designed, executed and analyzed static and dynamic (core flooding) laboratory experiment tests to evaluate and optimize waterflood recoveries and Enhanced Oil Recovery (EOR) technologies including chemical flooding and other developed technologies (e.g. Polymer, Alkaline and Surfactant flooding ASP/AP, foam, Water Alternated Gas injection, gels, tracer’s injection) to support operational decisions, improve operations and enhance the recovery process for different conventional reservoirs in Venezuela.
- Provided technical support in the trace components sampling (oil and water), analysis and measurements as part of reservoir monitoring program carried out to evaluate performance of the Alkali/Surfactant/Polymer Single-Well-Chemical Tracer (ASP-SWCT) field pilot test implemented in Maracaibo’s Lake, Venezuela.
- Participated in a research study for conventional and heavy oil reservoir candidates to evaluate the opportunity to develop Enhance Oil Recovery technologies, forecast reservoir production and technology performance using the analytical models PRIze and SWORD for western Venezuela reservoirs.
- Performed fluid water and oil sampling for Bachaquero reservoirs and Maracaibo Lake area, Venezuela.
- Performed laboratory tests and reservoir numerical simulation using CMG commercial reservoir simulator to evaluate the technical opportunity to implement electromagnetic heating (MW/RF) with the addition of hydrogen donors for the heavy oil “in situ†upgrading for Hamaca crude oil, Orinoco Belt area, Venezuela.
- Co-mentored summer students in reservoir numerical simulation and laboratory experiments in enhanced oil recovery techniques including thermal and chemical recovery processes.
0-5 years of experience
- Analyzed infill well potential of gas reservoir in San Juan basin
- Applied new analysis method to shale gas reservoir and coal-bed methane reservoir
- Compared the infill well potential across the field and determine the optimal infill drilling areas
- Reported the results of my analysis and recommended the infill drilling areas for new wells
- WPX got the approval to drill infill wells in their field based on my results
0-5 years of experience
- Helped engineers on analyzing the operating expenses, and evaluated of reserve reports
- Coordinated, performed quality checks, and managed client data bases
- Provided ARIES support on data file economic set up for preliminary evaluations forecasting.
- Incorporated prices decks, standard risk weighting, and hedging cases.
- Build banking scenarios and settings parameters. Global editing, run Match, Base and Risk cases
0-5 years of experience
- Determined appropriate artificial lift methods including plunger and GL and generated long-lateral uplift model for Cana Woodford operations utilizing nodal analysis techniques.
- Applied Aries to determine optimum infill time with NPV calculations based on interference.
- Created Excel charts to track infill flow-back against type-curves and daily drilling metrics including ROP and expense, and presented results with variance statistics to Engineering VP.
0-5 years of experience
- Wrote Excel macros to graph all production data
- Created casing diagrams from historical data
- Prepared injection well profiles & analyzed waterflood performance
- Analyzed production and injection graphs by zone to observe well work opportunities
0-5 years of experience
- Conducted risk-adjusted economic evaluations and reservoir production simulations on prospects across the risk spectrum.
- Led initiatives to identify high potential company and non-company operated prospects for acquisition.
- Assembled and sold to other operators packages of marginal company-owned properties.
- Participated in development of the Division’s multi-year financial plan and presentation to senior management.
0-5 years of experience
- Performed technical and economic analysis to justify a $50 MM heavy oil expansion project. Carried out multivariate statistical analysis of historical data to forecast future field performance and reduce project risk.
- Managed daily operations of gas and heavy oil assets, in a variety of company ownership positions. Performed thermal reservoir simulations to determine optimal use of steam throughout the resource to maximize oil recovery while minimizing steam and assist in hedging gas purchases and oil production nominations. Developed long term plans for management of the assets.
- Reservoir management of a gas reinjection project to increase liquids recovery in a condensate field. Performed compositional reservoir simulation, pressure transient analysis, fluid analysis and traditional analytical reservoir analysis to monitor field recovery.
- Provided engineering and economic analytical support for Central Alberta Deep Basin exploration efforts.
- Successful supervision and mentoring of engineering co-op and summer intern students.
0-5 years of experience
- Determined geomechanical properties required for hydraulic fracking design of Iquiri Basal formation (Devonic) for TTR 4 well
- Contributed with reservoir engineer in nodal analysis of TTR 4 well before and after stimulation
- Attended training courses in handling of Petrel software and log interpretation
- Presented results in a formal presentation to management
0-5 years of experience
SPEAR – Strategic Planning, Environmental Analysis, & Reserves. Provided an interface of financial and reserve reporting between the corporate board and the business operations unit.
Forecasted future production and recommended optimum development plans. Set up capital
spending forecasts associated with those development plans.
- Managed Non-Op and non-core budget and audit.
- Knowledge and application of SEC guidelines and reporting procedures.
- Set up group to provide performance analysis of reserves and provide operational changes.
- Reviewed Non-Op assets for participation and monitor for on-going performance.
- Wrote queries to streamline data acquisition from SQL databases.
0-5 years of experience
- Collected, weighted, and updated prior well data with more recent test and field findings.
- Performed multiple analyses on several reservoirs to solve for its possible shortcomings.
- Incorporated different loss models (% Injection, Pressure loss) over several years to determine the fields potential inventory and its future deliverability.
- Discussed new operational procedures with field operators to increase performance and potentially give a better understanding of the reservoirs.
- Presented my findings and made recommendations on how to improve reservoirs efficiency to upper management.
6-10 years of experience
Use of pattern management techniques to maintain profitability of patterns.
- Identified injector conformance issues and work with Conformance Engineers to design treatments such as expandable casing and polymer gels.
- Prepared production forecasts through the use of dimensionless curves.
- Prepared quarterly production forecasts for the SACROC Unit.
- Calculated zonal recoveries of different flow units to identify potential bypassed pay.
- Prepare monthly list of WAG (water-alternating-gas) injectors to be switched.
- Used pattern balancing methods to maintain MMP (minimum miscibility pressure) and optimize sweep efficiency.
- Scheduled pattern activations to expand the CO2 operations of the SACROC Unit.
- Analyze step-rate tests to calculate parting pressure and injectivity index.
0-5 years of experience
As a staff Professor at [company name], the main university of Venezuela and one of the main universities of Latin America, I performed the following activities:
- Teaching and mentoring at Petroleum School of many subjects like: Immiscible displacement, reservoir simulation projects using ECLIPSE100, Reservoir simulation and modeling, permeability upscaling techniques, PVT properties, and papers reviews.
- Evaluator Jury of undergraduate research projects at Petroleum School.
- Professor Representative of the Society of Petroleum Engineers (SPE) Chapter of [company name].
- Teaching at Statistic School of Mathematics subject like: basic calculus, revolution solids, topology.
0-5 years of experience
Provided technical support for thermal recovery methods using ECLIPSE and PETREL to PDVSA and different segments inside [company name].
- Responsible for making technical presentations about [company name]’s heavy oil technologies such as ECLIPSE thermal, high temperature ESP, etc.
- Basic model using PIPESIM software for steam injection calculation and well pressure drop losses.
- Developed different heavy oil consulting projects using thermal simulation and economical evaluations.
0-5 years of experience
Worked on thermal reservoir engineering simulation for a number of pilot projects applying state-of-the-art industry technology with a view of commercial development of unconventional oil & gas resources
- Worked on a field development plan for an extra-heavy-oil field (Grosmont) in Northern Alberta, Canada
- Was involved in providing guidance and making evaluation of geomechanical coupling to the thermal reservoir engineering simulator STARS for improvement of recovery from unconventional resources.
- Conducted history matching studies for the purpose of developing predictive model
- Engaged in reservoir performance forecasting
- Conducted well-test analysis using Pansystem to understand the flow regimes & permeability evolution that affected fluid transport on electrical heating of oil shale of Piceance Basin
- Modeled recovery efficiency of the processes that affected fluid recovery from unconventional reservoirs
- Coordinated laboratory studies to compare static and dynamic rock properties
- Familiarized with Schlumberger’s Petrel software for development of a geological model of the reservoir
- Simulated a freezewall model to arrest water flow during an in-situ conversion process
0-5 years of experience
Responsible for maintaining and updating corporate database used to publish biannual reserve report.
- Utilized DCA (performance forecasting), reservoir volumetric calculations, log analysis, material balance, and price differential forecasting to evaluate and book O&G reserves for new completions and newly made acquisitions.
- Forecasted operational expenses based on corporate lease operating statements.
- Retooled gas collection and allocation model for legacy Tom O’Connor field in South Texas.
0-5 years of experience
- Core data compilation and analysis of six wells.
- Pre-production calculation of reservoir parameters Kh, skin for 18 wells.
- Analyzed build-up data obtained during planned production ramp-up.
- Worked with G&G team for modeling of two satellite fields.
- History matched one year pressure data of Complex channel-levee structured Dry gas field.
- Drafted Initial development plan of four satellite fields.
- Monitored three well clean up operations on Deep Water Frontier.
0-5 years of experience
On-field training and responsibilities to take control on hydraulic fracturing field operations.
- Performed reservoir studies by decline curve analysis, material balance, and pressure transient analysis.
- Support production engineer to plan hydraulic fracturing operations in a tight gas reservoir.
- Performed rate transient analysis of fractured wells to improve fracturing operations for the field.
0-5 years of experience
Raw data analysis into useful production and completions information for further evaluation via Excel and Access.
- Analyze and evaluate remaining reserves of a mature oil and gas field in the Permian Basin.
- Uncovered areas of high production potential and unexploited areas of interest.
- Presented 63 total recommendations of unexploited areas for wells and field to Reserves Manager, Geology Manager, COO, and CEO of company.
- CEO approval of project and told to presented it to Exploitation Department for utilization on future ventures in the field.
6-10 years of experience
- Lead a research team for $1,763,315 US-DOE contract titled: Study and Pilot Test of Preformed Particle Gel Conformance Control Combined with Surfactant Treatment
- Executed laboratory and field tests of chemical EOR and conformance improvement techniques for field development in southeast Kansas
- Co-author papers, technical reports and research proposal
- Won outstanding Ph.D. student award for 2013
- Lead Society of Petroleum Engineer (SPE) student chapter to win the Golden Standard award
- Excellent written and verbal communication skills
- Ability to work on multiple assignments and influence others
0-5 years of experience
Evaluated decline curves and assisted engineers in determining year-end reserves for Marcellus assets using OGRE
- Identified wells experiencing a decrease in production caused by the frac of an offset well or “frac hits”
- Developed diagnostic techniques to calculate the potential EUR and financial impact of major frac hits
- Presented final conclusions in Pittsburg to the upper management team from all office locations
0-5 years of experience
- Utilized lab-scale data from USC in order to determine the ideal downhole pressure and to reduce compaction during natural gas production from shale
- Developed Visual Basic modeling tools in order to determine downhole pressure based on well-head conditions, and in order to maintain a steady downhole pressure
- Designed monitoring procedures in order to estimate multiphase flow from individual wells based on intensive properties of the fluid as it travels through the well-head chokes
0-5 years of experience
- Build the reservoir simulation model (Eclipse 100) for new discovery reservoir, then do the sensitivities and prepare it for coupling model.
- Evaluate new producer/injector wells target together with geologist, geophysicist, petrophysicist, and production engineer.
- Deliver IOR projects (subsea separation, boosting and injection (SSBI), waterflood, water alternating gas (WAG), evaluating gas lift in riser modeling, increasing gas injection, lowering separator pressure).
- Wellbore modeling (Prosper and OLGA ABC) on multidisciplinary project reservoir gas influx modeling in dynamic pressure control (dynamic killing procedure).
- PVT modeling, compositional gradient, Black Oil PVT (BOPVT) table for Eclipse include negative compressibility evaluation and BOPVT for Prosper.
- Do economy analysis (STEA) for increasing gas injection project.
- Deliver SEC and NPD (for IOR) oil and associate gas booking and reserves reporting.
0-5 years of experience
- Perform Geo2Flow analysis to look for reservoir compartments, identify the possible free water elevations, and model saturation and permeability. Analyzed fields in Angola, Middle East, Colombia, Australia, Gulf of Mexico, and North Sea.
- Set up projects for training courses using the field and laboratory data provided by clients. Interact actively with the clients to gather data, and then QC it to make them aware of any discrepancies.
- Test the beta versions of Geo2flow, and recommend improvements.
- Provide real time support to international clients through Webex sessions.
- Document training manual for standalone version of Geo2flow
6-10 years of experience
Evaluated partner proposals for new drill and remedial well work. Made appropriate recommendations to Management.
- Provided reserve estimates and rate forecasts for annual reserve report.
- Co-lead project engineer for fast-track offshore production platform. Reviewed and awarded contracts for construction and installation. Ensured that deadlines were met to meet construction schedule.
- Engineering intern.