- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Engineering Resume Samples
Senior Project Engineer Resume Samples
No results found
6-10 years of experience
Technical Lead on a winning $80 million proposal to the US Army which incorporated contributions from 5 major sub-suppliers and completed within the extremely short 6 week window allowed.
- Created and managed multiple projects simultaneously (Microsoft Project), including scope, strategy, budget, and critical paths, that spanned up to 12 months and completed them up to 1 month early.
- Lead Engineer on multiple programs with oversight of diverse technical teams, complex technical data packages, 700+ parts, and 20+ suppliers.
- Prepared and conducted Customer Presentations, Program Reviews, IPT Meetings, status reports, and weekly telecoms for internal and external customers.
- Led a cross-functional failure investigation (RCCA) team to develop and execute a corrective action plan that proved the weapon system met Key Performance Parameters, thus exonerating over $20 million of existing product.
- Developed and implemented preventive actions that increased on-target accuracy by 36%.
- Improved manufacturability and reduced cost of 50+ detail parts by modifying dimensioning techniques using GD&T and increasing tolerances within acceptable limits, resulting in reduced cost.
- Performed PFMEA’s, DFMEA’s and risk analyses on existing and new products and incorporated process improvements and risk mitigations that reduced manufacturing time by 28%.
- Managed multiple suppliers and priorities to coordinate production efforts, resolve issues, and improve business relations.
- Managed an Access database to track discrepancy reporting.
- Worked directly with government customers to create concise reports that provided substantiation for product improvements and/or justification for “Use-As-Is” dispositions.
0-5 years of experience
Managed and directed corporate projects in multiple plants throughout USA and Mexico providing engineering,
manufacturing, quality, safety and environmental oversight of $300MM+ automotive Tier-2 company, manufacturing
forged and machined components for commercial vehicle OEM and service markets. Successfully relocated business consolidations/closures, capital purchases and VAVE projects within budget and schedule.
- Coordinated new product design reviews, VAVE evaluations, design changes and sales RFQ’s.
- Achieved product improvements in heat treating and machining for Tier-1 and Tier-2 totaling over $14MM.
- Issued capital equipment analysis for new and rebuild equipment, negotiating contracts and directing installation.
- Researched new processes and conducted pre-production evaluations, resulting in $750K to $3MM CAPEX.
- Reviewed and assigned ECCN designations for export of equipment from U.S. to Mexico.
- Conducted technical presentations for sales, engineering, quality and supply chain corporate objectives.
0-5 years of experience
Managed safety, regulatory and cost reduction projects in accordance with facility budget, schedule, and industry best practices.
- Led design efforts for hydrogen sulfide scrubbing and removal system for in-ground and enclosed API Separator.
- Served as senior process engineering lead for plant-wide steam and condensate system improvement project. Collaborated with plant management, outside engineering resources, and plant operators that ensured the most cost effective design was achieved.
- Managed installation of new blast resistant control room that met all FM Global requirements and ensured operator safety.
- Designed new, optimized sized hopper for bulk solids addition to 4 reactor systems, reducing cycle time and manpower required.
0-5 years of experience
Provided oversight in the design, analysis, and documentation of military and commercial aircraft component modifications, repairs, and upgrades. Conferred with engineers and customers to discuss existing or potential engineering projects and products. Utilized computer-assisted engineering and design software to perform engineering tasks.
- Provided the design and development processes and new technologies for the repair and maintenance of parts and complex electronic, electrohydraulic and hydraulic assemblies.
- Participated on reduction of actuator turn-around-time from 24 to 6 days; saved 40% per actuator.
- Designed, implemented, and improved electrical instruments, equipment, facilities, components, products, and systems for commercial, industrial, and domestic purposes.
- Inspected completed installations and observed operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.
0-5 years of experience
Managed business relationship with customers for manufacturing projects. Oversaw technical review of contract specifications and order changes. Provided technical direction to support personnel in
Drafting/Design, Purchasing, QA, Production Control, Manufacturing, and Shipping. Administered all
facets of projects from order entry through shipment including final payment and expiration of warranty. Generated/authored departmental formal engineering work instructions.
- Served as senior engineer for the company’s top customer.
- Engineered majority of the product group’s largest and most complex projects.
- Served as technical advisor to engineering staff in generating formal design standards, procedures and work instructions.
- Increased department efficiencies by designing 30% of managed projects.
- Developed & implemented protocol to facilitate supply of major products to Russia. Managed of 100% of projects for Russian customers/installations.
0-5 years of experience
Identified engine component improvement needs through customer service reports and participated in onsite engine inspections
- Managed matrix organized teams of 5 to10 members on component improvement programs for the F100 engine
- Coordinated vendors’ efforts on providing hardware and design improvements to component improvement projects (CIP)
- Led a technology development program for the F135 to reduce component weight by 20%; developed project requirements including: vendor selection and qualification, schedule and budget
- Delivered monthly progress briefings and design reviews to the Program Office and quarterly to US Air Force review board
6-10 years of experience
Functions as primary client contact for all new contract implementations nationwide, recommending strategies and initiatives to ensure delivery of exemplary results.
- Contributes to recruitment and training of branch managers to ensure top talent in 70+ locations.
- Managed and delegated project managers to assignments based on multiple factors.
- Achieved an average of 97% quality KPI scores and exceeded budget goals by as much as 39%.
0-5 years of experience
Successfully coordinated design, manufacturing, program office and procurement activities for aircraft
Nacelle components to drive on-time product delivery, increase customer satisfaction, and reduce cost
- Prepared engineering change proposals, coordination memos, project milestone schedules, proposal
- Performed configuration management by effectively leading change board meetings with internal and external stakeholders to plan engineering drawing releases and drive on-time product delivery schedules
- Evaluated and approved design changes, specification and drawing releases per Contractual
- Reduce work-cycle time on tasks by 50% by developing Standard Work and Process Maps for engineering
- An Export focal for Commercial Program; perform internal audits, and assure compliance to export
- Support Cost Reduction activities by generating cost charts, supporting Lean initiatives and monthly Program
0-5 years of experience
Responsible for managing all structural and waterproofing subcontractors for a unique and complex project at Apple’s new corporate campus. The first five months were spent in preconstruction and providing early assistance to the client and design team. Contract value for these trades exceeds $25 million.
- Supported Estimator in bid review/evaluation and overall subcontractor buyout
- Worked proactively with the architects through design development providing constructability input
- Facilitated coordination amongst structural trades to maximize efficiency and improve the schedule
- Reviewed and prepared monthly billings, change orders and manpower projections for subcontractors
- Assisted Superintendents with field activity management, including site logistics, sequencing and coordination, inspection scheduling, and QA/QC programs
- Coordinated structural scopes and requirements with MEP subcontractors and BIM Manager
- Aided and oversaw other project engineers with their subcontractors and daily responsibilities
0-5 years of experience
- Led technical design standard for WASH, flood damaged school building infrastructure and storm/flood protection, saving 30-40% of costs through making the design environmentally friendly and low cost
- Monitored overall budget of $4.5M USD for all emergency WASH projects
- Performed engineering design, blueprint drawing, scientific calculations, and preliminary analysis relating to community cultural needs and supervised the implementation of projects
- Developed hygiene promotional material to distribute to local communities in order to ensure local cooperation and sustainability of new system
- Managed bidding process for subcontractors and oversaw contracting procedures to ensure successful project completion
- Supervised 50 field staff including engineers and hygiene promoters; monitored construction work
- Responsible for weekly reports on project progress, ensuring that reports were submitting to relevant government grantors
6-10 years of experience
Completed layout and design of various community parks including grading and stormwater management facilities.
- Redesigned vertical centerlines as necessary and upgraded stormwater systems for multiple road improvement programs.
- Designed replacement of 1400+ handicap ramps to conform to PennDOT standards.
- Proposed modifications to existing underperforming stormwater BMP’s for improved performance.
- Prepared and submitted necessary permits to PennDOT, PADEP, and County Conservation Districts.
0-5 years of experience
- Lead cross-functional teams of 15-20 engineers and trade workers to develop the designs of reactor plant structures for the OHIO Replacement Class submarine; manage 11 projects ranging from concept phase through detailed design
- Led design optimization effort that provided $1.3M cost savings for OHIO Replacement program
- Present at design reviews to NAVSEA government officials and senior executive leadership
- Author concept design reports; interface with customer to answer technically rigorous questions and defend design in order to obtain approval
- Company subject matter expert on design of nuclear reactor support structures
- Conducted training on military requirements for shipbuilding fabrication and weld joint design