- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional hvac Resume Samples
Hvac Engineer Resume Samples
No results found
0-5 years of experience
Installed and maintained HVAC systems in 400 Verizon Wireless data centers and cellphone tower sites plus 4 main switching centers.
- Negotiated volume pricing contracts, valid for 6 to 12 months, for equipment and parts with 6 regional
- Designed and implemented an Excel based inventory system for parts that replaced a paper-based
- Maintained daily logs of customer dispatch route, customer issues and resolutions in addition to emergency repair calls.
10+ years of experience
- Began as HVAC Engineer and promoted to Chief Engineer in 1991.
- Responsible for facilities maintenance at large garage that housed 250 commercial vehicles.
- Also responsible for maintaining administrative offices; supervised staff of 50 workers.
- Maintained boiler operations and plumbing systems, as well as electrical and sprinkler systems
- Inspected and repaired heating, ventilation and air conditioning units
6-10 years of experience
Private contractor for this company. Handle all installations, service calls, duct installations
- Oversaw all repairs, performing the most complex repairs personally, increasing skills and knowledge by an average of 50%
- Secured all required permit approvals, achieving a 100% success rate.
- Cover all installations in all applications
- Trouble shoot all systems
- Central heat and air, wall furnaces floor furnaces, window units, p-tac units
0-5 years of experience
Provided specialized HVAC and boiler maintenance support. 24-hour emergency On-call.
- Maintained boilers, air conditioning equipment, convectors, and plumbing for 150 apartment units.
- Conducted monthly gas and water meter readings
- Performed minor repairs on radiators and steam traps
- Performed basic electrical repairs
- Performed any other duties assigned by the Resident Manager.
0-5 years of experience
Provided specialized HVAC and boiler maintenance support. 24-hour emergency On-call.
- Maintained boilers, air conditioning equipment, convectors, and plumbing for 150 apartment units.
- Conducted monthly gas and water meter readings
- Performed minor repairs on radiators and steam traps
- Performed basic electrical repairs
- Performed any other duties assigned by the Resident Manager.
0-5 years of experience
- Earned a reputation as a talented HVAC engineer and project manager of [company name] Catering Building (over 180,000 square feet conditioned area) at Imam Khomeini International Airport (IKIA)
- Developed excellent HVAC system construction management skills, completing all projects on time and in compliance with drawings and ordinances
- Handled HVAC system projects including HVAC system design, producing Cad drawings and As-Built Cad drawings upon completion of each particular job (83 drawings), buying HVAC systems and managing construction teams to install machines, do piping and ductwork to provide air conditioning for different zones and all the utilities required by machines
- Coordinated all aspects of project with architectural, structural and electrical services
- Led 30 technical meetings with vendors and contractors
- Contributed to weekly meetings with managers and directors to report on project progress and challenges
0-5 years of experience
Repaired HVAC related systems and equipment including air conditioning units, exhaust fans and more.
- Completed daily work orders and scheduled preventative maintenance of HVAC equipment.
- Changed filters and cleaned fan coils as needed.
- Maintained records associated with refrigerant usage as required by the EPA.
- Ensure cleanliness of the assigned work areas.
- Complied with safety regulations.
- Performed other light maintenance duties as requested.
0-5 years of experience
- Senior Capstone Project.
- Designed and modeled a cost effective HVAC system.
- Implemented the projects goals including the design of a system that provides the desired temperature and humidity levels while maintaining thermal comfort levels.
- Established desired environmental conditions for the valuable collection of books & rare antiquities at library.
- Demonstrated and verified the project goals using e-Quest, and AutoCAD.
- Collected temperature, humidity and light intensity data by data loggers to calibrate the model.
- Evaluated effective cost benefit analysis in terms of the low lifecycle cost as well as low energy costs for the variables considered, including the selection of a chiller, a dehumidifier, variable air volume boxes (VAV), and zonal control systems. Provided a bid-ready comprehensive report for the client.
0-5 years of experience
Calculated heat load for various air conditioned areas and ventilation requirements for various areas.
- Prepared basic study/concept note and selecting adequate/precise equipment and preparing technical specification
- Prepared HVAC ducting layouts with rectangular, spherical ducting, and preparation of shop drawing for approval from the client.
- Designed piping for oil and gas company in India using applicable codes (ANSI, ASME B31.3, etc.)
- Quantification of ducting, piping and air distribution devices and preparing BOQ (Bill of Quantities).
- Prepared HVAC plant room layout & sectional drawing of ducting layouts.
- Reviewed Vendor drawing.
- Documented all activities, prepared all transmittals for tenders, interdisciplinary changes, vendor submittals in accordance with ISO-9001:2000 standards
6-10 years of experience
Designed HVAC projects from design system options thru final construction inspections.
- Produced design, calculations, schedules, control sequences and specifications.
- Provided engineering support during construction, including reviewing equipment
- Participated in the in-house RDK Project Management Training
- Projects included: higher education; fitness/pool centers; laboratories; hospitals; health
0-5 years of experience
- Project Management: coordination of new equipment installation
- Supervised repairs of HVAC systems and all associated equipment including pneumatics and digital control systems, and refrigeration equipment
- Recommended system operation efficiency improvement and calculated coefficient of performance
- Scheduled Preventative Maintenance of Heating, Ventilation and Air Conditioning Systems
- Manipulated data in building automation system; Johnson Controls 8540 System
0-5 years of experience
- Installed, operated and maintained air conditioning and refrigeration equipment including compressors, pumps, evaporators, expansion valves, solenoid valves, controls and related equipment.
- Repaired and maintained all equipment, heating, air conditioning and refrigeration for all facilities; Responsible and accountable for a specific zone of area facilities.
- Conducted repairs to building as a general maintenance mechanic, including carpentry and electrical work.
- Performed preventative maintenance and made recommendations to improve equipment life and reliability
0-5 years of experience
Designed and implemented HVAC systems for commercial office buildings using energy calculations and meeting all building codes
- Calculated building loads to size HVAC units, ductwork and piping.
- Project Manager of MEP construction teams and subcontractors.
- Communicated with Business Officers and General Contractors to coordinate the progress of each job.
- Estimated job cost including material, labor, subcontracts, overhead and profit for change orders.
- Interpreted construction drawings, RFI’s, RFQ’s and Change Orders.
0-5 years of experience
Designed and implemented HVAC systems for commercial office buildings using energy calculations and meeting all building codes
- Calculated building loads to size HVAC units, ductwork and piping.
- Project Manager of MEP construction teams and subcontractors.
- Communicated with Business Officers and General Contractors to coordinate the progress of each job.
- Estimated job cost including material, labor, subcontracts, overhead and profit for change orders.
- Interpreted construction drawings, RFI’s, RFQ’s and Change Orders.
0-5 years of experience
- Responsible for supervision of vendors, outside contractor’s projects, was always executed under safety and cost savings inclinations along with OSHA standards
- All five clean rooms must have the FDA Specifications, pressure, RH%, temperature and CO2 level this also apply to the control rooms and labs
- Supervised, scheduling of PMs for all aspects of HVAC, UPS, PDU, switchgear room and generators
- Supervised Project and Plan Development, for fire alarm system and EMS System improving cost savings
- Oversaw all aspects of HVAC, 400 tons Carries and York chillers, four cooling towers
- Performed electrical and electronic services work to develop and prove methods, procedures and equipment, evaluate define and locate design deficiencies and accomplish special project assignments to solve problems on building automation system, modification and operation
- Performed assigned duties in and around hazardous materials while maintaining a safe working environment with limited amount of supervision instruction or direction
0-5 years of experience
Provided Engineering support for 6 million square feet of laboratory, manufacturing, office, and R&D facilities (Forty Buildings).
- Responsible for indoor plant air quality, clean room support, and central chilled water/boiler systems.
- Provided engineering support for the critical data center and computer room support systems.
- Project management of HVAC system installations, chilled water, steam systems, and computer room support.
- Implemented annual capital plan for facilities projects in the $10-15MM range.
0-5 years of experience
Performed complete daily monitoring of boilers, chillers and air handlers unit on four hospital campuses, including preventative maintenance and troubleshooting, repair and replacement.
- Evaluated efficiency of various heating and cooling units requiring understand of electrical wiring diagrams, schematics and split systems
- Troubleshot Carrier, Trane, Weatherman air handlers, Cleaver Brook boilers
- Communicated task assignments to team members clearly and concisely.
0-5 years of experience
Calculated heating/cooling loads for various commercial, industrial, and private applications
- Determined heating/cooling equipment size and layout based on project specifications, architectural drawings
- Conducted in field measurements when information could not be obtained via drawings/specs
- Utilized Microstation software to make building and ductwork design layouts
- Responsible for drawing changes and revisions as directed by supervising engineer
0-5 years of experience
Examined compliance with California Title 24 by Energy Pro
- Calculated ventilation based on California Regulations
- Revised relevant plans
- Calculated plumbing and design
- Drafted HVAC and plumbing plans for residential and commercial buildings with auto CAD
0-5 years of experience
To protect against a worst case chemical dispersion a stack sizing calculation was performed. As well as equipment selection, stack air sampling and monitoring selection, piping and instrumentation diagrams, flow diagrams, and construction and procurement specifications. Used CAP88 software to demonstrate compliance with 40 CFR 61, the Clean Air Act standard which applies to U.S. Department of Energy (DOE) facilities that emit radionuclides to atmosphere. Also, used Excel spread sheet to calculate pressure loss and velocity using ASHRAE Fundamentals. An Excel XY scatter chart was used to plot fan and system curve.
- Prepared several pump sizing calculations. Design Flow Solutions Software was used for pressure loss calculation. Excel was used to plot pump and system curves, and adjust pump curve per centrifugal pump affinity laws when motor speed (rpm) is changed.
- Prepare unlisted component calculation to demonstrate hoses proposed for use qualify as B31.3 piping components.
- Prepare several design change packages, pump and piping data sheets for H- Tank Farm piping and HVAC systems
0-5 years of experience
To protect against a worst case chemical dispersion a stack sizing calculation was performed. As well as equipment selection, stack air sampling and monitoring selection, piping and instrumentation diagrams, flow diagrams, and construction and procurement specifications. Used CAP88 software to demonstrate compliance with 40 CFR 61, the Clean Air Act standard which applies to U.S. Department of Energy (DOE) facilities that emit radionuclides to atmosphere. Also, used Excel spread sheet to calculate pressure loss and velocity using ASHRAE Fundamentals. An Excel XY scatter chart was used to plot fan and system curve.
- Prepared several pump sizing calculations. Design Flow Solutions Software was used for pressure loss calculation. Excel was used to plot pump and system curves, and adjust pump curve per centrifugal pump affinity laws when motor speed (rpm) is changed.
- Prepare unlisted component calculation to demonstrate hoses proposed for use qualify as B31.3 piping components.
- Prepare several design change packages, pump and piping data sheets for H- Tank Farm piping and HVAC systems
0-5 years of experience
Environmental design, maintenance of HVAC system for sensitive Electronics / telecommunications equipment. Power generation Equipment maintenance.
- Heating, Cooling load calculations by ASHRAE Standards, Ductwork design, Equipment selection, Preparation of Proposal and Bids, Maintenance of Switch Sites, Equipment installations.
- Project/Construction Management, Review MEP designs and Uniform building codes.
- Facilities planning, Cost Analysis, vendor selection/evaluation. Manage engineering issues for several Telecom switch sites, scheduling preventive maintenance for AC/DC power equipment and HVAC equipment.
- Forecasting of the Heating & Cooling load using MS-Excel and built in tools.
- Plan, design and equipment selection for the Fiber Optic cross/inter-connect. Extensive knowledge of T1/DS1, T3/DS3, OC-n and SONET design.
0-5 years of experience
- Created construction documents using Revit and AutoCAD
- Sized ductwork, piping, and performed load calculations for mechanical equipment
- Coordinated mechanical rooms with all trades in 3D model
- Worked on US Senate Building, Yale Rare Book Library, and Belvidere Tower among others
0-5 years of experience
Investigated, diagnosed and remedied problems and malfunctions as it pertains to.
- Pneumatic controls completed Pm’s.
- Diagnosed all HVAC electrical components on, chillers, rooftops, fan units and ice machines.
- Installed machinery, equipment and new and replacement parts.
- Lubricated shafts, bearings and machinery gears.
- Serviced systems for air handling, hydraulic, electrical, valves, circuits and pumps.
0-5 years of experience
Successfully completed multiple projects in hi-rise buildings, luxury homes, commercial buildings and interior fit-outs.
- Process work package requirements to ensure feasibility and availability of materials, considering construction engineering, procurement and logistics priorities.
- Reporting of project matrix, material requirements, receipts and allocation of materials.
- Provide design coordination between multiple engineering disciplines
- Executing the work according to contract and shop drawings.
0-5 years of experience
- Calculated heat load for various air conditioned areas and ventilation requirements for various areas.
- Prepared basic study/concept note and selecting adequate/precise equipment and preparing technical specification
- Prepared HVAC ducting layouts with rectangular, spherical ducting, and preparation of shop drawing for approval from the client.
- Designed piping for oil and gas company in India using applicable codes (ANSI,ASME B31.3,etc.)
- Quantification of ducting, piping and air distribution devices and preparing BOQ (Bill of Quantities).
- Prepared HVAC plant room layout & sectional drawing of ducting layouts.
- Vendor drawing review
6-10 years of experience
6yrs, [company name], operated and maintained two 1200psi steam boilers, four steam-powered turbine generators, and various auxiliary equipment. Worked in the steam and heat shop repairing and maintaining 11 water heaters, water towers, air handlers, walk-ins, chillers, galley equipment and others.
- EPA 608 Universal Certified
- Proficiently able to draw and understand line and pictorial schematics
- Able to charge, recover and recycle refrigerants
- Mechanical and electrical troubleshooting
- Able to calculate superheat and subcooling
10+ years of experience
Work on the [company name] in several restaurants: Elephant Thai Restaurant 1&2, Ginger Thai Restaurant, Thai Diner & Thai Diner Too Restaurant, Edy’s Chicken & Steak Restaurant
- Supervise, assist maintenance technicians during the work on centralized AC units, exhaust fans, water heaters, and kitchen equipments
- Install and repair restaurant equipment including walk in cooler & freezers, and AC
- Develop HVAC plans including mechanical equipment area sizing and location
- Create specifications and order materials and equipment for customers
- Control project cost
0-5 years of experience
Installation of packaged units, heat pumps, split systems, mini split systems, chill water and boiler controlled units.
- Installation of air control media, flexible, spiral, rectangular, duct-mate, prefabricated and fabricated on site.
- Layout and design of desired air control medium. General demolition. General construction. Retrofitting.
- Air distribution and balancing. Install and upgrade/retrofit VAV system for automation.
- Troubleshooting on service calls, preventative maintenance, corrective maintenance, and insulation.
0-5 years of experience
Managing HVAC computerized system that maintains an ideal environment in the Hotel
- On site Repairs for HVAC equipment
- Responsible for monitoring the boilers, Chillers and air conditioning equipment performance and recording daily temperature sheets
- Repairs in site for mechanical equipment
- Development of preventive maintenance system that assures the quality of the hotel’s services.
0-5 years of experience
Multi division group with specialized Electro-Mechanical contracting division executing a variety use
projects supported by 90 high experienced staff plus 1200 skilled workers, delivering state of art building
services.
- Responsible for the execution of the following projects in what relates HVAC system.
- Coordinating with consultant & contractors to achieve project handing over date
- Preparing material submittal & follow up with consultant for approval.
- Arranging required man power according activities at site.
- Material procurement which is required at site
- Installation supervision & assuring it as per project’s specification & Authorities requirement.
- Designing HVAC system according to the related standards.
- Preparing operation, maintenance manual & training schedules.
10+ years of experience
Established and operate an HVAC and General Contracting business offering quality service and equipment for commercial, residential and governmental clients in the tri-state areas of New Jersey, New York and Connecticut.
- Service and maintain HVAC equipment of all levels from in-home window units, furnaces and hot water heaters to commercial equipment including plumbing and electrical work associated.
- Specialize in service contracts, repairs, maintenance and installation of HVAC, in-wall units, plumbing, electrical, boilers and exhaust fans for Princeton Hampton Inn, Princeton, NJ and Crowne Plaza Hotel at LaGuardia, NY.
- Conduct diagnostic assessments of maintaining and servicing existing equipment and offer recommendations to improve efficiencies and reduce costs.
- Kitchen and bath remodels, window and door replacement, decking, dry wall, painting, ceramic and wood flooring.
- Assess projects and prepare bids in response to RFP’s for general contracting and new installations outlining equipment needs, budget and scheduling; as well as preparing RFP’s for sub-contracting work.
- Oversee and manage staff of 3 technicians, sub-contractors and manufacturer technicians.
- Develop solid and trustworthy business relationships with vendors, business partners, sub-contractors and customers with a high level of confidence and quality service.
10+ years of experience
Participation in the investment process for construction of new bank buildings.
- Participation in design of heating, ventilation and air-conditioning installations of the bank.
- Participation in the assembly of installations.
- Participation in the starting and adjustment procedures.
- Consultant in the preparation of algorithms for the automation, controlling the installations in UniCredit Bulbank buildings.
- Operation and maintenance of all heating, ventilation and air-conditioning systems and installations.
0-5 years of experience
- Support research and development of environmentally friendly refrigerant systems.
- Developed composite rapid-prototype HVAC line sets with engineering drawings followed by fabrication of functional metal line sets.
- Led compressor suppliers through conversion strategy and powertrain compatibility issues.
- Instrumented development vehicles for refrigerant capacity and HVAC performance at the climatic wind tunnel.
- Provided assembly manuals and tech support for durability fleet vehicles built at GMMexico Proving Grounds.
0-5 years of experience
Designed HVAC systems for commercial and residential spaces including retail stores (Lacoste, UNIQLO), office spaces, apartment buildings, hotels, restaurants and vendor shops.
- Surveyed existing conditions for commercial, offices, retail stores and residential spaces.
- Performed load calculations for various spaces.
- Performed Special Inspections, such as TR1 and TR8 inspections.
- Performed Punch lists for various spaces.
- Utilized COMcheck for energy analysis on a variety of projects.
- Performed piping and ductwork layouts, drafting and sizing.
- Performed unit selections for various HVAC equipment (such as RTU’s, split systems, fan coil units, cooling towers, chillers, etc.).
0-5 years of experience
Managed 15-25 vendors and subcontractors.
- Capital improvement projects and facility repairs.
- Estimating, requests for quotes (RFQ’s), contract development and contract oversight.
- Total ownership of critical heavy mechanical systems equipment (HVAC) in 18 large U.S. Air Force aircraft testing and equipment overhaul facilities at [company name], Utah.
- Managed yearly budget in excess of $7 million dollars.
- Extensive knowledge of large critical HVAC systems including; cooling towers, chiller systems, boiler systems, clean air filtration systems, water treatment, and direct digital control systems for HVAC equipment & troubleshooting of such.
- Knowledgeable of building and energy management systems.
- Maintained clean air standards in highly sensitive testing and repair facilities.
0-5 years of experience
Responsible to operate and maintain high pressure equipment used to generate
power, heat, air conditioning, and refrigeration for the company and its products
- Ensure the equipment operates safely by performing routine
- Trained for Good Manufacturing Practices (GMP)
- Working in a Safe Quality Foods (SQF) environment
- Responsible for the management and treatment of facility waste water system
- Responsible for weekly test of fire sprinkler system and pumps
- Daily Data Entry through the use of Maint. Coordinator System and Excel
0-5 years of experience
Maintained and repaired packaged air conditioning units.
- Replaced/Adjusted VAV Controls and calibration of pneumatic thermostats.
- Replaced filters/preventative maintenance on air handlers.
- Installed and maintained condensing units and recovered refrigerant and charged units.
- Replaced exhaust fan motors/blower motors.
- Maintained refrigerators and ice machines systems.
- Braised copper drain systems for ice machines and air conditioning units.
6-10 years of experience
Maintains mechanicals of 424 hotel rooms and 12 meeting spaces
- In charge of ordering supplies for all repairs of equipment
- Responsible for communicating with vendors and technical support
- Assists in all general engineering duties
- Repairs and rebuilds all units
0-5 years of experience
Responsible for repairing air conditioners and Heaters in Afghanistan.
- Working in Afghanistan as a mechanical contractor.
- Responsible for the repair or replacement of Air conditioners at Bagram AFB.
- Supervises local hired Afghanis.
- Selected for a foreman position.
- Performing mechanical work in a combat zone.
0-5 years of experience
Design, HVAC Systems for Buildings, Environmental rooms, Cleanrooms and Labs, using AutoCAD.
- Design and calculation for Duct, Pipe, Electric and Control systems: size calculation, P&ID diagrams, Air Flow Diagrams, Connection diagrams and Commissioning plans.
- Calculation and selection for mechanical components: Air Handler, RTUs, Split Systems, Vertical AC units, Dehumidifiers, Humidifiers, Preaheaters and Reheaters etc.
- Calculation and selection of HVAC control components: VFD, Hot gas bypass, Dehumidifier systems.
0-5 years of experience
HVAC Engineer Responsible for maintaining all HVAC systems, including all split systems and 7 air cooled chillers.
- Develop and implement auxiliary plant cooling systems using computer modeling application.
- Schedule/Perform repairs and replacements of AC Motors, pumps, fan, condensation tanks, condensing fan, reciprocating compressors.
- Responsible for checking drives, align and adjust belts and coupling.
- Analyze cost benefit of capital improvement and evaluate economy of equipment replacement.
- Responsible for glycol testing, quality & percentage ratio.
- Schedule preventive maintenance, and coordinate program plant test cycles, conduct load testing on coolers and heating equipment for HVAC design validation.
- Responsible for inspecting the chiller plant loops, conduct root cause analyses on HVAC test failures and develop and implement repairs.
- Inspect and maintain all HEPA Filter Blower Fans.
0-5 years of experience
Engineering design and erection of HAVC systems in shrine projects.
- Engineering design and erection of water network systems in shrine projects.
- Engineering design and erection of boilers, heat exchanger, cooling tower, water
- Engineering design and erection of refrigeration systems.
- Engineering design and erection of fire-fighting system.
0-5 years of experience
- Responsible for maintenance of 110,000 sq. feet of office buildings. Performing maintenance read and interprets schematics for ordering proper parts for repairs.
- Overall servicing of electrical, plumbing, and HVAC and refrigerant units.
- Performed scheduled and unscheduled preventative maintenance and inspections.
0-5 years of experience
- Schedule and complete equipment PMs.
- Operate and maintain low-pressure boiler for the hot water system.
- Operate and maintain other vessels as needed for hot water kitchen steam and air conditioning systems.
- Assist mechanics and external contractors with repairs of hotel property and equipment.
- Repair and maintain commercial kitchen and laundry equipment.
- Completion of all assigned work orders and daily tasks.
- Receive direction for house calls via radio.
0-5 years of experience
- Preventative maintenance for all HVAC equipment including: boilers, chillers, cooling towers, & pumps
- Perform needed tests and adds the proper quantity of chemicals to the various system
- Assists in the maintaining for the parts and supply inventory for plant equipment and reports supply requirements
- Respond to emergency calls to all hospital departments for all mechanical trouble shooting
0-5 years of experience
- Mechanical Engineer II, for new NAVY OHIO Replacement submarines.
- Provided engineering support for HVAC design.
- Conducted calculations to support equipment sizing, heat and AC load analyses, acoustic analyses, material analyses, dynamic modeling, mechanical design, and various heat transfer and fluid system analyses.
- Interfaced with different fields of engineers and designers on a daily basis.
- Used various commercial and in-house software to accomplish tasks.
0-5 years of experience
- Operate, maintain, lubrÃcate, repair, adjust pumps, blowers, valves, heat exchangers, generators, motors, water treatment systems, cooling towers, condensers, evaporators, emergency generators and associated equipment for heating, ventilating, air conditioning, and lighting.
- Repair and adjust Inncom eqiupment.
- Troubleshoot electrical issues, such as changing ballast, VFDs, Motors, actuators and etc.
- Work on hafele systems and door locks.
- Perform all duties of a fire safety director.