- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Industrial Engineering Resume Samples
Fabrication Engineer Resume Samples
No results found
0-5 years of experience
Utilized market studies and design research to develop a functional prototype and bench-top characterization in 14 months
- Designed automated HIV-Diagnostic MEMS microfluidic device to reduce ELISA process time by 80% for higher throughput
- Created a start-up business model by defining a target market, large-scale manufacturing costs, and possible next generation devices
- UC Irvine School Henry Samueli School of Engineering Top 5 Design Award — Patent Pending
6-10 years of experience
Reported to and supported the Project Manager. Served as the primary contact for customer technical issues and field contract management.
- Responsible for execution of assigned tasks.
- Approved writings necessary to keep work flowing. Coordinated the response to all technical questions and deviation requests.
- Interfaced with the assigned group preparing the fabrication and assembly methodology and Statements of Work for assigned units.
- Worked with the Project Manager and Project Controls to establish detailed schedules and milestones for assigned units.
0-5 years of experience
Supervised electronic and mechanical departments, ensured employee moral remained high, ordered components, organized daily,
weekly, and monthly schedules in order to maintain prompt attention to oncoming work loads.
- Measured, designed, fabricated, prepared, installed, and maintained all electrical and mechanical components within race vehicles.
- Performed body repairs and painting using metalworking, fillers, and paints distributed in downdraft booth and SATA 3000 HVLP
- Performed machining on lathe and Bridgeport mills in order to create tolling and desired mechanics.
- Translated data from instrumentation in order to measure and improve vehicle’s performance.
- Performed fabrication on race vehicles while conforming to mandated regulations dictated by sanctioning body.
- Prepared race vehicles’ surface to ensure proper substrate in order to paint and fit templates correctly.
- Provided coaching support in order to improve pit crew performance with motivation, strength, agility, and choreography training.
- Performed Pit Crew duties (Carrying Tires) at race shop for practice and racetrack on race day.
0-5 years of experience
Implemented Document Control Standards for ISO 9001 registration dealing with all Fabricated Fitted Drawings.
- Managed production and design of all standard and custom polyethylene fittings. Prepared basic drawings for the entire plant using ACAD Release 13 and ACAD 2000; introduced a new Fabricated Fittings Catalogue; and revised and rewrote CSR’s Technical, Manufacturing, and Fabricated Fitting Specifications.
- Supported the business requirements of clients as a Technical Service Engineer. Conducted research, completed evaluations, and designed plans related to the refurbishment of equipment.
- Responsible for designing, implementing and managing an efficient shop floor layout.
- Managed Scrap Department and responsible for re-claim operations including safety, training and scheduling of 8-12 employees.
- CSR Production Planner for new products across six plants within the United States. Responsibilities included building the Bill of Material (BOM), Routings and “live” costing for products using SAP.
- Familiar with ASTM, AWWA, FM and NSF Standard Specifications for Polyethylene Pipe and Fittings.
0-5 years of experience
Certified to work in a clean-room environment
- Training in OSHA, HAZOP, EPA completed
- Troubleshooting and resolution of production defect issues using process control and data analysis programs such as SPC, SUMMIT, JMP
- Organized and prioritized production line protocol to ensure productivity in a fast- paced 300mm environment
- Developed cost savings projects for the Department of Metrology
- Mentored newly hired technicians
- Arranged preventive maintenance into an efficient, smooth-flowing schedule to maintain tool availability
- Collaborated with other equipment engineers to standardize operating and validation procedures, aiming to optimizing tool performance
6-10 years of experience
Over five years of process engineering experience in both 200 and 300mm fabrication plants on various aspects of the Photolithography processes
- Responsible for tool and product recipe qualifications on photolithography metrology tools, namely KLA-TENCOR and Applied Materials Versasem
- As an engineering trainer, responsible for overseeing area training, certification and documentation.
- Recognized for key role in Micron Technology, Virginia’s Total Productive Management initiative (TPM).
0-5 years of experience
Commercial Window Manufacturer
- Established excellent customer relationships by servicing the sales representative and customer
- Processed window orders from shop drawings or customer’s purchase order for fabrication
- Produced fabrication documents for sales representative, customer, and manufacturing facility
- Resolved both customer’s fabrication design issues and manufacturing questions expeditiously
- Strengthened time management skills by working on multiple projects at various stages of completion
- Utilized AutoCAD for layouts of non-rectangular shaped windows and design sketches
0-5 years of experience
Completed hands-on design work utilizing skills from previous work and educational experiences
- Ensured design specifications were met as well as staying within the allotted project costs
- Utilized SolidWorks to generate/analyze detailed designs and conducted machinery maintenance as required
- Supervised a peer in safe use of tools (MIG welder, plasma torch, mill, oxy-acetylene torch, etc.)
0-5 years of experience
- Familiar with a broad range of IC fabrication departments (Photolithography, Etch, Diffusion, Thin Films and Product Division
- Product Division – Isolated yield factors and commonalities with JMP (R2 analysis)
- Etch – Examined purged gas flow for chlorine content with spectral gas analyzer to minimize preventative maintenance downtime by 50%
- Diffusion – Monitored and minimized defect levels in vertical diffusion furnaces
- Thin Films – Qualified a new TEOS deposition machine
0-5 years of experience
- Provided technical and QA requirement direction to craft personnel during the shop fabrication of multiple pulse jet mixer arrays for the Hanford Waste Treatment Plant Large Scale Integrated Testing program.
- Performed checking of shop drawings for accuracy, manufacturability, and Client specification requirements.
- Originated fabrication travelers and weld maps.
- Updated shop drawings per red line change control procedure to maintain configuration control.
- Performed engineering support for modification of existing test platform mechanical systems (compressed/instrument air, ventilation, simulant supply).
- Originated commercial grade inspection plans for safety related equipment procurements.
6-10 years of experience
- Responsible for manufacturing process improvement operation of $1.2 million.
- Instituted programs that focused on safety conditions and environment.
- Worked closely with customers to resolve quality issues.
- Oversaw installation and start-up of new equipment to improve the process.
- Instituted programs that assisted staff in fully understanding process controls.
- Utilized RCCA method to resolve problems.
0-5 years of experience
- Wrote reports, instructions, and data that conformed to medical research regulations.
- Worked in a regulated lab to polish and bond acrylic parts using chemicals and lab equipment.
- Drafted 2D and 3D drawings of complex, integrated microfluidic devices for a grant proposal.
0-5 years of experience
Fire Fighting Robotic System
- Assisted in the design and modeling of a robot with microcontroller to extinguish fire in a room using IR LEDs, Photo-resistors and DC motor
- Designed the prototype in AutoCAD as per requirements
- Fabricated the robotic system and performed multiple debugging runs to eliminate errors
0-5 years of experience
Developed an innovative commercial prototype of digital x-ray imager based an array of atomically sharp Si tips
- Developed/Integrated its fabrication process, involving tricky controlled undercut of dry etch & sharpening oxidation
- Designed and implemented a test system integrating a vacuum system, x-ray source, and micro-channel plate
- Converted graphite/reticulated vitreous carbon(RVC) tile uniformly into carbon nanotubes (CNTs)
- Designed, fabricated & tested CNT-enhanced, large-scale, high-current-density graphite/RVC light tile
- Helped supervise graduate and undergraduate students
0-5 years of experience
Poly, POCL3, sinter, densification furnace process and equipment engineer.
- Saved company over $200,000 annually in hardware modifications.
- Developed insitu boron doped poly process integration (patent pending).
- ISD poly development accepted into ATD seminar.
0-5 years of experience
Work directly with the 3-Form team and the clients to fabricate, trial, and adjust equipment to meet individual client’s custom needs
- In partnership with the Project Manager, analyze assignments and projects to determine the most effective ways to accomplish fabrications and adaptations.
- Ability to work in the progressive assembly method of production handling more than one fabrication at a time.
- Installs power supply wiring and conduit for newly installed machines and/or equipment
- Diagnoses malfunctioning apparatus such as transformers, motors, and lighting fixtures and replaces damaged or broken wires and cables
0-5 years of experience
Developed and managed company custom fabrication requirements.
- Technical Sales Advisor; Cost estimating – Metal Fabrication
- Determine functional and technical elements from customer drawings/prints.
- Selected and managed suppliers and sub-contractors for contract awards.
- Prepared engineering documentation: BOM, ECO, Parts Lists, etc.
0-5 years of experience
Managed early stage prototype development activities of micro-machines and precision medical parts.
- Hands on processing for initial development trails, characterization, and capability studies for micro-machines and precision micro medical parts. Generated clear and accurate process work instructions, routers, matrixes and training documentation. Maintained all equipment and facility support equipment.
- Ran all first article/development jobs to prove capability, define parameters, and to identify potential pitfalls.
- Solved complicated process problems and improved quality and yield by designing and running targeted experiments to identify root cause failures. Documented effective verification methods, inspection criteria, and controls. Documented and managed all process data throughout the products life cycle.
- Supported Ni, Ni/Nm, and Cu electro-plating ramp up activities on Alumina/Ceramic base substrates. Created equipment recipes, maintained bath performance, and scheduled maintenance activities.
- Developed and coordinated capital equipment maintenance needs and tool calibrations with outside vendors to identify and control costs and quality issues associated with scaling up. Created applicable maintenance and process documentation. Preformed scheduled and non-scheduled maintenance.
0-5 years of experience
- Utilized SolidWorks for design of custom orthotics and surgical retractors from carbon fiber
- CNC fabrication with PowerMILL CAM software and NC code programming
- Operated and maintained CNC milling machines and FLOW waterjet table
- Automated routine manufacturing processes through design of custom fixtures and NC code
- Developed a fabrication process manual and updated the company website
0-5 years of experience
Moved motor vehicles stalled, damaged by accident or ticketed by police for traffic violation
- Provided emergency mechanical assistance to individuals, including jump starts tire changes lockouts, fuel delivery, towing and other services
- Regularly handled escalated service request, including difficult towing vehicles located in areas or positions that may prevent timely service by independent contract stations.
- Operated vehicles in accordance to local, state and federal transportation regulations
- Fabricated large panels of metal, attaching them together with fasteners or welding by hand or machine.
- Worked the assembly line that turned out screws rivets and other fastening material.
- Installed metal interior designs in homes and office buildings such as metal staircases and fire escapes.
- Planned sequence of fabrication, assembly, installation and manufacturing operations for guidance of production workers
6-10 years of experience
- Managed development, fabrication and testing of micro charge injection nozzles
- Funded by TDA Research Inc.
- Performed lithography, wet & dry etching, sputtering and evaporation on SOI wafers
- Characterized and measured with SEM, elipsometer and electrical probe stations
6-10 years of experience
Attended site meeting with clients, contractors and architects.
- Precisely measured openings of window and door prior to fabrication.
- Made shop drawings and preparation drawings of windows and doors thru AUTOCAD.
- Supervised fabrication of PVC-u windows and doors.
- Supervised personnel in installation of PVC-u windows and doors.
0-5 years of experience
- Use SolidWorks software for 3D modeling and determining fabrication method and construction of complex parts, weldments and assemblies.
- Operates CAD/CAM software to produce G-code for Turrets and Lasers.
- Review drawings and models for revision changes, update programs as needed.
- Work with other departments to determine manufacturing methods.
- Review Sheet Metal process including turrets, laser, forming, hardware insertions and welding.
- Produce supporting documentation for process; Redlines and manufacturing drawings.
0-5 years of experience
Accurately estimates take-off for stainless steel piping systems
- Provide pricing for large and small stainless steel pojects
- Take inventory of available supplies
- Create spreadsheet for inventory and takeoffs
- Work in conjunction with management to provide estimates for job bids
0-5 years of experience
AutoCAD drafting in 2D and 3D.
- Use of lathe and drilling machines.
- Diesel engines, pumps and valves servicing/maintenance.
- Drawing of mechanical designs in buildings and interpretation.
0-5 years of experience
Fabrication of industrialized plastic
- Welding plastic
- Measure and cut plastic pipes
- Moving finished material with forklift
0-5 years of experience
Design support systems for back lit stone walls
- Build prototypes
- Work with P.E. on wind load and weight loads for designs
- CAD Drawings of support systems
- Installing support systems
- Installing stone panels
- Wiring light panels
- Working with fabricators on lead times and pricing
- Designing and building steel skeleton structures for panel walls
- Install light dimmers and LED light drivers
0-5 years of experience
Assemble driveshafts
- Shipping and receiving
- Inventory
- Paint products
0-5 years of experience
- Blue print Drawer
- Metal worker
- Welder
- Loading and unloading trucks
- Erection of equipment
- Inventory Management
- Maintenance and Repair
- Electrical Work