- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Information Technology Resume Samples
Project Leader Resume Samples
No results found
0-5 years of experience
Responsible for identifying and implementing cost savings for fortune 50 Aerospace client as they undergo massive
organizational change.
- Created next day air shipment (premium freight) process to identify cost savings of over $3M per year.
- Led project to implement conversion from expedited to 2 day freight. Savings:$780K achieved.
- Managed client engagement effectively by achieving high customer satisfaction.
- Utilized i2 Transportation Modeler to consolidate inbound freight & design milk-runs. Savings: $150K
0-5 years of experience
Managed projects for design, development, implementation, and maintenance of workflows with the SD and MM modules of SAP environment.
- Managed four budgets for these projects, ranging for $20K to $100K, achieving goals within budget.
- Managed project team of four IT and three users to solve problems with prepaid freight costs exceeding $2M annually, resulting in reducing costs.
- Analyzed problem and developed solution to send an SAP-Workflow approval authorization to appropriate product line manager for prepaid freight charges, improving business decisions.
- Developed an ABAP function module that transmitted necessary information when prepaid customer order was entered and place a shipping block on entire order, increasing efficiency.
- Implemented process on approved order for removal of shipping block to meet customer deadline.
0-5 years of experience
Built and led a cross-functional project team (up to 13 individuals) in support of packaged financial software, providing customer service and maintaining positive communications with 11 client sites.
- Tactfully managed complex team dynamics, handling organizational change related issues, and fostered an on-going positive environment with a motivated staff and satisfied customer base
- Recognized by senior management for stellar project leadership and customer service
- Played a lead role in the reduction of costs by over $300,000 per year through improved hardware and processing, including the consolidation of 4 sites into 1 server
0-5 years of experience
Designed, built, and tested speed control circuits, tracking sensing circuits, and steering control loop
- Optimized feedback system to increase motor control speed efficiency by 30%
- Optimized steering system response time by 40%
- Competed against 15 teams and won 2nd place in the competition
0-5 years of experience
- Managed 10 on-site software development projects, cross-functional and virtual teams up to 30 people.
- Led a data warehouse migration from SQL 2000 to 2008. Database response time improved 50%.
- Led a web system migration from .NET framework 1.0 to 4.0. Transaction processing performance improved 50%.
- Conducted bi-annual assessment of 6 team members to identify training needs and create career plans.
0-5 years of experience
Managed and led a team that implemented a new automation framework for a steel manufacturing
giant, reducing turnaround time and improving efficiency of product testing by 100%
- Conducted extensive competitor analysis and designed test plans for different components in Oracle
- Supervised cross-functional teams to resolve customer escalations and devised process improvements
- Created internal training programs and mentored teams on various technology initiatives resulting in savings of nearly $100,000 in training costs
0-5 years of experience
Finance project leader responsible for the design and implementation of a trade promotion management system to manage and control $500 million of trade spending of the consumer products division.
- Collaborated with sales management, field sales and IT to develop the trade promotion management tool.
- Designed forecasting revenue process by brand and promotion vehicle and integrated forecast with trade promotion spending.
- Created tighter financial controls, and authored automated financial reporting materials.
- Project yielded $12 million in annual savings in gross to net spending.
- Created all data and reporting tools available to finance teams on weekly/monthly basis.
- Generated tools and process to consistently measure the efficiency of retail trade fuel spending, refined financial controls and created post event analyses tool and reporting.
- Developed monthly oversight process with Sales, Finance, and Accounting for tracking results vs. budget.
0-5 years of experience
Developed project master schedule to ensure on-time vehicle launch in October 2015
- Supported the localization of concept vehicle build activity to TMMK saving $2 million
- Established process kaizens to optimize wire harness usage by 20%
- Created strategies to successfully manage on-time release of technical information
- Led working group to create global KPIs for best practices among 5 global regions
- Recognized as the department expert in managing the routing of parts for all projects
- Led efforts to communicate technical information among customers to meet launch
- Ensured on-time, high quality trials & launch of over 20 project accessories
- Created problem solving to support the communication of specs between regions
6-10 years of experience
Managed 10 – 15 member cross-functional AM-FM satellite radio and navigation design teams in new product development for multi-million dollar projects in order to meet product quality, timing, and cost goals.
- Launched four radio and navigation system designs for production, resulting in numerous quality performance awards, including a $500K award for achieving product goals ahead of schedule
- Completed Six Sigma Green Belt project which reduced the product development cycle by 3 months, resulting in audio product development savings of approximately 12%
- Impacted the audio systems business unit as a mentor and coach with high ethical and professional standards and exceptional ability to motivate local and virtual team members to accomplish challenging work
- Led engineering customer interface with activities including expert audio engineering support, design review presentations, technical risk assessments, responses to design change requests, and frequent reports of design progress
- Managed project design and planning responsibilities for electrical, mechanical, software, manufacturing test, and manufacturing process engineers by means of project schedule, design reviews, design failure mode effects analysis (DFMEA), and systems-level evaluations
- Planned comprehensive strategy for product design validation and verification, resulting in development of new techniques and supporting documentation that were adopted by the audio business unit to facilitate efficient management of test time and resources
0-5 years of experience
As project leader developed test scripts and methodologies for a comparative review project. Created quantitative analysis of data and technical reports. Oversaw all phases of project management relating to the testing of desktop and notebook computers.
- Increased efficiency through better project management. Projects were planned earlier moving them from a 4 month cycle to a 3 month cycle.
- Managed product testing by the [company name] Labs PC team of 10 technicians.
- Wrote numerous product reviews and test reports that were published in the magazine.
- Trained 2 technical analysts who were promoted to project leaders at [company name].
0-5 years of experience
Title: Fatigue crack growth characterization using digital correlation for nickel-based superalloys
- Developed a proficient and accurate digital image correlation setup for room and high temperature fracture analysis.
- Identified critical fracture parameters for computational and life prediction modeling due thermal and mechanical loading.
- Created customized Python scripts according to customer needs for efficient digital image correlation data acquisition.
- Managed and delegated experimental and analysis tasks to a team of 2 graduate students.
0-5 years of experience
A publicly traded wireless company under the symbol TMUS. It has 42.5 million subscribers with revenue of $24.8 billion.
- Directed the planning, design, production, and administration of regional projects.
- Partnered with Operations and Human Resource Business Partners on the implementation of Leadership Development Programs for Hi- Potential Retail Store Managers resulting in improved participant performance year over year.
- Initiated cross-training with other departments to improve work flow and streamline project completion on time.
- Met regularly with upper level interdepartmental teams to monitor and evaluate project progress and discuss policy issues and recommend improvements.
0-5 years of experience
As the Project Leader, I am responsible for coordinating all aspects of the engagement.
These include, but are not limited to, due diligence, strategic planning, financial analysis and reporting,
business process design, business development, integrations and training.
Recent accomplishments include:
Implemented new company-wide policies and procedures.
Development of new sales channels.
Developed and implemented new bonus and commissions’ structure for managers and sales associates.
- Reorganized company structure and business model.
- Slashed payroll by 30% and overall staff by 40%.
- Shuttered 6 non-performing units and implemented companywide cost-cutting measures.
0-5 years of experience
Animated Transition in Image Similarity Based Spiral Layout (project leader)
- ï¬Investigated the effectiveness of animated transition in a similarity-based spiral image layout with OpenGL , FLTK and FLUID in C++
- ï¬Considering from animation steps, actions and transition paths, implemented an integrated solution – AniMAP, and optimized the solution to successfully reduce 60% overlapping
- ï¬Conducted a persuasive user study to evaluate and illustrate the efficacy of animation
0-5 years of experience
B2B marketing of long-life, consistent and rugged industrial computer products
- Led new partnership opportunities and expanded partner program
- Increased qualified leads by 25% through JV marketing and campaigns
- Helped identify and implement corporate branding strategy
- Managed content generation for social channels
- Designed email marketing campaigns using SalesFusion and iContact
- Ran automated drip/trigger campaigns monthly
- Led weekly Marketing and Sales meetings
0-5 years of experience
- Managed crews up to 24 specialists from every trade
- Successfully completed every assigned project on time, on specification, and as approved
- Built every in-country structure required: concrete, metal and wood, site work, roads, utilities and drainage
- Reviewed plans, tracked materials, managed trades, planning and preplanning, managed maintenance
- Responsible for supply/logistic department; prepared photo site-reps by computer, MS project
6-10 years of experience
Was actively involved in the entire spectrum of project development. Performed analysis, design, development, testing, implementation, and production support of numerous systems for Securities Processing Technology Department.
- Headed the programming team that designed Securities and Accounting DB2 Stored Procedures used to create reports for various clients. Implemented DB2 in-line views to improve performance.
- Created documentation and specifications for the reporting group utilizing MS Word and Excel.
- Served as primary liaison with business analysts and users both domestic and international.
- Developed, supervised and supported an Intra-day Trade Information System, which consisted of nine major custody processing systems’ Message Queuing Interfaces with Client Data Warehouse (CDW). CDW replaced old Data Store Application.
- Made major contribution to the design and development of CICS Data Store Report Generation System, which revolutionized clients’ reports generation, tracking and delivery.
- Trained business personnel and team members in Data Store Generation System use.
- Was solely responsible for the design and implementation of Global Accounting statements.
- Created ad-hoc QMF reports to satisfy client requests, evaluated DB2 queries performance.
0-5 years of experience
Project Management – Responsible for leading and managing inter departmental projects and processes. Responsibilities include but are not limited to defining processes, data analysis to understand and mitigate project risks, tracking and managing project schedules, collaborating with IT teams during the analysis and programming phase, training, testing, and communication.
- Data Analysis – Design complex Microsoft Access databases connecting to AS400 tables to support project requirements and process improvement initiatives.
- EDI Project Leader – Responsible for working with external customers to define customer EDI requirements and implementing projects by collaborating with [company name]’s and customer’s business and IT teams.
- Technical Support – Manage day to day issues by collaborating with IT team and business process managers.
- Implemented a process improvement project with a 1.1 M dollar revenue increase – Winner of the Project Team Achievement Award for 2012 – 2013 Year.
- Winner of the Individual Achievement Award for 2012 – 2013 Year.
- Completed Green Belt certification.
6-10 years of experience
- Administered battery of tests consisting of IQ testing, Behavioral, and Risk Assessments
- Conducted both individual and group counseling sessions
- Leader in research project; compiled research data and generated report of findings
- Facilitated relaxation therapy and CAIR therapy sessions
- Developed and implemented behavioral treatment plans; Mentored residents
- Participated in team lead meetings regarding individual progress of residents
0-5 years of experience
- Trained five undergraduate students in bench-top procedures and clean room
- Planned and organized project related tasks and tracked the progress to meet the goals and deadlines successfully
- Managed the team by assigning tasks to each member and providing guidance
- Arranged weekly meetings with supervisor and group members
- Created effective and comprehensible presentations
0-5 years of experience
responsible for the upgrade and enhancements of PeopleSoft v8.4 HRMS, Benefits, Payroll, Time & Labor, Projects, and GL/AP/PO/AR/BI. Interfaced with business-user management and technical database groups. Strong functional business analyst with expert knowledge of Financials and HRMS.
- Analyzed and designed change processes in Oracle and data warehouse environments.
- Created rules to administer base, overtime, benefits, holiday, union and regulatory requirements within the Payroll and Salary Planning modules.
- Functional analyst for the overall HRMS GAP design.
- Created interface design documentation for compensation salary planning and payroll modules.
0-5 years of experience
Helped establish and lead a Project Management Office (PMO) infrastructure used to manage the strategic Internet Service Center (ISC) initiative
- Performed the large scale detailed planning, resource allocation, issue escalation/resolution, and senior management reporting required to successfully roll out two releases of the ISC, both on time and within plan
- Drove design and development of the “Web Channel”, a Lotus Notes tool used extensively by the ISC to control all project activities
- Ensured that [company name]’s software development methodology was followed on all key project assignments
- Coordinated all aspects of the Y2K certification and validation tasks on behalf of MIS
- Assumed overall leadership and management of the ISC, consisting of employees, consultants, and interns
- Ensured time reporting and weekly status reports were correct and submitted on time
- Received three Spotlight Awards and was promoted to Senior Officer
- Software tools utilized: MS Project/Word/Excel 95, Lotus Notes, Oracle, Java Script, HTML
0-5 years of experience
Provide project management for software system development and integration projects through all phases of project life cycle – analysis, design, development, testing, implementation, and post-production support.
- Led teams of subject matter experts, developers, and contractors.
- Worked with cross-functional teams to elicit, analyze, and document current system requirements and script specifications.
- Created and maintained project plans in Microsoft Project.
- Acted as a liaison between business partners, IT, testing, and vendor partners to assess business needs.
- Assisted with development and assumed responsibility for maintaining the Excel spreadsheet used for requirements traceability.
- Tracked and monitored issues and change requests via Bugtracker software.
- Developed test plans and monitored system testing to assure that the system enhancements met the business needs.
- Provided on-site implementation support and real time fixes and enhancements.
- Mapped and documented all data fields interfaced between the two products and designed and documented the functional flow of the interface.
- Responsible for database analysis and creating queries supporting processes.
10+ years of experience
Successfully planned and completed 200 stores conversion old Point of Sales to the new touch screen system three weeks prior to the deadline and within 9% below the budget.
- Task Force team Leader – identify program bugs, review and propose in-house software enhancement, introduce new tools/software & hardware to make processes work more efficiently.
- Review and test in-house software applications prior release.
- Troubleshoot hardware, software problems, & provide technical support for users.
- Train Help Desk staffs and other Field System staffs.
- Lead company ‘Sustainability & Green Initiatives’ team, reduced solid waste by 15%.
0-5 years of experience
- Led a 7-student team to produce a scientific review article on the biomarker-based diagnosis of Alzheimer’s disease and present findings to a panel of academic researchers.
- Awarded for the most outstanding project of 14 total teams.
- Performed further research and first-authored a manuscript that was recently submitted to the Journal of Laboratory Automation (JALA) for review.
- Recruited outside researchers and reviewers to ensure development of a publication-worthy manuscript.
0-5 years of experience
- Fabricated structural and bridge grade materials through use of Oxy-Acetylene Cutting Torch, Shielded Metal Arc Welding, Flux-Core/MIG, and Submerged-Arc Welding processes
- Exceeded project deadlines in a fast-paced and competitive environment, saving hundreds of thousands of dollars in material waste cost and superfluous man-hours
- Supervised groups of up to ten laborers in layout, fabrication, and erection of project components, while recording zero safety incidents
- Interpreted and accurately applied blueprints and diagrams in all phases of fabrication
0-5 years of experience
Created the Business Requirement and Conceptual Design Documents based on Business Owners specifications
- Created Test Plan and executed test cases for new initiatives
- Project Leader facilitating the implementation of technology development
- Supervised and monitored project timelines and team during a new development.
- Served as Meeting Facilitator to the operational and technical staff
- Chaired completion and dissemination of all communications related to a project.
- Worked closely with the Business Owners to resolve outstanding issues for the Business Owners.
- Served as Lead/participant in user acceptance testing.
0-5 years of experience
Worked with the client to create a project and remediation plan containing objectives, timeline, priorities, and risks. Constantly elevated the importance of the project and remediation schedule.
- Assisted clients in implementing hosted applications, web technology programs, FTP and more.
- Conducted phone and face-to-face interviews with clients to obtain the information necessary to complete project.
- With each project, provided guidance on team decision-making and problem solving. Provided feedback and daily project direction.
- Acted as the point of contact and escalation for support groups and internal businesses during recovery of major incidents.
- Worked with internal resources to troubleshoot technical issues associated with each individual project.
0-5 years of experience
Lead a semester long, four member team in the design a urea fertilizer plant
- Project scope included procuring raw materials, design reaction scheme, optimization,
- Facilitated discussions, mediated conflicts, and kept group dynamic in check
- Produced 100+ page reports, PFDs, P&IDs, and presentations regarding design
6-10 years of experience
Led project groups and worked individually to design and optimize synthetic chemical processes producing a catalog of generic APIs and fine and specialty chemicals
- Established clear objectives of project scope from conception through cGMP validation, adhering to aggressive timelines while building strong and trusted client relationships
- Performed process validation of generic APIs as either the primary operator in the kilo lab or pilot plant while providing technical assistance to other operators
- Assessed and investigated all critical process parameters to be incorporated into process validation protocols
- Demonstrated the ability to design robust processes that have been readily scaled-up from gram to multi kilogram commercial production
- Performed routine analytical procedures and thorough interpretation of data to monitor reaction kinetics and impurity formation by GC, HPLC, TLC, and NMR
- Designed purification methods to produce highly pure APIs and intermediates through recrystallization, distillation or column chromatography
- Provided technical leadership on laboratory technique and safe handling of reagents to less experienced chemists
- Wrote and finalized all production records and specification test records associated with cGMP projects, working closely with cross-departmental review teams
- Excellent documentation practices that has led to seamless scale-up of projects from development phase to commercial manufacturing
0-5 years of experience
Managed a 50 person deployment testing team consisting of site personnel, technical team, functional team, and SAP consultants to the timely completion of 3 cycles of full Integration testing for $100M+ Aerospace Manufacturing / Engineering facility.
- Monitored project status and led team in problem resolution, ensuring all technical / resource barriers to testing completion were effectively resolved.
- Delivered (daily / weekly / monthly) reporting of Integration Test metrics to upper management.
- Ensured test script completion and performed HPQC upload / maintenance of all test script scenarios.
- Coordinated development and execution of various complex cross-functional testing scenarios.
- Led Logistics functional team to timely completion of Government Property Business Process Design, ensuring all critical cross-functional touch points addressed.
- Collaborated with Manufacturing, Aftermarket, Project Systems, Sourcing and Finance in the conversion of Government Property Master Data ensuring effective cross-functional integration.
- Drove conversion of inventory from 4 site legacy systems to SAP IM / WM environment.
- Conducted SAP conceptual / transactional training for site users.
- Conducted IM Physical Inventory training classes, including system set-up enabling 6 sites to effectively perform Physical Inventory verifications in 2011.
0-5 years of experience
- As Game Designer, wrote the design document for the game “Kiwiâ€, a turn-based strategy game, which took one month to develop and is currently being networked into the “Lux†platform
- As Project Leader, organized the team working on “Kiwi†in order to progress development
- As Lead Researcher, performed sociological research for various grant applications and ongoing projects
- Assisted the Chief Operating Officer with grant research and applications
0-5 years of experience
Environment: OS/MVS, COBOL, CICS, VSAM, DB2, IMS, JCL, File Aid, IDCAMS, EASYTRIEVE,
ABEND-AID, FILE-AID, CICS-AID, CA-7, XPEDITOR, CODE COVERAGE,
MS PROJECT, VISIO, CLARITY, SHAREPOINT,
WATERFALL, ITERATIVE, AGILE, SCRUM MASTER
- Technical team lead with responsibilities including, staff performance for [company name] as well as off-shore contractors with regards to project completion estimates of programming/unit testing, technical documentation, third party offshore performance appraisals, assisting with interviewing potential work force.
- Estimated LOE, work load estimates and selection of staff to be assigned to project tasks
- Reviewed and time estimation for BRD, TDD, wrote and review TDD’s reviewed program specs, test plans installations processes
- Eliminated project roadblocks associated to project and coordinating with other teams a cross the [company name] ISD platforms.
- Assisted in mentoring programmers and P/A, and any junior staff team members,
- Introducing new technology for use of tracking defects that will reduce testing phases and upgrading standards and procedures.
- Designed an upgrade to the automated test environment setup for multiple project testing.
- Worked with multiple methods of project management techniques(Waterfall, Iterative, Agile)
0-5 years of experience
Acted as Project leader for a global SharePoint 2013 Project responsible for resources administration, task assignments, and sponsors projects follows and updates.
- Worked to improve the applications health and quality control in the different business units.
- Improved search results and efficiency to concentrate in a single application results from other data sources.
- Created a personal employee dashboard project designer and developer based on SharePoint MySites, to improve projects
- Developed an approval workflow to register and manage new travel requests for the employees in all sites around the world.
- Created timer jobs to send out emails on all open travel requests.
- Web based and desktop applications analysis, design, development, implementation and maintenance responsible.
- Shifts, times and resources control, workgroup activities and sprints programing, best methodologies planning and implementation, improvements and upgrades considerations and suggestions.
0-5 years of experience
Redesigned and implemented a quality control process with the focus of bringing [company name]. into compliance with ISO standards for the electrical transformer industry.
- Worked directly with chief engineer and used statistical analysis tools on a project that achieved cost reductions on the primary product line while adhering to industry quality standards (ISO compliance).
- Used my Excel abilities to identify the customer’s quality control documentation in order to comply with their standards.
- Streamlined business processes using my analytical and problem-solving abilities while prioritizing the important aspects in the process.
- Demonstrated an ability to work independently after limited direction from my supervisor.
6-10 years of experience
- Led change management initiatives with company-acquired organizations, domestically and internationally, focused on visioning, strategic hoshin deployment, customer experience management, and leadership and service training
- Project managed visioning sessions, adult learning centered ADDIE content creation, train-the-trainer materials, and organizational deployment for over 400 hours of original content in leadership, sales, customer service, and Lean for instructor led training and e-learning platforms
- Presented and facilitated courses in leadership, customer experience, sales, and service to over 5000 team members
- Certified facilitator for the DISC
- Project managed incentive and motivation programs for sales, customer service, and field service, with a focus on compensation, customer experience management, target pricing, and associate recognition
- Gathered and analyzed metrics for sales, field service, and customer service across multiple business units and presented organizational reports with proposed countermeasures for continuous improvement initiatives
- Facilitated quarterly strategic development conferences for leaders in sales, customer service, and field service
- Developed professional websites within SharePoint and crafted over 100 hours of unique e-learning content
- Mentored and coached new associate development from on-boarding process through integrated role assumption
0-5 years of experience
- Maintained and improved Engineering resource allocation and management database & provided support for various other databases
- Introduced time tracking software
- Document translations (German ↔ English)
- Analyzed data and reported results
0-5 years of experience
Project leader for MC8572 (90nm SOI, 1.5GHz core, 147M transistors) from first chip release through production.
Provided technical leadership for the ~30 member project team during silicon debug, bring-up, several revisions, and transfer to a 3rd party manufacturing foundry.
- Drove a cross functional team which investigated and identified the source of a 100MHz shortfall in expected
- Drove rev2 to include multiple other fixes required to fix design flaws.
- Achieved qualification and production on schedule with rev2.x.
- Coordinated the project with the 3 party contractor and delivered the design on time to an aggressive 7 month
- Drove a subsequent rev2 on-time release which enabled transfer to a 3rd party manufacturing house for production.
0-5 years of experience
- Resolved a key business/process challenge by rallying a team of engineers and scientists to develop a release coating that delivered a 10 fold improvement in the product life making the technology commercially feasible.
- Drove fast track projects with multi-disciplinary personnel to evaluate technology feasibility in various industries including pharmaceuticals, medical devices, etc. Resulted in a commercial (projected value: $2MM/year) and two development contracts ($1.9 MM).
- Designed key studies to deliver technical input in developing and optimizing pilot and production machines to perform nanoscale embossing.
- Provided top management with PMI guidelines based PM plan for business expansion. The plan included WBS, detailed schedule, scope statement, resource requirements, flowcharts and risk analysis (with mitigation strategies), etc. across different divisions.
- Led team of engineers to optimize and transform a bench top prototype into a commercial grade offering (throughput: 1MM units/8hr shift).
- Managed the development of software to operate a Scanning Electron Microscope for performing micron scale image capturing and subsequent processing.
- Performed performance appraisals and devised professional development plans for direct and indirect reports.
0-5 years of experience
Agreed to a Non-Disclosure Agreement regarding projects and specific information
- Led a research project with minimal oversight.
- Responsible for identifying, understanding, monitoring, and qualitative analysis of corporate compliance and ethics standards.
- Interpreted data to determine adherence with corporate ethics standards and review compliance efforts in each risk area.
- Generated research reports, data charts, graphs, and tables for presentation to clients and managerial staff.
0-5 years of experience
- Led a team of college students in a community leadership and service initiative in cooperation with Hebrew Rehabilitation Center
- Conducted trainings for students to ensure geriatric and cultural competency in healthcare, as well as oral history collection skills
- Planned and implemented a year-long schedule that culminated in the production of a bilingual book and presentation
- Managed budget and project goals for a cross-functional team; Developed and pursued partnership with HIAS to expand project reach
0-5 years of experience
- Analyzed $4.7Mn of fastening plant inventory to identify opportunities for inventory reduction, working capital turns (WCT)
- Recommended strategies like increased shipping frequency, MOQ reduction, consignment inventory to target plant inventory
- Collaborated with Global Supply Chain Strategy team to establish plant inventory levels at $2.43Mn based on Bill of Materials and finished goods sales. Provided template to leverage this process across 16 manufacturing locations.
- Created Supplier Performance Scorecard to evaluate service levels and inventory levels on weekly basis. Communicated to suppliers and cross functional team comprised of sourcing and supply planning personnel.
- Led SKU Rationalization project aimed at complexity reduction, WCT improvement to drive SBU performance.
- Responsible for setting up performance targets for SBU product families and analyze over 2000 SKUs to deliver monthly reporting on
- Presented quarterly report to senior management including Sr. President, VP of Operations, SCM Directors and Product Managers on project status and potential business impact.
- Responsible for weekly reporting on service level, excess & obsolete inventory and PO De-expediting using Business Objects.
0-5 years of experience
Sustaining Engineering Leader responsible for management, planning, and customer interface for new projects and project extensions. Coordinate with other Creation Manufacturing and Design Business Units for engineering resource allocation.
- Managed 5 contract engineering projects for medical devices.
- Wrote proposals for several contract designs for a wide variety of customers and product ideas.
- A contributing engineer on a variety of projects, including PCB design of a CAN bus protocol adapter, an electronic catheter, and 12-Lead EKG medical equipment.
0-5 years of experience
Coordinated the completion of projects assigned by the Director by effectively problem solving and prioritizing the tasks required to get the project done
- Accurately prepared medical records for outside storage
- Assisted physicians with medical record completion
- Accurately processed discharged patients medical records
- Answered phones providing information regarding patients’ medical records
6-10 years of experience
- Project leader implementing VMware ESXi 5.0 host and converting Linux Data base Server into virtual machine with a VEEAM 6.5 client to backup VM to network storage location.
- Created multi-site IPSec VPN tunnels enabling IP network between main office and remote data centers.
- Managed the complete network installation and configuration from ground up for a newly established company.
- Lead projects converting physical servers into VM’s for both VMWare and Hyper-V on HP DL 380 and Proliant 310e Gen 8 server hardware.
0-5 years of experience
Project Manager over multiple projects that come through the Project Management Office.
- Schedule meetings to kick off projects and during the implementation process.
- Responsible for documenting the project plan in Microsoft Project Server, then publishing the project plan to a Sharepoint site for MethodM.
- Responsible for teaching new associates how to use MethodM for completing their assigned tasks.
- Managing an average of 6-7 over 80 hours of project work and 15 under 80 hours of work.
0-5 years of experience
- Built and managed plans for projects ranging from quick-turnaround to large-scale, 6 to 9 month CMS/Web site implementations.
- Managed and built client relationships through a deep understanding of their business and collaboration with all stakeholders.
- Led cross-functional teams, including designers and developers.
- Regularly communicated with internal project teams and clients to achieve objectives.
0-5 years of experience
Function as Project Manager for network access improvement collaborations with major provider entities, the Provider Relations department, and compliance initiatives.
- Manage timeline, tracking mechanisms, and workgroup coordination for RFPs and proposal development.
- Assist in managing project scope to ensure goals and objectives align with business needs and facilitate successful project closure.
- Establish and conduct team status meetings, communicating schedule impacts and lessons learned to ensure timely execution.
- Acquire and analyze data to resolve operational issues and identify opportunities for cost improvement strategies.
- Employ risk analysis of project specifications to mitigate exposure to compliance issues and provider network impact.
0-5 years of experience
Promoted to Project Leader (including back-up to regional Senior Project Leader)
- Single point of contact for designated customer base including but not limited to program management and field coordination
- Definition of customer requirements and subsequent fulfillment management and recruiting
- Continuous customer and contractor communication
- Service product design and proposal participation as well as contract review support
- Account retention and development (e.g.: conducting research identification of business and customer development opportunities)
0-5 years of experience
Portfolio/Program management and ownership of internal Business Systems and Operations projects
- Projects within the areas of Finance, Human resources, Telecommunications, Enterprise Data management, and Sponsor supporting applications
- Engage business leaders and vendor consultants to develop business solutions
- Mentor newly hired Project Managers
- Champion and process development for project tracking tools such as Planview application
- Corporate leadership reporting and accountability on a regular basis