- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Information Technology Resume Samples
Test Manager Resume Samples
No results found
0-5 years of experience
Directed test planning, execution, and reporting in support the National Science Foundation’s Grants and Management program. Supervised staff of 20-plus testers and administer more than $5M in QA/Test resources annually. Planned and managed all functional and automated testing for more than 25 applications.
- Improved efficiency and reduced test cycle by increasing automating test script execution by 70%.
- Increased test artifact documentation more than 100% across all applications supported.
- Implemented initiative to establish performance test baselines for the 100% of applications supported
0-5 years of experience
Developed and managed a test organization consisting of over 60 testers on a large healthcare project for Centers for Medicare and Medicaid Services (CMS)
- Developed best practices and procedures to be used by the entire team which spanned various internal projects
- Administered and maintained HP Quality Center including creating projects and users, customizing workflows, and training the entire organization of over 450+ users
- Responsible for creating detailed project plans and work breakdown structure plans to illustrate resource allocation and scheduling tasks using MS Project
- Participated in regular meetings with upper management to communicate accomplishments, plans and issues as well as any risks to the project’s progress
- Chaired a working group to develop automated test scripts using Quick Test Professional in a complex Service Oriented Architecture based environment
0-5 years of experience
Responsible for management of projects pertaining to laboratory testing of drilling, formation evaluation and surface data logging tools
- Led the planning and execution of 40+ laboratory test campaigns (including functional, performance and environmental tests – thermal, vibration, pressure vessel, erosion) and tool assembly/troubleshooting
- Participated in the verification, validation and commercial release of the GeoTap IDS tool, helping to generate $2M in monthly revenue for the company
- Provided direct technical guidance to 70+ engineers, designers and technicians (both local and off-shore)
- Developed and maintained project schedules, tracked and forecasted project costs and labor hours, and managed project risks
- Managed procurement of $2M+ worth of test assets including test articles and test setups
- Negotiated test requirements and test strategies, and served as a liaison with internal customers and outside vendors
0-5 years of experience
Managed day-to-day development life cycle tasks and support operations for an eight-person team.
- Provided Quality assurance on project deliverable releases based on Agile schedule.
- Created and maintained project baseline release requirements using SaaS Jama contour requirements database.
- Synchronized requirements as JIRA issues were assigned to the lead developer to track development LOE.
- Led clients’ projects through Enterprise ITIL Service Delivery into production.
- Created Tier1 help documentation support clients transition into operation and maintenance (O&M).
0-5 years of experience
Successfully managed software QA team of 10+ people. Implemented ecommerce Quality programs and roadmaps in a multi vendor delivery model.
- Effectively lead teams with various staffing models of internal and external on-shore and off-shore resources. Provided leadership and supervisory oversight to quality assurance.
- Improved and maintained programs and processes for quality. Improved defect identification and remediation cycles. Implemented programs to identify and drive early test adoption and Agile principles in all projects, validated functional and non-functional requirements.
- Successfully implemented test automation using JBehave, Selenium, Java/JUnit.
- Reviewed technical specifications/limitations and constructed reviews of technical approach including application capacity reviews.
0-5 years of experience
Staffed and managed team of 13 software QA test engineers supporting multiple mobile email and messaging (MMS/SMS/IM) solutions for mobile handset programs. Managed team distributed across 4 sites to perform functional testing, user interface testing, internal beta testing and performance/stress testing activities.
- Built cohesive test team who shared best practices, test responsibilities, and supported reuse of test cases. Increased test coverage and efficiency without increasing test engineer headcount.
- Successfully leveraged resources across multiple projects to do more with less. Consistently met project milestones for multiple simultaneous projects.
- Coordinated test strategy development, project planning, scheduling, allocation of test engineers to programs, ensuring test environment availability, generation of test reports, communication of test status, and networking to coordinate test activities.
- Coordinated with partners to document and assess acceptance criteria for 3rd party email solutions.
- Pushed for improvements in software development practices to increase software maturity prior to delivery to test team.
- Focused on employee growth to give test engineers visibility and accountability for their work. Recognized by managers for ability to get the most out of individuals.
- Greatly improved integration of test engineers with development teams resulting in a cohesive work environment.
0-5 years of experience
Led the Xbox Compliance Lab team of 55 through operating cost cutting measures and performance enhancing strategies. Analyzed process flow, identified weaknesses and sourced stronger IT staff.
- Restructured internal reporting around leads; drove accountability closer to direct teams, speeding test builds from four to more than eight per day
- Saved $10,000 per game release by lowering employee costs while increasing efficiency
- Reduced Xbox certification expenses 20% by streamlining reporting and organization processes
- Developed review and lead processes to improve client documentation and reduce retesting needs
0-5 years of experience
Managed and gave daily direction to a team of test engineers in China during pre-Factory Acceptance Test (FAT) on a safety reactor protection system.
- Provided technical feedback to Developers.
- Wrote Test Execution Plan, Test Readiness Review, Test Process, Test cases
- Responsible for coordination and direction of all software testing activities.
- Developed, implemented and maintained detailed project schedule to successfully coordinate multiple activities. Communicated critical issues and regular status updates to staff and senior management in a timely manner.
0-5 years of experience
Managed Safeway QA team for the Next Gen POS 1. 0 project and GS1 Databar and Extended Links
- Created test plan, traceability matrix and ambiguity reports according company testing standards.
- Created and tracked test and deployment schedule using MS Excel and MS Project
- Managed test execution and defects reporting utilizing HP Quality Center, IBM lotus Notes and MATRA Issue log. Documented issues and assisted POS group in identifying and documenting procedure changes. Setup and manage a test lab environment to ensure system availability for testing.
- Implemented Regression Test Tool for the execution of test scripts to test POS 4960 enhancements for GS1 standards compliance and POS stability according to the received technical documentation.
6-10 years of experience
Manage design improvements, production line sustaining activities, Engineering Change, material/parts obsolescence, supplier, quality, production build & test issues on a fast response basis to reduce factory down-time and restore yield levels. Manage Instrument Test Lab for IRAD, engineering development, production line support, and field return testing of ring laser, fiber optics, and resonator gyroscopes, as well as legacy and MEMS accelerometers. Ten direct reports.
- Achieved 3X failure rate decrease of the ring laser gyros production line over the last three years
- Managed upgrade of 5,000 ft2, 30+ year-old lab, with uninterrupted operation, through asbestos abatement, 4X increase of gyro test throughput and 10X increased test performance capability. Implemented work-around plan to overcome lack of capital budget for lab equipment and instrumentation.
- Led engineering, build, test, and delivery of customized gyroscopes for Air Force satellite. deliverables were completed on time for subsystem integration and test. Units exceeding performance expectations.
- Managed Cost Account for Gyro delivery and Radiation Lot Acceptance Testing
0-5 years of experience
Provided guidance and coordination of all testing activities for the Enterprise Data Initiative program. Indirectly managed 5 UAT Testers for releases.
- Coordinated with UAT teams on testing resources and timelines, content being tested, ensuring requirements trace back to test scenarios and cases, and ensuring who is responsible for the requirements being tested.
- Gathered information, wrote, and obtained sign-offs from stakeholders on the Test Strategy and Test Plan for each release.
- Met with UAT teams to mitigate any questions or concerns regarding testing, coordinated meetings with technology, and held walkthroughs and reviews for the Test Strategy, Test Plan, Test Scenarios, Test Cases, and any other testing related documentation/activities.
- Ensured all documentation aligns with Project Governance standards from Enterprise PMO.
- Participated in test status meetings and ensure testing status updates, including issues, defects, and any clarification needed, are communicated.
- Suggested process improvements related to testing activities.
- Ensured that test activities are aligned with the Project Plan and ensured timely delivery of testing milestones.
0-5 years of experience
Developed requirements documentation
- Developed test scripts to sufficiently test all requirements for new functionality and regression testing for the existing mainframe system
- Facilitated defect tracking, resolution, and reporting
- Coordinated testing efforts to ensure process efficiency by defining accurate set-up of test data, defining daily tasks, and providing leadership for switching gears when defects were being addressed
- Assisted the project manager in resource allocation for the 20+ team members
0-5 years of experience
Managed and lead teams up to 14 people to compile test plans, procedures, and schedules to test software updates/releases through SDLC on most Windows OSs
- Collaborated with R&D and product owners to understand the scope of the projects/requirements and acted as a single point of contact between departments
- Managed team members’ workload and assigned tasks appropriately based on their expertise and capability for better performance while met the delivery schedule
- Purchased, setup, executed and administered Hardware operations and support consisting of Schneider Electric Modicon Quantum, ControlLogix PLCs, ASi, and Modbus TCP devices/gateway for process control/simulations
- Utilized layer products such as PAS, OSI PI, Loop Tuning, Excel Macro/Visual Basic, Bash-Shell Script for process applications
- Familiar with DeltaV process system’s hierarchy, Control Modules, Loops and batch language for operation and know the use of SFC to simplify the common process
- Presented assignments’ status and updates to Product Manager on a weekly basis
- Maintained and obtained control system’s health, recoverability and backups using scripts along with other automate tools to minimize downtime
- Assisted industrial customers with 21 CFR Part 11 compliance validation and S-88 Batch Production and Manufacturing for recipes and modeling during upgrades with in-house products
0-5 years of experience
- Managed 20+ person functional automation and performance testing team, including interviewing, on-boarding, training, periodic performance reviews, and release.
- Defined, implemented, and managed automated functional and performance test procedures and processes: Scope definition, test case creation, delivery estimates, automation library design, test scheduling, progress reporting and quality signoff.
- Designed, documented, implemented and maintained testing engagement workflow process for technology partners.
- Presented weekly/monthly updates on testing plans, status and progress to business partners, stakeholders and organization management.
- Collaborated with various vendors to review, compare, select, implement and administer third party testing tools.
0-5 years of experience
Led a team of 6 members for the System/Integration Testing phase of the project.
- Developed a test plan, test specification, test scripts and traceability matrix to cover testing for all functional and non-functional requirements.
- Co-ordinated and led defect meetings to prioritize, assign and resolve defects. Co-ordinated integration testing with 3rd party systems that integrated with our system.
- Architectural components for this project included FileNet P8, IBM Content Navigator (ICN), IBM Content Collector (ICC), Brava Viewer and a custom ICN web application.
0-5 years of experience
Lead tester responsible for implementing quality assurance test methodology to execute
functional baseline test, conversion test, remediation test, and Y2K certification on a
PeopleSoft-Financial System panels and SQRs for the NSADAQ stock exchange.
- Manage team of 3 test engineers responsible for implementation manual functional testing.
- Developed test plans , test scripts, test data, test summary reports, resolved project scheduling and testing issues, represented the team at project meetings and prepared the weekly status reports
- Managed schedules and tracked projects. Increased efficiency and productivity.
0-5 years of experience
Re-designated to the position as Test Manager. Leading a team of 4 test engineers and 2 Associate Engineers.
- Worked with test operation team in resolving daily engineering issues, prioritizing test engineering and production activities.
- Coordinated for test transfer from TSMC customers, debug and resolve test program issues.
- Learn basic wafer fabrication process and its team’s structure.
- Took part in new product and technology transfer from head quarter, involving Process Integration, Product Engineer, and Test Engineer. Establish test capability for the product in [company name] involving vertical probing and new tester hardware installation.
- Observed many good management systems in [company name] in organization, quality, test, product, yield, etc.
- Motivate and coach team members in achieving department KPI.
0-5 years of experience
- Created testing repository and documentation on overall functional test and high level strategy for end-to-end testing.
- Collaborated with 5 Line of Business testing teams to identify, document, and review the scope, timeliness, and risk associated with the project
- Facilitated daily test meetings to discuss Quality Center defects, resolution strategies, and triage sessions.
- Generated daily defect reports and testing status reports for the leadership team.