- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Maintenance Resume Samples
Utility Engineer Resume Samples
No results found
6-10 years of experience
Bench marked best practices at SC plants and BP UK plants in 2000 to reorganize the plant from a functional to a product line organization resulting in reduced operating costs by about 30%.
- Saved $350K annually via $3K investment to capture waste DMSO from entering WW system
- Improved operation of the UVP WW system to eliminate POTW odors from 70 to 0
- Used Six Sigma to eliminate CN violations in our UVP WW system by controlling pH eliminating potential plan to invest $800K
- Boiler feed water pump mechanical seals continually failed leaking oil into the storm water – resolved issue and eliminated potential violation
0-5 years of experience
Organized daily, weekly and monthly scheduled maintenance tasks.
- Insured monthly water utility budget was balanced.
- All fire prevention equipment was maintained and tested to insure 100% opera ability.
- Organized and supervised maintenance teams on all off-site functions to include Salinas Air-show, Cherry’s Jubilee and Salinas Trail Ride.
- Consistently recognized as an individual that would accomplish all tasks properly.
- Able to deal with adverse situations on a daily basis and insured they were completed to maximize patient safety and comfort.
- Always recognized by hospital CEO and department directors for prompt professional service.
0-5 years of experience
Evaluated and developed operational procedures and actions plans which identified key projects and reduced energy consumption for the plant by 5% on a $14MM budget.
- Developed and managed the maintenance plans for the sites critical utility equipment. Site has nineteen high speed productions lines and a four acre chemical production facility.
- Managed the utility maintenance staff and external contractors for major rebuilds and the development and application of operational centerlines documentation.
- Led the effort to evaluate the sites utility equipment and prioritize the rebuild and defect repair schedule.
- Created LOTO procedures for packaging robot systems and trained entire warehouse staff per OSHA requirements.
- Develop and managed small capital projects relating to cost savings and major utility equipment rebuilds
0-5 years of experience
Responsible for operation of on-site power house, including water treatment, steam generation, evaporative cooling systems, plant instrument air and inert gas systems and on-site 7.5 MW co-generation system.
- Monitored and optimized combustion efficiencies of two large 300 psig industrial boilers resulting in $500K savings per year.
- Supervised maintenance contractors and coordinated water treatment service contracts for plant.
- Worked closely with plant Engineering, Maintenance and Production departments to provide reliable support systems for operations.
- Directly supervised a crew of licensed union boiler operators. Duties included training and coaching personnel, reviewing data and making required process changes for efficiency and operations, procurement of operating supplies, scheduling and prioritizing maintenance activities. Optimized chemical additions, boiler blowdown, and water treatment regenerations which resulted a chemical savings of $75,000/yr.
- Consulted equipment manufacturers and appropriate specialists to resolve equipment problems.
0-5 years of experience
- Planned and successfully executed in excess of 30 projects, utilizing geography background to ensure all projects came in under budget.
- Managed crews of workers, creating high functioning teams to optimize project outcomes.
- Direct responsibility for fleet of company trucks and heavy equipment.
- Worked individually and in teams, demanding and maintaining 0% damage and 0% injury rates.
0-5 years of experience
Contributed in the Engineering department to achieve a passing score in JCAHO auditing for 2005
- Provided Fire safety awareness throughout all departments
- Responsible for maintenance, lighting and building knowledge for other staff and patients
- Displayed excellent patient services if and when needed while also working on prioritized engineering projects and issues
0-5 years of experience
Performed work involving the skills of a Utility Engineer and assisted the Building Engineers to maintain 8 two story commercial and industrial buildings
- Performed routine maintenance of the plumbing equipment and rebuild faucets, and Sloan systems
- Performed general maintenance such as dry wall repairs, painting, basic carpentry, replacement of stained or broken ceiling tiles, repaired roof leaks, replaced burned out fluorescent light bulbs
- Performed routine maintenance in clean rooms and data rooms
- Completed all maintenance work orders in a timely manner
0-5 years of experience
Collaborated with team members to establish viable support of manufacturing standards.
- Provided ongoing production support and trouble shooting of company product.
- Possessed strong problem-solving skills.
- Proven top quality workmanship.
- Well demonstrated ability to operate machinery for sanding and polishing with precision and top quality.
- Demonstrated talent to learn new tasks quickly and accurately.
0-5 years of experience
Reviewed work of private technical professional consultants for compliance with City ordinances and regulations.
- Provided recommendations and necessary revisions to consultant professionals, private contractors, and plan check staff on development improvement plans.
- Applied engineering principles and procedures to select and size water fixtures and developed recommendations.
- Generated cost estimates for construction permits.
- Researched and analyzed City water, reclaimed water and sewer documents and codes for consistency, clarity and comprehension.
- Prepared reports for water, reclaimed water and sewer Capital Improvement Projects.
- Coordinated engineering activities with other City departments, divisions and sections.
- Provided information, assistance and responded to inquiries related to City improvements.
- Updated engineering standards, specifications and design criteria.
0-5 years of experience
Facilitated daily maintenance for administration buildings, guest inns, technical buildings, underground park facilities, sound stages, and two full service restaurants.
- Provided electrical, plumbing, and carpentry repair and maintenance.
- Managed Indy Help Request Software System used for tracking work requests for employees and clients at Skywalker Ranch.
- Ordered maintenance supplies for Ranch Services.
- Interacted with construction vendors for ongoing yearly project at Skywalker Ranch.
0-5 years of experience
Performed as the head engineer for all utilities systems in multimillion-dollar hummus plant expansion.
- Lead the design of process water, glycol cooling, compressed air, and steam/condensate systems.
- Created specifications for specialty equipment used in major food processing plants.
- Sized process lines and equipment such as centrifugal/positive-displacement pumps, heat exchangers and vessels.
- Managed large groups of contractors throughout the installation phase of the process and utility piping and equipment.
- Responsible for the procurement, installation and initialization of over 2,000 sanitary process valves.
- Actively participated in the start-up and commissioning of utility and process systems while meeting client- mandated deadlines.
- Optimized process and utility systems by analyzing product characteristics and properties through a Human
0-5 years of experience
- Provided entry-level to mid-level contract engineering services for Georgia Power Company.
- Prepared necessary work orders for permitting and coordination of work tasks with joint use commercial communications/utility companies.
- Conducted field checks and engineering of telephone, traffic, cable TV and power attachments to meet all National Electric Safety Code requirements.
- Supervised engineering assistants to complete fieldwork and work order reports in efficient and effective manner.
6-10 years of experience
Worked on 220 water-cooled chiller units; replacing motors, actuators, thermostats, and soldering pipes
- Worked on Gardiner Trane units, using ampere meters to help diagnose problems
- Diagnosed mechanical problems and determined how to correct them, checking blueprints, repair manuals, or parts catalogs, as necessary
- Assembled, installed, and repaired wiring, electrical components, pipe systems, plumbing, machinery, or equipment
- Inspected drives, motors, belts, checked fluid levels, replaced filters, and performed other maintenance actions, following manager’s checklists
- Performed routine preventive maintenance to ensure that machines continue to run smoothly, making sure building systems operate efficiently, or the physical condition of buildings does not deteriorate
- Used tools ranging from common hand and power tools, such as hammers, hoists, saws, drills, and wrenches, to precision measuring instruments
- Inspected and test systems to verify system compliance with plans and specifications or to detect and locate malfunctions
- Repaired and replaced defective equipment, components, or wiring
- Complied with all applicable standards, policies, and procedures, including safety procedures and the maintenance of a clean work area
0-5 years of experience
Provided graveyard shift coverage for engineers at this location.
- Assisted engineers in planning and execution of various work projects.
- Maintained equipment records and produced reports for chief engineer.
- Performed preventative maintenance on hvac and building systems such as cooling tower, air handler units and generators.
0-5 years of experience
Duties included replacement of air filters, general cleaning, painting of engineering spaces, lamp replacement and lighting inventory. Worked with journeyman to complete PMs. Repaired and replaced door hardware.
- Calibrated pneumatic thermostats and troubleshot VAV problems
- Traced out all outlets in a suite and updated the panel schedule
- Adjusted door closers and coordinators for 50% of a building
- Replaced aerators and flushometers to low flow use devices
- Tested the cooling tower water and added chemical as needed
- Pinned lock cylinders and copied keys
0-5 years of experience
Led investigation of HVAC systems including utility services capacity and limitations (i.e.: Medium temperature hot water, chilled water and steam):
- Remediated heating, ventilation, and air conditioning (HVAC) systems issues & recommendations serving critical production areas to ensure specified environmental conditions were achieved.
- Managed review of Building Management System.
- Drove energy efficiencies through completion of operational checks and review of HVAC instrumentation.
- Conducted design review of air handling units and ductwork heating battery duty capacities.
6-10 years of experience
- Supervised 10 tradesmen in the operation, repair, and maintenance of all Powerhouse equipment.
- Set up the initial Mp2 Preventive Maintenance program for the newly commissioned Powerhouse at the facility.
- Maintained extensive equipment operating data reports.
- Generated Powerhouse punch lists during the initial equipment warranty period, and ensured a satisfactory completion of these lists by contractors.
- Generated progress reports for facility Management.
0-5 years of experience
Daily maintenance, Installation, and repair for all tenant project requests, building utilities, facilities, and equipment.
- Daily work order and building Inventory updates
- Assist in all FLS( Fire Life and Safety) equipment and operations
- Provided backup support and assisted Chief Engineer on all building issues and projects
- Some experience in E-Mon D-Mon system
10+ years of experience
Coordinate and respond to service issues requiring maintenance for the Westin Hotel & Sheraton Hotel, Crown Center Complex offices and retail, which is 23,000 square foot complex. Both hotels are four star with a total of 1,500 rooms & 40,000 foot of conference space.
- Responsible for ensuring that the maintenance for minor HVAC and refrigeration centers are completed in a timely manner and that they are operating as they should be at all times.
- Ensure that the internet and telephone service in hotel rooms and retail offices are always working correctly. If connections are not working a diagnosis must be made and the issue resolved.
- Project manager for coordination of construction and remodeling projects within the hotel.
- Certified in pool maintenance and operation.
- Coordinate the maintenance and set up for hotel events and conventions with outside vendors and hotel event planning teams.
0-5 years of experience
Was responsible for working on all types of water mains, including services and mark outs for commercial and residential remodeling and new construction projects throughout the Orange area.
- Supervised 5 professionals in plumbing work, brick-laying, road work, sewer work, concrete forming, and excavation.
- Ordered construction materials and blueprint updates.
- Consistently met strict time deadlines.
- Flagged motorists to warn them of obstacles or repair work ahead.
- Placed signs and cones around work areas to divert traffic.
0-5 years of experience
Operate, maintenance and repair of pumping, heating, ventilating, air conditioning, refrigeration,
plumbing, water storage and multiple distribution systems, steel storage tanks, relief valves and power generating equipment to ensure operation of equipment is within design capabilities and
achieves environmental conditions prescribed by manufacturer.
- Paint and repair roads, windows, doors, floors woodwork, drywall, and other parts of building
- Inspect and test new and existing machinery and equipment for safe, efficient and proper
- Make entries and keep records on shift operation by taking and entering gauge readings and accurate temperatures on operating log sheets to ensure preventative maintenance and equipment history
- Maintain keys and communications equipment in order to respond quickly to emergency situations
- Perform any other related duties as required.
0-5 years of experience
Monitored alarms regarding all of Genentech Assets including critical and non critical equipment
- Trained/instructed FMS Operations on the department policies and SOP’s.
- Assisted B&G Crew w/ various assignments (lighting, filter replacements, and Super Q PM’s).
- Assisted CFS Crew on Validated Equipment PM’s (Compressed Air, AHU and AC units).
- Observed Building Load Transfers and Generator PM’s.
- Repaired mechanical seals, motor bearings, and diaphragm replacement.
0-5 years of experience
- Maintained heating and cooling systems, boilers, chillers and cooling towers
- Replaced filters and belts, and performed monthly PM’s on guests rooms
- Completed all maintenance repairs throughout hotel
0-5 years of experience
- Performed urgent corrective, routine, and requisitioned repairs of electrical, mechanical, and plumbing
- Inspected and replaced lighting devices and handled preventative maintenance of air handlers.
- Prepared and painted indoor and outdoor spaces and maintained grounds and facilities.
0-5 years of experience
Developed new plant wide bar code system.
- Maintained accurate shipping records and managed all material system transactions.
- Supervised shipping material handlers.
- Managed reports and billings to each department.
- Supervised material flow for all manufacturing lines.
6-10 years of experience
Maintained adequate water storage tank levels and pressures to meet water demand.
- Measured and adjusted chemical feed rates.
- Retained tank levels and flow rates to meet water demand.
- Performed minor mechanical work and routine equipment maintenance.
- Implemented process changes.
- Recorded inside and outside process readings on daily log sheets.
- Procured materials and supplies to complete daily tasks.
- Adjusted pumping systems, chemical feeders, auxiliary equipment, control systems storage tank levels and pump stations indicators.
- Monitored flows, pressures, chemical feeds levels and water quality indicators.
- Conducted safety inspections and followed safety rules and procedures.
- Handled preventive and corrective maintenance to maintain proper equipment safety and functionality.
0-5 years of experience
Responsible for performing general maintenance work to ensure that property maintenance quality and safety standards are achieved and maintained.
- Performing minor repairs on guest rooms
- Repairing and cleaning ventilating filters in guest rooms
- Cleaning, repairing and maintaining ducts and fan units
- Replacing incandescent light bulbs and cleaning fixtures
- Assisting journeymen as appropriate
- Responsible for timely completion of all phases of apartment make ready work, troubleshooting and repair of most major and all minor mechanical systems.
- Responsible for unsupervised, timely completion of occupied apartment service requests in accordance with predefined company and property standards.
0-5 years of experience
Construct and analyze weekly KPI reports to reveal plant performance with regards to utilities. Based on indicators advised operations in methods to improve metrics.
- Implement sustainable steam tracking program to increase power generation as well as decrease maintenance cost by improving reliability.
- Brainstorm new energy saving/generation ideas, and evaluate savings as well as cost of implementation
- Optimize the compressed air system to increase overall plant reliability in addition to decreasing utility power consumption. Savings equivalent to
- Decrease water consumption by 500 GPM by reusing techniques as well as implementing new projects leading to low cost investment with high margin gains.
- Perform weekly safety audits to ensure maximum safe procedures are being followed.
- Create drafting designs for high school robotics aid team program.
- Design and create proposal for Bucket Elevator capital project.
- Provide root cause analysis for bearings, conveyors, dryers, shakers, blenders, and pumps.
- Provide inspection support during sulfuric acid turn around plants.
0-5 years of experience
Responsible for performing operations and maintenance activities including preventative, corrective and general maintenance and repair of equipment and building for boilers, chiller water systems, VIV boxes, HVAC, air handlers, etc.
- Perform and document routine engineering rounds to ensure proper functionality of equipment and safe operation
- Ensure city codes and permits are current and meet regulation
- Assist staff as needed with miscellaneous duties
- Maintain documentation of equipment, timesheets, inventory, purchase orders, etc.
0-5 years of experience
Prepare monthly energy usage and analytical report for more than 50 malls across the country.
- Work with property owners to optimally, yet cost-effectively, redistribute master-meter utility costs to their tenants.
- Perform load studies for each tenant of a mall to accurately tabulate electric, HVAC and water usage.
- Offer invaluable advice to property owner on a large variety of energy efficiency initiatives with pay back period calculations.
10+ years of experience
Responsible for engineering studies, plant start up, diagnostic & efficiency tests, power equipment maintenance, protective relays, metering, facility inspection, and NERC/WECC reports.
- Commissioned six pumping plants and one hydroelectric power plant.
- Retrofitted all 13.8kV Air Circuit Breakers with Vacuum Contactors.
- Installed auto-oscillation system, fixed rotor squirrel-cage bars, and rewound stators
- Refurbished burnt Hyatt Unit 5 and sheared shaft coupling in one generator in SLPP
- Replaced rotating amplidynes with Westinghouse PSS-equipped Solid-State system
- Executed revenue meter maintenance MOU/LOA between CDWR and PG&E, SCE, MWD and LADWP.
- Rewound 13.8kV stator windings of motor pumps in six pumping plants.
- Implemented IEEE 115 efficiency testing by segregated losses in two units at Banks Pumping Plant.
- Installed & commissioned the Remedial Action Scheme (RAS) in eleven plants, Tetragenics Control/SCADA System.
- Established relay settings, EMI Monitoring of rotating machines, breaker maintenance test & procedures.
0-5 years of experience
- I acquired the skill and responsibility of fixing safety hazards by welding and use of skilled repairing.
- I was responsible for snow removal, pressure washing store fronts, operating a Bobcat tractor to remove debris, and landscaping of the twelve acre property.
- I worked alongside our security, local law enforcement, and my peers to ensure our guests as well as our merchants had a safe clean environment to enjoy.
6-10 years of experience
- Ensured proper operation conditions by closely monitoring all shipboard systems (e.g. pneumatics, hydraulics, lube oil, and others), and performing general maintenance and required repairs.
- Educated deck watch standers on the proper maintenance of engine-room conditions with respect to security rounds.
- Managed all shipboard lube oils, fuel oils, and ballast and fire systems up to code.
- Ensured that four electro-motive diesel engines operate properly and remain well-maintained for main propulsion and 4kv unloading system, steam boiler for deck-side operations, and shipboard auxiliaries (Caterpillar 3512 diesel generator); conducting extensive welding repairs and improvements for vessels.
0-5 years of experience
Answered service request from tenants
- Responsible for general upkeep and maintenance of common areas.
- Monitored and made minor repairs of air conditioning system for the building
- Painting and making vacant office space ready for new tenants
- Responsible for general building maintenance
0-5 years of experience
Responsible for reducing utility costs incurred by an expansive manufacturing facility. Developed skills implementing operating procedures, developing project schedules, coordinating fabrication of equipment, selecting vendors, preparing reports and reading and interpreting technical drawings, schematics, computer generated reports and P&ID’s.
- Project Engineer for installation of water-cooling tower
- Lead engineer for utility cost-reduction projects
- Promoted to Finishing Engineer
6-10 years of experience
- Responsible for everyday activities as a Journeyman Engineer
- Responsible for Engineering Budget of $1.3 million
- Coordinate daily preventative maintenance and departmental projects along with hotel work orders and hotel remodel projects.
- Completed apprenticeship while acting as Assistant Chief
0-5 years of experience
- Perform engineering and economic analyses to regulate gas and water utility rates
- Perform statistical analyses to normalize data and project future customer usage and sales
- Analyze operation, maintenance, and construction costs of gas and water utilities
- Participate in field inspection programs to ensure utilities are providing safe and reliable service
10+ years of experience
- Acted as an ambassador of Valley Care for patients and visitors.
- Assist in planning and implementing of parking policies.
- Inspected and maintained fire extinguishers monthly.
- Transport donation to recipients and or departments.
- Maintain a respectable appearance of hospital grounds.
- Experience using de-escalation techniques for security.
- Trained in bio-terrorism cleanup procedures.
0-5 years of experience
Project manager for water and wastewater construction and rehabilitation projects.
- Prepare and review plans, specifications, cost estimates, contracts and reports.
- Review all development plans for compliance with County Standards.
- Perform water system modeling and prepare regulatory reports.
0-5 years of experience
- Engineered joint use solutions for utility companies
- Third party contractor for American Electric Power
- Analyze power distribution lines and poles for safety, clearances, and loading percentage
- Use of computer software and field analysis to calculate loading on power poles
0-5 years of experience
- Investigates utility contracting procedures to assure that they comply with Public Service Law.
- Participates in the operation and maintenance inspection program for liquefied petroleum, liquefied natural, and synthetic natural gas plants by inspecting operating conditions and safety, investigating accidents, reviewing operating and maintenance procedures for compliance with safety codes, and reviewing construction plans.
- Evaluates proposed changes in regulations to determine impact on the utility and the customer and to determine if the proposals are in the public interest