Commissioned the United Conveyor Corp. Fly ash Removal System, Baghouse, Storage Silo’s, Ash Removal PLC system, and all related equipment
- Commissioned the United Conveyor Corp. Bottom Ash Removal System, Storage Silo’s, PLC system, and Related Equipment
- Coordinated the successful completion of the Unit 2 Chemical Cleaning & Steam Blows
- Assisted with the Start-up Activities of the Units 1 & 2 Foster Wheeler Continuous Fluidized Bed Boilers
0-5 years of experience
Mechanical Facilities Engineer responsible for the safe, efficient and matched start-up of Intel’s most advanced semiconductor facility. Responsibilities spanned 23 systems including HVAC, exhaust, vacuum, water and compressed air systems.
- Managed the daily workload of the mechanical engineering team.
- Ensured timely completion of start-up and commissioning activities for Intel’s latest and most advanced semiconductor facility.
- Provided Engineering leadership to coordinate design, construction and commissioning activities.
0-5 years of experience
Testing of equipment to make sure they function correctly and produce the expected results.
- Co-coordinating testing and commissioning activities and providing advice on testing and commissioning procedures and documentations.
- Monitoring progress, recording all test results, witnessing final testing and acceptance of equipment.
- Ensuring the safe testing and commissioning of all equipment.
- Make sure all systems are designed, installed, tested, operated, & maintained according to the operational requirements of the owner or final client.
0-5 years of experience
Combined Cycle Power Plant (2 GE Frame 7FA & One GE D-11 Steam Turbine) – 1/2000 to 5/2000 – under contract
- Developed plant operating procedures
- Balance of plant mechanical start-up engineer: ABB HRSG’s, Feedwater, Condensate, Natural Gas, Closed Cooling Water systems
- Supervised mechanical craft personnel
- ABB HRSG chemical cleaning
- Steam Blow
- System walk-downs to identify mechanical punch-list items
- Trained client operations and mechanical personnel (OJT)
0-5 years of experience
Dry Fork Station Wyoming
- Contracted to Dry Fork Energy Project Mechanical Commissioning & Start-up Engineer. Super Critical (B&W) 420MW(Mitsubishi) Coal Fired Power Plant.
- Tasked with lining out craft for start-up duties.
- Responsible for commissioning of GEA Air Cooled Condenser.
- Coordinated Nooter Eriksen and B&W OEM representatives during commissioning of AQCS, Auxiliary Boiler, Super Critical Boiler, Coal Pulverizers and Mitsubishi Steam Turbine Generator.
- Supported all commissioning and start-up activities.
- Supported steam blows and chemical clean as the lead on nightshift.
- Air blows on instrument air and service air systems.
0-5 years of experience
Responsible for installation and commissioning of all Rotating and Reciprocating equipment on new construction cryogenic air separation plant projects (compressors, pumps, blowers, fans, cooling towers, etc.).
- Coordinate with other commissioning disciplines (Electrical, Instrumentation, Advanced Control Systems) to start-up, test, and troubleshoot multiple, integrated plant systems.
- Ensure vendor fabricated assemblies conform to Praxair and industry standards (ASME, ASTM)
- Provide technical direction to millwright, pipefitter and civil contractors.
- Short-notice, extended-stay travel throughout North America and Internationally
0-5 years of experience
- Responsible for mechanical start-up and commissioning at the worlds first petroleum coke fired boiler (CFB).
- Directly Responsible for commissioning of circulating water, auxiliary circulating water and closed cooling water.
- Responsible for assisting on feed water along with other systems. Equipment consists of 2 x 300 MW STG’s.