- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Production Resume Samples
Pipeline Engineer Resume Samples
No results found
0-5 years of experience
Implemented alarm management program to improve pipeline operations, to identify personnel responsibilities and to gain compliance with Federally Regulated Control Room Management Program
- Oversaw Federal Audit covered by Pipeline Hazardous Material Safety Administration CFR 49 Part 195, which resulted in zero findings
- Performed troubleshooting responsibilities on pipeline safety devices from the field device to the Human-Machine Interface
- Owned the responsibility to respond to and monitor the progression of dig notices via The Illinois One Call System for company owned facilities
- Conducted incident investigation concerning Department of Transportation Part 195 regulated assets which includes: incident background, root cause analysis and implementing corrective actions
- Executed project management responsibilities over a wide-array of complex ventures staying within the budget and allotted time
- Maintained anti-corrosion systems to ensure longevity and functionality of buried structures
0-5 years of experience
Managed capital and expense projects by: developing a project scope, selecting contractors and equipment, managing project and construction activities, and tracking costs.
- Calculated hydrostatic test pressures for repaired or newly installed pipeline segments for the Western Division. Ensured data integrity by regularly auditing, maintaining and updating maximum operating pressure and pressure testing records for 4,100 miles of pipeline.
- Served as company liaison for highway relocation projects with state or government officials and local utility companies.
- Prepared cost estimates and authorizations for expenditure for capital and expense projects.
- Maintained job estimate database in the Sun Pipeline Engineering Estimate Database (SPEED) using Microsoft Access.
- Collaborated in the development and implementation of the Integrity Management Plan.
10+ years of experience
Industrial
Coordinated design, construction and operation of state-of-the-art industrial water and wastewater treatment systems for a major tobacco reprocessing plant.
- Two separate $30,000,000+ wastewater treatment system upgrades were completed on schedule and within budget.
- Coordinated toxicity studies of advanced wastewater treatment processes.
- Directed clean up of pentaborane toxic waste site without incident.
0-5 years of experience
Experience in operating main pipeline system the Eastern Siberia Pacific Ocean with a tank farm 450 000 m3 in permafrost and seismic activity
- Supervising an international in-line inspection of the pipeline Russia-China
- Comprehensive knowledge of hydraulic analysis and modeling, pipe sizing, and oil pipeline threats
- Maintained all engineering drawings, scheduled projects and ensured optimal quality and cost effectiveness
- Supervising of construction and maintenance of road, railroad and water crossings
0-5 years of experience
- Engineered composite materials to provide validated and industry approved pipe repair systems using the Technowrap 2K Repair material
- Ensured the delivery of technical solutions offshore
- Wrapped E-glass fibre reinforcement mat around damaged areas of pipes, pipelines and pressure vessels and then applying an epoxy resin to the reinforcement
- Measured pipe diameter, flow and thickness before repair and ensured all repairs were pressure tested
- Adhered to safety measures in all operations.
0-5 years of experience
Worked on detailed design of Appomattox export oil and gas pipeline systems. Duties included:
- Pressure design according to API RP1111, CFR 192 & 195, ASME B31.4 & B31.8
- On-bottom stability design for shallow water
- Vortex induced vibration fatigue analysis and submerged span identification and analysis
- Management of vendor scope of supply including RFQ creation, bid evaluation, and project management
- Interfaced with stakeholders on non-operated venture to help influence partners to follow internal practices and procedures where possible.
0-5 years of experience
Assisted in engineering ILM’s bleeding-edge VFX pipeline.
- Acted as liaison between engineering and production teams under high-stakes
- Authored python tools for assessing and modifying digital models.
- Authored hundreds of python utilities to integrate various tasks and software
6-10 years of experience
Foroozan offshore Project – Expansion of existing oil platforms to add new living quarter and production facility.
- Supervised a team of engineers, project planners and admin staff.
- Worked on FEED & Detail piping documents for this brown-field project.
- Reviewed and finalized piping specifications, layouts and 3D model review.
- Assisted in selection, review and approval of sub-contractors.
- Participated in numerous technical meetings with EPC contractor, client, and engineering consultant regarding basic and detailed documents, model reviews and safety standards.
- Reviewed tie-in documents between new and existing platforms.
- Performed technical review of P&ID documents.
- Supervised production and manufacturing of pipeline and fittings.
- Performed technical reviews of basic and detail pipeline design documents.
- Provided technical supervision during construction of flow lines and production units.
0-5 years of experience
Knowledgeable in the methods and applications of natural gas transmission pipeline
- Handled the tasks of operating and testing technical specifications of the designed pipeline
- Assisted in risk assessment and improvement of Pipeline Integrity Management System
- Hands on experience in handling pipeline design and construction projects
0-5 years of experience
Company was in charge of gathering, processing, transporting and marketing of natural gas from offshore rigs in Ghana
- Worked in the project and quality control department, I went on routine checks with my supervisor to inspect the progress of construction works going on at the Gas processing plant.
- Reviewed and commented on contracts regarding hydro blasting procedure of pipeline
- Inspected and wrote reports on the terrain where the pipeline that will be carrying the gas was buried
6-10 years of experience
Responsible for pipeline mechanical design – wall thickness determination, span analysis, pipeline thermal expansion, Cathodic protection design, Field Layout, Platform approach, route selection, etc.
- Provide engineering support for gas pipeline operations, pipeline HDD initiation and abandonment details, detailed fabrication and onshore pipeline installation drawings. Management of alignment drawings and design analysis support.
- Prepare specifications for pipeline applications including fabrication and materials, perform supporting calculations for pipeline design.
- Provided design support for pipeline operations and maintenance activities for as built stations, which include general layout, piping and instrumentation diagram, flow diagram, typical mechanical and electrical drawings, fabrication details, schematic drawings.
0-5 years of experience
- Pipeline Integrity – Risk assessments and analysis using the latest technology. Pigging and pressure tests, hydrostatic testing, flow conditions and calculations.
- Pipeline Design – Pipeline calculations, creation of drafts and material requisitions using Microstation V8 XM and/or AutoCAD for compressor stations, heaters, regulator and meter stations, launchers and receivers.
- Manage various consulting projects with interpretation and application of codes, guidelines, and standards.
- Specializing in pipeline design and cost effective analysis methods for leveling platforms.
0-5 years of experience
- Assist engineers in all stages of development, analysis, and presentation of data using Excel spreadsheets and PowerPoint.
- Create, update, and manage database material. Perform literature/data searches and compile summaries of findings for H2S study report in the Eagleford.
- Review and correct P&IDs based on pipe and valve specifications.
- Identify and correct valve tags and piping class based on PVT properties.
0-5 years of experience
Utilize testing facilities for simulation of flow rate through system
- Identify and determine key locations for installations of pump and valve equipment
- Design valve assemblies through Solidworks
- Utilization of Finite Element Analysis software for stress and pressure analysis
- Identify, investigate and assess deterioration/corrosion of pipes
- Code compliance within ASTM/ANSI/US standards