Want a stronger resume? Use our extensive library of resume examples as practical starting guides. You’ll also find ready-made content with our helpful Resume Builder — simple click, customize, and download.
Additional Engineering Resume Samples
Engineering Intern Resume Samples
No results found
0-5 years of experience
Worked with the Continuous Improvement and Operations teams for the Joint Reconstruction division.
- Proposed and led an engineering team of ten through a process improvement project, applying lean A3 methods to improve the traceability and sustainability of inspection tooling while maintaining a 100% calibration rate.
- Analyzed MiniTab to determine sample size and capability when developing validation procedures for internal system changes on manufacturing equipment.
- Reviewed FMEAs for each department to create control plans to empower the machine simultaneously.
- Worked with machine operators to improve manufacturing processes to reduce the number of non-conforming parts.
- Initiated new lean manufacturing projects upon updating outdated department process maps.
0-5 years of experience
Designed a web tool to simulate all analog-to-digital converters (ADC) and digital-to-analog converters (DAC) product parts online during engineering internship.
- Configured 200 old ADC products for the application that clients were still interested in buying.
- Conducted research on domain-specific language (DSL) and their applications to the Models, written in XML.
- Formulated Python Scripts to automatically update the ADC product datasheet and extract information about the properties from the header (.h) and Source (.cpp) files to generate a DSL code based on the information extracted.
- Coined functional groups for the ADC and DAC products, devised code that internally reads the functional groups and created a tree structure in the UI memory map view.
0-5 years of experience
- Studied and improved periodic and emergency maintenance of HVAC units at the gathering centers.
- Collaborated with technicians in the dismantling, maintaining, and installing 200 KVA diesel generators.
- Constructed an FMEA with guidance from shop floor control, resulting in improved quality and safety of shop-floor processes.
- Conducted observation and analysis of personnel to determine time and motion requirements of job duties.
0-5 years of experience
- Designed a centralized oil lab to analyze 70,000 samples per year and performed calculations of equipment and working hours required to process the 20,000 more samples per year.
- Worked on a team to identify hazards that Morenci Concentrator workers encountered, then controlled or eliminated identified hazards to significantly increase employee safety throughout the concentrator.
- Performed root cause analysis of catastrophic failures throughout Morenci Operations, gaining knowledge of conveyor systems, crushers, and heavy equipment mining failures.
- Created an Excel spreadsheet to organize data associated with vital mine equipment that would show.
0-5 years of experience
- Assisted designers with Model Based Definitions and created drawing release packages for various nacelle programs for Engine Build-Up Group.
- Designed fasteners for the design community across the aerostructures business unit.
- Managed standard fittings and connectors using electrical and tubing workbenches within CATIA V5.
- Participated in design & supplier management for the systems/equipment engineering group.
- Aided designers in preparing presentations for PDR and CDR meetings for EBU and Equipment Groups.
- Evaluated extended life for equipment components for legacy aircraft, including latches, electrical harnesses, actuators, hoses, and ducting.
- Taught new interns to use CATIA V5 to model Standard Hardware for the design community at UTAS.
0-5 years of experience
- Established detailed and precise equipment-specific hazardous energy control procedures for various equipment, scenarios, and reasons for lockout to aid in lockout/tagout procedures.
- Streamlined the work permit process.
- Established Safe Work Instructions detailing situation-specific safety precautions, procedures, and required permits for constructing a facility entrance and driveway.
- Created and revised P&IDs for manufacturing equipment and processes, utility piping, water purification systems, etc.
- Updated infrastructure drawings, including the basic blueprint and a customizable building drawing, which could integrate individual detail or utility drawings into a single comprehensive drawing.
- Revised evacuation plans for emergency procedures.
0-5 years of experience
- Led time studies on yarn production operations (spinning/winding, doubling, and twisting) and developed methods to increase production and efficiency, minimize non-value added time, and increase ergonomic safety to determine the expected efficiency per process.
- Monitored and analyzed workflow, processes, and procedures and developed solutions to resolve bottleneck areas to maximize efficiency and productivity.
- Developed outlines for efficiency enhancements and generated improvements to reduce waste through the different yarn production operations.
- Tracked supply room inventory and recorded it into Jomar software.
0-5 years of experience
- Supported the maintenance manager in a variety of tasks.
- Drafted 2-D AutoCAD Schematics to facilitate future installations.
- Performed a plant-wide safety audit, photographing and documenting all sources of concern, and creating a company safety catalog.
- Analyzed yearly expenditures, categorizing costs and determining areas of heavy spending.
- Reorganized company asset filing systems (both paper and electronic).
0-5 years of experience
- Modified and updated electrical lighting/power design work using AutoDesk Revit.
- Communicated with project leads to obtain information required to process the review and design.
- Performed voltage drop and short circuit analysis for single-line diagrams of electrical systems.
- Reviewed submittals to ensure NEC, Title 24 specifications, and standards compliance.
- Assisted the senior engineer/designer in processing RFIs and change orders.
- Completed construction administration and field investigation tasks for assigned projects.
0-5 years of experience
- Analyzed and investigated 320 data trend sheets to improve spray machinery performance.
- Executed two experiments to analyze puffer performance.
- Created a technical inspection manual that educated workers on troubleshooting potential problems.
0-5 years of experience
Ensured production of high-quality nacelle parts according to standard work policies.
- Modified, optimized and monitored manufacturing in the miscellaneous fabrications department, working with other engineers and over 60 machinists.
- Proficient in SAP and Teamcenter, along with other manufacturing programs.
- Trained new associate engineers in SAP, Teamcenter, and manufacturing processes.
0-5 years of experience
- Performed CNC modeling and programming using Siemens NX software and Vericut by CGTech.
- Developed Labview program and assisted with hardware configuration in force measurement.
- Aided in machine vibration frequency spectrum analysis utilizing DC accelerometers.
- Developed algorithm for in-process improvements of CNC hole drilling accuracy using a laser.
0-5 years of experience
- Became familiar with characteristics of transistor technology used in memory components, primarily floating gate transistors used in non-volatile “flash” memory (NAND).
- Collaborated with design engineers to become proficient with their MySQL product testing data.
- Built a web app (PHP) with dynamic forms for users to retrieve and plot desired test data.
- Observed techniques and procedures used by coworkers to validate the performance of NAND components for use in new products.
0-5 years of experience
- Saved over five person-hours per week on the company’s most established product line through Kaizen events.
- Analyze data through statistical process control charts and by conducting hypothesis, normal distribution, and process capability analysis tests.
- Train and supervise first-shift quality assurance leads in quality control documentation.
- Developed value stream maps of product lines for future Kaizen events.
- Write specifications for internal processes that meet the quality assurance manual and military standards.
0-5 years of experience
- Undertook the preparation of quantity take-offs, engineering drawings, maps, and other related graphics as required for construction.
- Assisted in reviewing design documents, detailed plans, specifications, and cost estimates and monitoring contractor’s compliance with projects’ scope and standards.
- Assisted project manager in obtaining state and local permits by coordinating with review agencies.
- Conducted engineering research and provided technical assistance.
0-5 years of experience
- Extensive quality control testing on high-quality silica sand to meet customer satisfaction.
- Prepared yearly product data summaries.
- Conducted daily safety meetings with hourly employees.
0-5 years of experience
- Designed a database using PostgreSQL to track products throughout their lifecycle.
- Developed a PHP database management system that used SOAP communication.
- Assisted in developing and debugging an Android application that used Bluetooth to connect to a prototype device.
0-5 years of experience
- Developed a device that utilizes ultrasonic bone conduction to aid communication in high-noise areas.
- Learned new software and hardware used as testing equipment.
- Analyzed and presented results of research and testing.
0-5 years of experience
- Developed an Excel program to automate the review of transmission outages.
- Reviewed and updated the addition of tie lines and significant projects in the EMS database.
- Created tools and applications to expedite the validity checks of the modeling work.
0-5 years of experience
- Performed final audits in the quality engineering department on various automotive parts before shipment.
- Performed heat treatment effect studies on new parts being launched to assist machinists in creating.
- Assisted in fixture design to load parts more easily into the Coordinate Measuring Machine, improving.
0-5 years of experience
- Updated and documented a hazardous area classification of the unit.
- Updated P&IDs of the unit’s complex cooling water system and wastewater system.
- Collaborated with contractors in cooling water flow studies, reducing Turnabout budgets and increasing equipment’s lifespan.
- Analyzed logistics and costs of turnaround preparations through procedure writing.
- Contributed to the debottlenecking of fugitive emissions.
- Lead the day-long co-op plant tour in Texas city operations.
0-5 years of experience
- Wrote the pilot report to obtain a higher filter loading rate from CDPHE and prepared the presentation that gained verbal approval for the higher filter loading rate.
- Worked on the design of a non-ionic polymer feed system and compared alternatives, cost, and construction schedule.
- Reviewed construction drawings and specifications and conducted water treatment plant design calculations to confirm the sizing of the full-scale plant versus the pilot plant.
- Evaluated the velocity gradient and tip speed of flocculation mixers and alternatives for redesigning the mixers, such as impeller versus paddle-type mixers, to optimize mixing.
- Created a macro program in Excel to automate the creation of monthly filter profiles.
0-5 years of experience
- Cooperated in research under the guidance of an internship advisor within the materials and structures division.
- Determined universal compliance testing methods and documentation techniques for application to Threaded.
- Presented findings of compliance study to peers, government employees, and military officials in an auditorium.
0-5 years of experience
- Implemented backend/middleware of the company’s product analytics website.
- Wrote stored procedures with SQL server management studio to retrieve data from the database and modified data retrieval functions in PHP.
- Helped ensure client-side data retrieval with Ajax calls and wrote unit tests in JavaScript.
0-5 years of experience
- Analyzed mechanical drawings for information concerning various projects.
- Worked with senior maintenance engineers to develop tools/processes to facilitate maintenance personnel.
- Learned the process and procedures of performing non-destructive testing (NDT).
- Initiated ultrasonic testing (UT) PM plan of steel pipes for dozens of turnout structures along the 336-mile-long canal.
- Advanced technical writing skills resulted from compiling and summarizing UT data into company reports.
0-5 years of experience
- Gained experience in all aspects of a custom injection molding facility, including project management, process engineering, tool room/mold making, quality control, and sales.
- Completed laser marking project to reduce the amount of rejected parts.
- Performed several PFMEA to assist in quality control and adhere to ISO-9001:2008 standards.
- Attended daily production meetings to understand the manufacturing process and provide input on the current status of work-in-progress parts.
- Assisted project managers in designing for manufacturability and providing quotations for customers.
- Participated in customer meetings and sales calls to gain business insight and strategies.
Worked alongside process engineers to gain an understanding of machine startup and troubleshooting.
0-5 years of experience
- Created a detailed mass balance and reactor monitor for the Unisar operating unit.
- Made a more detailed, user-friendly update of the refinery product specification report.
- Assisted in FCC Turnaround by inspecting the fractionator column.
- Went through training for confined spaces, fall protection, refinery safety, alkylation safety, and safe work permits and attended weekly safety meetings.
0-5 years of experience
- Created a text overlay to replace the current video overlay unit.
- Overlay to replace current video overlay unit.
- Programmed using Verilog and an FPGA board.
- Tested onboard analog-digital chip for IRIG time capabilities.
0-5 years of experience
- Performed time studies to determine the duration and reason for downtime.
- Worked hands-on with maintenance staff to manually repair and install new machines.
- Started and completed a preventive maintenance program to help reduce asset failure.
0-5 years of experience
- Conducted time observations on assembly lines.
- Created standardized work procedures for building machines on the assembly lines.
- Implemented production plan using historical data and standard time from observations.
- Designed assembly line to increase efficiency based on time observations.
- Re-distributed tasks on assembly lines to reduce bottlenecks.
- Used AutoCAD/Inventor 2012 to create plant layout and laser programs.
- Updated and corrected the bill of materials to reduce excess inventory and make the ordering more accurate.
- Issued engineering change notices for changes to procedures and bill of materials.