- Featured in:
Also, read on to How to Become a Petroleum Engineer.
Additional Sciences Resume Samples
Petroleum Engineer Resume Samples
No results found
0-5 years of experience
Provided reservoir engineering and project management support for field operations, wireline tools testing and other technologies in support of well integrity programs, reservoir monitoring and corrosion.
- Worked with base management to optimize well work program (CAPEX & REVEX)
- Monitored program performance to identify / implement needed interventions
- Progressed Proved undeveloped reserves (PUD) to Proved Developed Producing category
- Participated in P&A and recompletion operations including workover, coil tubing and logging.
- Coordinated, negotiated pricing and supervised several field and yard testing of wireline tools and other projects in collaboration with base management, central petrophysics team and vendors with budget of $400K – $3 Million. Consistently delivered projects on time and reduced cost.
0-5 years of experience
PROJECT AND COST MANAGEMENT – Engineering and geological evaluation on properties in the Powder River Coal Bed Methane Project (working interest in approximately 3,850 wells).
a) Review and sign off on approximately 1,300 to 1,400 company operated and outside-operated AFE’s from drilling locations, subsurface equipment, to surface gathering facilities per year.
b) Evaluate drainage demands and recommend action to Bureau of Land Management.
- ACQUISITIONS, DIVESTITURES, AND TRADES – Evaluated potential and performed economic analysis.
- JOINT INTEREST BILLINGS – Review and approve monthly billings for the Joint Venture and other operators.
- PLAN AND BUDGET – Forecasted and tracked financial investments, revenues, operating costs, and production on all non-operated properties.
- RESERVES ESTIMATION – Determined and booked remaining and ultimate reserves on coal bed methane wells.
0-5 years of experience
Pioneered the planning/executing of the survey campaign related to well integrity investigation in coordination with the production department consisting of ca.1044 drilling water source wells.
- Led inspection and observed Schlumberger LWD corrosions complain and ensured appropriate changes are made to resolve issues faced.
- Scrutinized performance evaluation and key performance indicator system to analyze and eliminate operations slippages and resolved conflicts to enhance team member retention.
- Evaluated and appraised engineering standards and accordingly proposed recommendations for revising company engineering standards.
- Efficiently contributed in the UBD feasibility study and project preparation Cathodic protection feasibility study for Dukhan wells along with geology information in drilling sidetrack wells.
- Responsible for the drilling, work-over and complete standardization of field development study (FDS) project for achieving the long term objectives.
- Actively participated and represented FD department in several committees, meetings and conferences.
0-5 years of experience
Conducted Well by well review on 300 wells that identified 67 wellwork opportunities in GI43
field
- Wrote procedures and executed 28 ‘thru tubing’ projects that added 7300 boed.
- Led platform rig project that surpassed targets for production and costs.
- Performed field wide gas lift optimization project that resulted in twelve (12) redesign jobs.
- Assisted resource team in the successful drilling and completion of two wells.
- Utilized DSS for production forecasting and surveillance.
0-5 years of experience
Supervised and managed daily production operations of Ohio Trenton gas field. Increased gas production three-fold, oil seven-fold. Increase due to evaluation and identification of effective paraffin solvent, properly designed artificial lift systems, continuous well testing and surveillance. Recommended additional mechanical methods of completing gas wells and determined most cost-effective stimulation methods to optimize production.
- Worked with vendors in design/acquisition of well equipment/completion design, sized flowlines.
- Prepared and presented Department of Energy (DOE) proposal to fund Ohio Trenton gas field well work. Completed detailed cost analysis to develop field and upgrade production facility.
- Completed project studies for various Antrim Shale gas fields to evaluate for reworks to optimize production. Evaluated Antrim projects for acquisition.
0-5 years of experience
Identified, developed, and supervised completion procedures based on engineering and geological recommendations that recognized potential stimulation candidates.
- Planned and engineered hydraulic fracturing, acidizing, and cementing procedures for new and recompleted wells, water disposal and well abandonment projects.
- Increased Uintah Basin production by 400 BOPD in a 60-well field over a 2- year period.
- Monitored and forecasted production performance and economics using ARIES software.
- Coordinated compliance with industry standards and applicable governmental controls relative to environmental protection, safety practices and operational regulations.
- Communicated with governmental and private regulatory agencies and industry organizations throughout the permitting process to ensure compliance with applicable regulations.
- Developed, implemented and managed all environmental and safety procedures and programs, monitored operations and trained personnel.
0-5 years of experience
Designed and facilitated training sessions for clients and industry professionals on the application of microseismic technology for real-time monitoring of hydraulic fracturing operations
- Configured an internal knowledge-sharing platform and trained non-engineers on application of petroleum engineering concepts towards optimized reservoir development
- Developed and implemented a blue-print for an internal database incorporating geophysical and field data facilitating streamlined analysis
- Assisted several clients in saving approximately $50,000 per well by establishing a relationship between a patented complexity metric derived from proprietary field data and choice of stimulation agent
- Equipped more than 10 oil and gas operators with an empirical technique that incorporates field recorded data to forecast 30-year NGL and Gas production (Estimated Ultimate Recovery) for wells with limited prior
- Advised domestic and international operators across 3 continents on asset development and investment allocation, via visualization of geophysical response to fracturing treatment
- Reduced the processing and analysis time of field recorded data by 50% by developing Python and Matlab scripts
0-5 years of experience
Managed 45 wells producing 64 mmcfgpd gas from 5 platforms in offshore Louisiana
- Prepared Nodal analysis on producing wells and determined reservoir drawdown limits
- Prepared completion and workover procedures for wells offshore and on land in S. La.
- Supervised lease operators in maximizing production rates with safe drawdown limits
- Monitored and analyzed producing rate histories on wells to forecast future recompletions
0-5 years of experience
Completed two fourteen-day hitches monitoring drilling operations in Eagle Ford Shale formation in South Texas
- Worked with company man, drilling engineer, rig crews, and contractors to build understanding of rig operations, equipment, and systems
- Constructed drilling programs for future South Texas wells
- Analyzed seven wells for H2S pipe corrosion to determine field trend and used results to recommend surface casing pipe selections for future wells, resulting in cost savings of $40,000 per well
- Developed probability distribution of drilling cost and time to demonstrate improved annual drilling performance
- Built teamwork and communication skills through field interaction and corporate office exposure
0-5 years of experience
Executed secondary recovery techniques (water floods, nitrogen acid fracs) on three existing fields.
- Constructed six geological cross-sections on company owned fields.
- Reviewed and assessed production data and 150 well logs on company owned fields and future prospects.
- Ran and analyzed passive seismic data to determine five future drilling locations.
- Onsite company man for the drilling of two new horizontal wells in Taylor County and four new vertical wells in Coryell County.
- Well completion – setting of packer and production tubing on horizontal and vertical wells along with the installation of pump jacks and ESP pumps.
- Performed pressure and production flow backs on six completed wells.
- Constructed two lease contracts on prospects in Cherokee County.
0-5 years of experience
Evaluated proposed new water flood units, like Apache’s EBDU and WBDU.
- Calculated reserves for new infill wells, recompletions and new artificial lift installations.
- Reviewed infill drilling programs in fields where spacing went from 20 acre to 10 acre spaced drilling units. One successful project was in Eddy County, New Mexico. There were 29 wells which average 143 bopd and 197 mcfpd per well. One well produced 710 bopd and 900 mcfpd.
- Designed acid jobs and wrote procedures to stimulate wells in Martin Field increasing production 25 barrels oil per day.
- Designed and wrote the procedures to equip two wells to pump in the Martin Field increasing production 55 bopd.
0-5 years of experience
Ensured facility systems and volumes reporting were in compliance with BLM Regulations.
- Organized and updated filing and information systems in AFMSS database.
- Inspected and maintained records on over 1,000 wells in north-western New Mexico.
- Accompanied certified PETs to P&A and Spudding jobs to convey the importance of health and safety for the workers and the environment.
0-5 years of experience
Analyzed distributed temperature data during and after hydraulic fracturing to optimize the treatment
effectiveness, specific tasks include locating fracture initiation points, detecting fluid movement behind casing, and evaluating the efficiency of bridge plug of each stage
- Interpreted distributed temperature warm back data to estimate fracture scale and flow back rate
- Developed a 2D fracture propagation model during the hydraulic fracturing treatment process based on scientific principles such as mass balance, energy balance, and fluid thermal behavior
- Consulted several major E&P operators on fracture treatment effective in major Texas unconventional
- Resulted production increase by identifying the correct 3 unproductive zones from field data
0-5 years of experience
[company name]: Petroleum Engineer
- Collected geological and geophysical information. Collected engineering data such as production rates, wellhead pressures, cumulative production, well completion, etc.
- Estimated of initial hydrocarbon volume in place by using volumetric procedures, conducted well testing in order to find out the formation characteristics and to evaluate and to predict the well performance.
- Monitored individual well daily oil production that comes from the same type of formation.
- Diagnosed well problems and provided recommendation to improve oil well performance by writing a well work over program such as stimulating the well, optimizing electrical submersible pump, artificial lift, in order to improve the well performance.
- Regular individual well evaluation and formation evaluation.
- Wrote well drilling program and well completion program.
0-5 years of experience
- Coordinated with geoscientists and engineers regarding production enhancement
- Determined reservoir performance for different recovery techniques using decline curve analysis and other models
- Performed reserves quarterly and year-end reporting estimates by using volumetric and decline curve and nodal analyses
- Demonstrated creative and collaborative approach to problem solving
0-5 years of experience
Performed a Subpart O Audit
- Evaluated the production line design for proper safety procedures
- Became knowledgeable about the regulations for a Floating Production Storage and Offloading (FPSO)
- Performed a presentation on API 14C Checklist for Chevron Tahiti Green Canyon Blocks 596, 597, 640 and 641
- Evaluated the flowchart diagrams for Chevron while doing an annual inspection
- Instructed about regulations for offshore production and drilling
- Assisted in annual safety procedures, guidelines, and regulations inspection on drilling rigs and production platforms
Petroleum Engineer Duties and Responsibilities
Based on job postings that we examined, most petroleum engineers share several core responsibilities:
Design and Improve Extraction Equipment One of the central duties of a petroleum engineer is designing extraction equipment and systems to retrieve petroleum from underground or underwater reservoirs. Because each reservoir has unique engineering challenges, the petroleum engineer needs to analyze survey data and perform calculations to ensure efficient removal and prevent environmental contamination at the drill site.
Oversee Well Development and Extraction Petroleum engineers also make frequent visits to extraction sites while developing solutions and planning for well drilling. During these site visits, the petroleum engineer works closely with surveyors and geoscientists to determine the ideal drilling areas and how to build efficient networks of extraction sites throughout the oil field for maximum extraction. Some petroleum engineers remain on site throughout excavation.
Incorporate Injection Methodologies Petroleum engineers also develop and introduce injection methodologies to extraction processes, in which water, gas, or compressed air is pumped into the reservoir to increase pressure and enhance extraction rates. In this aspect of the role, petroleum engineers determine proper filtration methods to prevent contamination and calculate whether the volume of crude oil extracted justifies the cost.
Maintain and Enhance Equipment During extraction, refinement, and transport of petroleum products, engineers also identify opportunities to improve equipment efficiency and longevity by developing maintenance processes and best practices. In this aspect of the role, the petroleum engineer identifies areas for improvement. They also perform calculations for equipment enhancement or replacement to improve extraction rates.
Direct Operational Activities Petroleum engineers also play a central role in operations, determining how to best use technologies to improve methodologies for extraction, transport, storage, and distribution. Petroleum engineers leverage their industry expertise to develop and improve operational activities that save money while ensuring steady production and delivery levels in order to enhance profitability and reduce delays.
Collaborate with Engineers and Technicians From day to day, petroleum engineers interact with a variety of team members, including extraction technicians and engineers. Senior petroleum engineers may direct the activities of team members during the engineering and extraction processes, while more junior engineers may work closely with other engineers and technicians to ensure that all elements of the extraction process work together as expected.
Petroleum Engineer Skills and Qualifications
Petroleum engineers design and troubleshoot extraction systems for oil reservoirs around the world. Workers in this role tend to have at least a bachelor’s degree in engineering and the following skills:
- Analytical skills – petroleum engineers assess data from surveys and geophysical exploration to determine how to safely and efficiently extract petroleum, so they should excel at data analysis
- Industry knowledge – this role also requires up-to-date knowledge of processes and practices within the petroleum industry to ensure that drilling and exploration activities adhere to rules and regulations
- Science and mathematics – petroleum engineers should possess excellent math and physics skills in order to make advanced calculations related to petroleum drilling, extraction, and transport
- Problem-solving skills – in this position, problem-solving skills are vital, since petroleum engineers frequently need to respond to changing conditions at the extraction site and perform new calculations
- Organization and planning – petroleum engineers should also be highly organized and able to oversee activities at the extraction site and throughout refining and distribution processes
- Communication skills – petroleum engineers tend to work with teams of technicians and engineers, so they need excellent verbal and written communication skills
Petroleum Engineer Education and Training
Petroleum engineers need at least a bachelor’s degree in petroleum engineering or a related field such as chemical or civil engineering. Additionally, most companies tend to hire candidates with some practical experience, so cooperative-education programs and internships can also help petroleum engineers increase their employment prospects. Petroleum engineers also need to pass certification and licensing examinations and complete several years of work under the supervision of more experienced engineers.
Petroleum Engineer Salary and Outlook
The Bureau of Labor Statistics (BLS) found that petroleum engineers earned a median annual salary of $132,280 as of May 2017. The highest-paid ten percent of workers in this role earned more than $208,000 per year, while the lowest-paid ten percent earned less than $74,400. The BLS expects employment of petroleum engineers to grow at a faster-than-average pace of 15 percent between 2016 and 2026.
Helpful Resources
If you’re interested in starting a career as a petroleum engineer, we found a number of helpful resources on the web:
Society of Petroleum Engineers (SPE) – the SPE is the largest professional organization for petroleum engineers, providing certification examinations, networking opportunities, and industry publications and news.
Introduction to Petroleum Engineering by John R. Fanchi and Richard L. Christiansen – this book provides a complete overview of petroleum engineering, with practical explorations of geophysics, exploration, and drilling.
American Association of Petroleum Geologists (AAPG) – geoscientists and engineers in the petroleum industry can join the AAPG to access the latest industry news and developments, build their professional networks, and expand their career opportunities.
Introduction to Petroleum Exploration and Engineering by Andrew Clennel Palmer – read this book to learn more about exploration and drilling, along with best practices to prevent environmental contamination and safely extract petroleum from underground reservoirs.